A swim spa the size of a long parking bay, narrow enough to thread between a villa's pool fence and its boundary wall, and deep enough for both lap swimming and a soak after a site visit — that is the brief buyers bring us when they ask about Outdoor Swim Spa WS-PC07ST-L. It is one of the longer shells in our configurable outdoor swim and hydrotherapy range, and it suits villa gardens, resort grounds and staff-facility courtyards where a full pool is out of the question but daily training or guest hydrotherapy still has to fit.
Because the unit is specified rather than bought off a shelf, the enquiry moves quickly once we have the right numbers. This article sets out exactly what we ask a project buyer to send, so the drawing review, the quotation and the delivery plan do not stall in the middle of a programme.
The shell dimensions that drive everything else
WS-PC07ST-L is catalogued at 7490 × 2400 × 1470 mm. Those three figures decide whether the unit reaches your site at all, so treat them as the starting point of the layout rather than a detail to confirm later.
| Dimension | Catalogue figure | What it controls on site |
|---|---|---|
| Length — 7490 mm | Overall external shell length | The swim training lane, the turning space at each end, and whether a truck can set the unit down without a crane re-lift. Measure the run along the terrace or lawn, then measure again allowing for access. |
| Width — 2400 mm | Overall external shell width | Clearance between boundary fence, planter box or building wall. Also the working width for the plant area and for maintenance access to the equipment. |
| Height — 1470 mm | Overall shell height | Water depth for standing exercise, the height of any surrounding deck, and whether steps or a raised platform are needed for children and older guests. |
Send us the finished-level drawing, not the slab pour. We need to know the top of the shell relative to the surrounding paving, because that determines step arrangement, coping detail and how much of the shell you want left exposed versus sunk into a timber deck.
Site access and structural inputs
Before we quote, we want four practical answers:
- Access route. The path from the delivery point to the final position — gate width, overhead cables, tree canopy, turning radius, and whether the surface is pavers, asphalt or soft ground.
- Support base. A level reinforced slab or compacted engineered base, sized to carry the shell when full of water. Confirm the bearing capacity of the ground under any podium, terrace or rooftop position.
- Drainage and overflow. Where the drain line runs, and how backwash and any emergency overflow leave the area.
- Wind, screening and privacy. Exposure on an open resort terrace or a narrow suburban backyard affects screening, wind loading on any cover, and siting of the control panel.
For hospitality projects, add the room or facility the spa serves. A spa positioned for guest use has different opening hours, supervision and maintenance access than one placed behind a villa. Tell us which, and we will place the equipment and controls accordingly.
Power, water and the plant area
The captured specification for this model shows total power of 6.55 kW, with one control system, one swim training system, one filter pump, six jets in total and four LED lights. Treat that figure as the catalogue baseline for the standard configuration: what you actually connect depends on which options you select, so we confirm the electrical load with you against the final build sheet before your electrician pulls cable.
Please supply:
- Supply details. Available phase, voltage and frequency at the nearest distribution board, plus the distance from that board to the spa's equipment zone.
- Circuit provision. Dedicated protection and isolation within reach of the plant area, as required by your local wiring rules.
- Water fill and top-up. A tap connection, plus a softener or treatment source if your water is hard.
- Plant room or equipment niche. Ventilated, weather-protected space adjacent to the shell, with access for service without draining the spa.
Intended use: training, hydrotherapy or both
WS-PC07ST-L ships with a swim training system and water jets, which is why it lands so often on projects where one fixture has to do two jobs. Say plainly how the spa will be used and by how many people at once:
- Lap and fitness swimming. The 7490 mm length gives a continuous swim against the training unit, with room to turn. Tell us whether users are residents doing short daily sessions or guests on a resort programme.
- Hydrotherapy and recovery. Six jets serve seated massage positions. Share any therapy requirement — post-sport recovery, wellness treatment rooms, physiotherapy support — so jet layout matches the intended seated positions.
- Children and casual use. The 1470 mm height means standing depth for most adults; steps and supervision arrangements matter here.
Ozone is shown as a feature on this model, which reduces the chemical load in a spa used several times a day. For a shared hospitality installation we also discuss UV sterilisation as an option.
Options to decide at enquiry stage
The catalogue lists these configurable items for the range; availability and compatibility vary by model, so we confirm each against your selected build:
- Control system upgrade
- UV sterilisation
- Water pump
- Heat pump — set the target water temperature and whether the spa runs year-round or seasonally
- Sand filtration
- Insulation — matters for energy running cost in cooler highland or southern-state climates
- Steps and access arrangement
Within the same shell family, WS-PC07ST is catalogued at 7000 × 2400 × 1470 mm and WS-PC07ST-S at the same 7000 mm length with an automatic cover option shown. If your site is 490 mm shorter than the -L shell allows, or if a cover is essential for safety and heat retention, that comparison is worth making before you commit.
How this fits a wider fit-out order
Very rarely does a swim spa arrive alone. On villa and resort work it lands alongside poolside loungers, shaded pergola and daybed areas, outdoor dining sets, bathroom ceramics for the changing rooms, and the paving or cladding that wraps the deck. Coordinating those items with one supplier keeps finishes matched and deliveries in step. As a one-stop furniture and building materials supplier, we handle that scope from design and custom/OEM production through door-to-door delivery, installation support and after-sales service — which is why swim spa enquiries usually arrive as part of a package rather than as a single line item.
A short checklist to send with your enquiry
- Site plan with the proposed spa position, boundary clearances and access route
- Finished-level and base/slab detail, including bearing capacity for podium or rooftop positions
- Supply details: phase, voltage, frequency, distance to the equipment zone
- Drain, overflow and water-fill arrangements
- Intended use and expected simultaneous occupancy
- Target water temperature and seasonal or year-round operation
- Selected options from the list above
- Related outdoor furniture, bathroom and finish items you want quoted together
Send those inputs with your drawings and we will return a configuration sheet for WS-PC07ST-L — confirmed equipment list, revised electrical load, options priced, and a delivery plan matched to your site access. The same coordination process covers design consultation, custom/OEM production, door-to-door logistics, installation support and after-sales service, arranged around your programme rather than sold as separate line items.