A swim spa of this size is not an impulse purchase. Before a single panel leaves the factory, someone has to confirm that the shell fits the site, that the power supply matches the equipment list, and that a twelve-metre structure can actually be delivered and craned into place. Sourcing it directly from the manufacturer removes one layer of markup, but it also moves the coordination work onto the buyer. The checklist below follows the order in which decisions have to be made, using our Outdoor Swim Spa WS-130CⅢ as the worked example.

Start with the shell and the site, not the finishes

The catalog dimensions for Outdoor Swim Spa WS-130CⅢ are 11830 × 3000 × 1430 mm. That footprint decides more than the water line: it determines whether the unit can pass a side gate, sit on an existing slab, or need a crane and a new foundation. Send your architect's site plan to the factory with the dimensions marked, and ask them to confirm access routes and lifting points before you sign anything.

Do the same for services. The catalog specification for this model shows a total power figure of 10.85 kW across one control system, one swim training system, one water pump, one filter pump, twenty water jets and seven LED lights. Hand that number to your electrician rather than assuming an existing circuit will carry it. Electrical supply, bonding and local wiring rules are the buyer's side of the deal in almost every overseas purchase; the manufacturer supplies the equipment, not the permit.

Read the specification line by line, and ask what is optional

Two models with the same shell can be very different machines. The WS-130CⅢ lists a swim training system as standard equipment; the closely related WS-130CⅢ-U shares the 11830 × 3000 × 1430 mm footprint but is shown with four water pumps, twenty-three jets and five LED lights at 11.85 kW. Check whether the swim training system is included in the variant you are quoted for. If you want counter-current swimming for laps or resistance training, that difference alone should drive your choice.

The features shown for the WS-130CⅢ are water jets, LED lighting, ozone and the swim training system. Catalog-listed options for the range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Heat pump and insulation matter far more than they look on a price list: in a cool climate they decide your running cost through winter, and retrofitting either one after delivery is awkward at best. Ask for the option prices in writing at quotation stage, even if you order without them.

ModelWS-130CⅢ
Catalog dimensions11830 × 3000 × 1430 mm
Control system1 set
Swim training system1 set
Water pump / filter pump1 pc / 1 pc
Jet total20 pcs
LED lights7 pcs
Total power10.85 kW

Put the equipment list, spare parts and controls in one document

The most common complaint about importing a swim spa is not the shell; it is what happens years later when a pump fails and nobody can identify the part. Before production starts, ask the factory for a component schedule: pump brands and models, jet types, control system make, ozone generator, filter model, and the LED fittings. Then order a spares kit with the unit — seals, one filter cartridge, and consumables that wear out first.

  • Request the wiring diagram and control panel documentation in English, as PDFs, not photographs of a manual.
  • Confirm which items are covered by warranty and what proof of purchase or installation record is required.
  • Ask whether the control system can be serviced remotely or needs a technician on site.
  • Keep the component schedule with your building file; it is what a local plumber will need years from now.

Freight, packaging and unloading are the hard part

A unit of this length rarely travels in a standard container as loose cargo. Ask the manufacturer how the spa is packaged, whether it ships as one shell or in sections, what crate dimensions result, and which port nearest your site can handle the delivery. Our furniture logistics and door-to-door delivery service covers freight forwarding by sea, air and rail along with customs paperwork, packing lists, certificates of origin and shipment tracking — but import duty, biosecurity inspection and site access remain things to plan on your side. Get a landed-cost figure that includes inland transport and crane hire, not just the FOB price.

Practical check: before you commit, ask the factory for a packing list with crate dimensions and weight, then have your local lifting contractor confirm the route from the truck to the final position. Reversing this after the container arrives is expensive.

Where installation support fits

Manufacturers differ widely here. Some ship and stop; others coordinate setting, connection and commissioning. Ours lists installation and after-sales support, covering on-site installation, inspection and snag lists, warranty coverage and spare parts. Whatever the arrangement, write down who is responsible for each stage — foundation, electrical connection, plumbing, levelling, first fill, water chemistry handover — because gaps between trades are where projects stall.

Why buy from a manufacturer that also handles the rest of the project

If the swim spa sits on a deck with pergola, sun loungers and an outdoor dining set nearby, the finishes around it come from other suppliers with their own lead times. A one-stop furniture and building materials supplier that also produces swimming pools and swim spas, outdoor furniture, wall cladding, ceilings, flooring and interior fixtures can coordinate those items on one production schedule and in one shipment. For a villa or resort scheme that single point of contact is worth more than a marginally lower unit price.

SANTERSON has been manufacturing furniture and building materials in China since 2008, with custom and OEM work for hospitality, villa and office projects. Published project references include villas in Sydney, Melbourne, Perth and Willoughby. If you are evaluating the WS-130CⅢ for a specific site, send us the drawings and we will confirm configuration, packaging and landed cost against your address.

Send us your site plan

Contact PHILLIP with your project drawings, delivery address and preferred configuration for the Outdoor Swim Spa WS-130CⅢ. We will confirm the equipment list, packing dimensions and a landed-cost quotation.

Phone / WhatsApp: +86-13928214007  ·  Email: santerson@qq.com

Enquire through the contact page