A smoked glass aluminium front looks effortless in a finished kitchen and costs very little to get wrong — until the order is placed. The mistakes that actually cause rework are not about taste. They are about counting: how many glazed doors, how many matching solid carcasses, which hardware belongs to which leaf, and whether the wall units, tall units and wardrobe fronts were specified on the same sheet. This guide walks through a quantity plan and a coordination checklist you can hand to your supplier, using our Smoked Glass Aluminum Cabinets as the reference product.

Start with elevations, not a room photo

A photograph tells you what the kitchen should feel like. It does not tell you how much to order. Before any quantity is fixed, ask for dimensioned elevations of every wall that carries cabinetry, plus a reflected ceiling plan if there are tall units or overhead lighting. Every line item in your bill of quantities should trace back to one elevation.

Our aluminium frame kitchen cabinets are made-to-measure: finish, layout and dimensions are specified per project, so the drawing is the order. If a run is described only as "about 3.6 metres", expect substitutions at production. Two elevations that look identical can differ by a reveal, a corner return or an appliance housing, and those differences change both the count and the price.

Count in units you can actually install

The most common quantity error is counting metres instead of components. Glass fronts are sold and installed as doors on carcasses, so the schedule has to separate three things: glazed leaves, solid doors that must match them, and the carcasses behind both.

Item to countWhy it belongs in the schedule
Glazed door leaves (smoked glass, aluminium frame)Determines glass area, handle and hinge set, and which openings show contents.
Solid doors in the same frame profileBases and tall pantry sides usually stay solid; they must match the frame colour and section exactly. See Aluminum Frame with Solid Panel.
Carcasses / boxesEach leaf needs a carcass of the correct height, depth and hinge side. Count these separately from doors.
Fixed (non-opening) glazed panelsUsed above wall units or in niches; cheaper than an opening leaf but they still need framing and fixing detail.
Hardware per openingHinges, handles, slides, legs and brackets follow the number of openings, not the number of metres.
Spare leaves and glassOrder spares with the main package; matching smoked glass tint years later is difficult once a project is handed over.

A practical rule: for every opening, list frame colour, glass type, hinge side, handle model and quantity in one row. When that row exists, the supplier can price it without guessing, and the site team can check delivery against a document instead of memory.

Decide what is visible before you decide how much

Glazed fronts are a display decision. Where the contents are attractive — glassware, crockery, a coffee station — smoked glass reads as depth and keeps dust out of sight. Where the contents are bottles, small appliances or cleaning supplies, glass works against you.

  • Mix deliberately. A typical layout puts glazed leaves on the upper wall run and solid doors below, so the visual weight sits at eye level.
  • Keep one family of frames. Mixing frame profiles across a kitchen shows up as an inconsistency in shadow lines. If you want variation, change infill rather than profile — Frosted Glass Aluminum Cabinets gives privacy where smoked glass would still show shapes.
  • Extend the language into other rooms. Wardrobe fronts in the same frame and glass keep a villa or apartment scheme coherent; our Smoked Glass Aluminum Frame Wardrobes are specified the same way, by dimension and layout per project.
  • Plan lighting with the glass. Glazed leaves without internal light become dark rectangles at night. Decide early whether integrated cabinet lighting is required, because it affects shelf depths and drilling.

Coordinate the products that share a dimension

Quantities fail most often at interfaces. Aluminium frame cabinets meet worktops, splashbacks, appliances, flooring and ceilings, and each interface has to be resolved on paper before production.

  • Appliances. Confirm models before carcass sizes are fixed; built-in ovens and dishwashers set the height and ventilation gap of their housing.
  • Worktops and splashbacks. The overhang and edge detail change the finished height of a wall run, which changes door heights.
  • Floor and ceiling finishes. Tall units are dimensioned from finished floor to finished ceiling. If screed or plaster thickness is still open, state the tolerance in the order rather than assuming it.
  • Adjacent joinery. Where cabinets meet a Custom Built-in Kitchen Cabinets run or a wardrobe, one supplier should hold both drawings so the reveal between them is intentional.

Group your order so one package arrives complete

Splitting cabinets across suppliers looks safe and usually costs more in delay. If glazed leaves arrive with carcasses but handles, legs and slides come separately, installation stops at the first wall. We produce kitchen cabinetry as a complete solution — sizes, panel materials, surface finishes and matching hardware such as hinges, drawer slide rails, support legs and connecting brackets — which is what makes bulk project orders manageable across several apartments or villas.

Group by installation sequence rather than by product category: wall units with their glazed leaves and spares; tall units; base units with drawers and slides. Then confirm the delivery order against the site programme, and keep hardware for glazed leaves in a labelled box per unit, because hinge side is invisible until the door is hung.

A pre-production checklist

  • Elevations issued with dimensions, plus finished floor and ceiling levels.
  • Every opening listed: glazed or solid, hinge side, handle, frame colour, quantity.
  • Glass type stated per opening — smoked, frosted or clear — not one blanket description.
  • Appliance models confirmed; ventilation and service gaps shown.
  • Spare leaves and spare glass quantified (state the percentage you want, then check it).
  • Hardware schedule matched to the number of openings.
  • Packaging and container loading planned around glazed items being handled last in, first out.

One thing not to leave open: smoked glass tint is a finish, not a constant. Confirm the glass sample against the frame colour under your own site lighting before production starts, and keep that signed sample with the delivery paperwork.

Questions buyers ask us

Can I order only the glazed doors and buy carcasses locally?

It is possible, but the frame section, hinge drilling and handle positions then have to match a carcass you did not specify. Where this happens, we ask for the local carcass drawing before quoting, so the door leaf fits rather than being adjusted on site.

How many glazed leaves are too many?

Enough to create a rhythm, few enough that the run still reads as cabinetry. In an open-plan kitchen facing a living area, most schemes keep glass to one or two walls and let solid fronts carry the rest — Two Tone Aluminum Frame Cabinets is a common way to hold that balance.

Can the same frame be used in a bathroom or laundry?

Aluminium frames are chosen for exactly this kind of damp, high-use environment, but tell us the room and the cleaning regime when you specify, so the infill glass and hardware are matched to the use.

Send us your schedule

If you have elevations ready, send them with your opening list and we will price the glazed leaves, matching solid doors, carcasses and hardware as one package — then coordinate production, packing and door-to-door delivery for the whole set. For larger villa or apartment schemes, our Turnkey Solutions team can hold cabinetry, wardrobes and the other interior fixtures on a single drawing set so quantities stay consistent from order to handover.