A swim spa only becomes buildable once the drawing set stops describing it as a product and starts describing it as a piece of site equipment. For Outdoor Swim Spa WS-PC07ST, that means sending the manufacturer a short, complete pack of dimensions, access routes, services and intended use. The list below is what our project team works from when a buyer asks for a quotation or a shop drawing.

Start With the Footprint, Then Add Working Clearances

The catalogue record for WS-PC07ST gives a shell size of 7000 × 2400 × 1470 mm. Treat those three numbers as the starting point, not the excavation or pad dimension. What matters on site is how that shell sits relative to everything around it:

  • The finished rim height you want above the surrounding deck, and whether the spa is fully in-ground, partially recessed or raised on a plinth.
  • Deck width on each side. A 2400 mm shell needs room to walk, sit and dry off; send the clear deck dimension you can actually provide.
  • Distance to the nearest wall, planting, pergola post or boundary fence, so we can see whether maintenance access is realistic.
  • Total length of the plot, including any steps, seating or storage bench planned along the same run.

Send a simple dimensioned sketch rather than a rendered perspective. A plan view with overall lengths, widths and offsets answers more questions in one page than three mood boards.

Measure the Route From the Factory Floor to Your Foundation

The most expensive surprise on a swim spa project is a shell that arrives but cannot reach its position. Before we quote freight and handling, we ask buyers for:

  • Delivery address and whether the site takes container traffic or needs a smaller vehicle transfer.
  • Gate width and height, driveway turning radius, overhead cables, and any step or slope between the kerb and the installation pad.
  • Whether a crane, forklift or manual carry is available on the day, and how many people the site can spare.
  • For rooftop, terrace or upper-level positions: the structural loading drawing and the lift or access method planned.

These inputs decide packaging, container type and handling cost. They also tell us early whether a one-piece shell is workable or whether the configuration should change before production starts.

Confirm the Equipment Set You Are Actually Buying

The WS-PC07ST page shows water jets, LED lighting, ozone and a swim training system. The captured specification lists one control system, one swim training system, one filter pump, six jets in total, four LED lights and a total power figure of 6.55 kW. One line we flag openly: the water pump is not listed for this model in the specification we hold, so it must be confirmed as included or added before order confirmation. Do not assume parity between adjacent variants either — WS-PC07ST-L and WS-PC07ST-S share the same equipment counts, but the -L record carries a longer shell at 7490 × 2400 × 1470 mm, and the -S record adds an automatic cover option to the feature list. Model codes are not interchangeable.

Input we need from youWhy it changes the quotation
Model code as written on your enquiry (WS-PC07ST, -L or -S)Sets shell length and whether an automatic cover is in scope
Water pump: confirm included or specify separatelyNot listed for this model in our captured specification
Jet count and layout you want for therapy or exerciseCatalogue shows six jets; layout affects plumbing and seating position
Optional accessories: UV sterilisation, heat pump, sand filtration, insulation, stepsAvailability and compatibility vary by model, so options are quoted per configuration
If your specification document names the model one way in the schedule and another way in the data sheet, send both. We reconcile the naming before production rather than after.

Give Us the Services Data Before Production, Not After Delivery

Electrical and water inputs are the part of the pack most often left blank at enquiry stage. Please supply:

  • Available supply: phase, voltage and frequency at the site, plus the distribution board location and the circuit capacity you can allocate.
  • Where the control system should sit relative to the shell, and how far the cable run needs to travel.
  • Water fill source, drain route, and whether overflow or backflow protection is required by your local installer's design.
  • Heating expectation: year-round use, seasonal use, or warm-climate only. This drives the heat pump and insulation decision rather than a guess from us.
  • Who performs the on-site electrical connection. We confirm the equipment's requirements; your licensed contractor handles local installation and sign-off.

Send the electrical drawing even if it is provisional. A single line showing board to spa saves a week of correspondence later.

Describe How It Will Be Used, Because That Sets the Configuration

Two buyers with the same plot often need different spas. Tell us plainly:

  • Swim training or rehabilitation as the primary purpose, versus family and guest use as the priority.
  • Typical bather count at one time, and whether children will use it unsupervised.
  • Whether the unit sits in a private villa garden, a hotel terrace, or a resort pool deck with shared maintenance arrangements.
  • Water treatment preference — ozone is shown on this model; UV sterilisation is an option to discuss separately.

For hospitality and resort settings we usually bundle the spa with the surrounding outdoor furniture, pergola and screen selection, so rim heights, deck materials and lounge layouts are coordinated in one package instead of three separate orders. Buyers coordinating several trades at once typically work with a one-stop furniture and building materials supplier for exactly this reason: the pool deck, the sun loungers, the shade structure and the changing-room fit-out come from one production schedule.

What Happens After the Inputs Arrive

Once we hold footprint, access route, equipment list and services data, the sequence is straightforward: configuration review, quotation against the confirmed list, production with quality checks, then freight arranged by our Furniture Logistics and Door-to-door Delivery service. Site installation, electrical connection and commissioning are carried out locally to your contractor's design; we supply the equipment requirements and support the handover.

Preparing an enquiry? Send the shell dimension you need (7000 mm or the 7490 mm -L variant), a plan sketch with clearances, the delivery route notes, your supply details, and the accessory list you want priced. That single message is usually enough for us to return a firm configuration instead of a set of follow-up questions.