A mixed open and closed wall unit looks simple on a mood board: some shelves on show, some cupboards shut. On site it is one of the easiest items to get wrong, because the proportions depend entirely on how the room is used and where the unit sits in the build sequence. Santerson Mixed Open & Closed Systems belongs to our Modular Living Systems collection and is made to measure for each residential project, with the layout, dimensions, materials and finishes specified by the client rather than chosen from a fixed catalogue. That flexibility is exactly why the brief has to be precise. Below are the project details that decide the specification, written from what we see go wrong on villa and apartment fit-outs.

1. What the unit actually has to store

Before any drawing starts, list the items that will live in the unit and separate them into two groups: things worth displaying and things that must be hidden. Books, ceramics, artwork and glassware work well on open shelves. Linen, paperwork, cleaning supplies, cables and everyday clutter belong behind doors.

Then look at the shape of each item, because this is where the shelf spacing comes from:

  • Tall items such as decanters, vases or a stack of albums set the minimum height of an open bay.
  • Deep items need a check against the carcass depth, not just the shelf width.
  • Small loose items disappear on a wide open shelf unless trays, boxes or drawers are built in.
  • Anything with a cable — a console, a decoder, a speaker — needs a closed bay with a back panel and a way to route the cable through it.

A practical rule: if an item is used daily, close it; if it is looked at rather than handled, open it. Rooms that carry both functions in one wall are precisely where a mixed configuration earns its place.

2. The room and how the wall is used

The same proportions behave differently in different rooms, so tell us which space the unit is for:

  • Living room or media wall. Equipment needs a ventilated closed bay with cable access, while display niches sit at eye level. Keep frequently used discs and remotes within arm's reach of the seating position.
  • Study or home office. Working documents need closed storage; reference books and awards can stay open. Decide early whether a work surface is integrated into the unit, because that changes the base construction.
  • Bedroom and dressing area. Open shelving near a bed collects dust and shows clutter, so it suits folded knitwear and boxes rather than day-to-day clothing. Where storage is mostly concealed, Santerson Closed Modular Units may be the better starting point.
  • Hallway and entrance. This is a high-traffic zone, so keep the lower bays closed and reserve open sections for keys, trays and a mirror rather than display pieces.
  • Shared or child-occupied rooms. Glass-fronted bays and heavy display objects should sit above reach height, with softer closed storage below.

3. Wall dimensions, ceiling height and the obstacles on site

Send us measured drawings rather than an approximate room size. The details that change the build are usually small:

  • Finished floor level — whether flooring is already laid or still to come, since it affects the overall height.
  • Skirting, architraves, radiators, sockets and light switches that sit inside the unit footprint.
  • Recesses, columns, uneven walls and out-of-square corners, which decide whether the unit is built as one piece or in sections.
  • Clearance for doors that swing into the wall, and for any drawer or door that needs room to open fully.

For rooms where storage should read as part of the architecture, a floor-to-ceiling build is often specified — see Santerson Floor to Ceiling Modular Systems. Where the wall should feel lighter, a floating configuration keeps the floor line clear. Both are made to measure; the deciding factor is the measured height and whether services run behind that wall.

4. Materials, finishes and how they meet the rest of the interior

A mixed unit carries more visible edges than a plain wardrobe, so finish selection matters twice: for the carcass and for the open bays that stay in view. Specify:

  • The door material and surface — matte, high gloss, lacquer, veneer or melamine — matched to the cabinetry elsewhere in the project.
  • Whether the interior of open bays is finished the same as the exterior or deliberately contrasted.
  • Edge treatment and handle choice; a handleless front reads quietly on a long wall, while a profile handle suits a more traditional scheme.
  • Shelf material and expected load, since a long open shelf holding books behaves differently from one holding decorative objects.

If the unit must match joinery already specified for kitchens or wardrobes in the same building, send those finish references with the enquiry. Our Custom & OEM Service covers bespoke finishes and textures across wood, metals, engineered stone and laminates, so matching a project palette is part of the normal production process.

5. Lighting, electrical and fixing requirements

Open bays are where lighting pays for itself, but it has to be planned before panels are cut:

  • Decide which shelves take lighting, and whether the light is a line along a shelf edge or a fitting inside a niche.
  • Confirm where the driver and transformer sit — they need to be reachable for servicing, not sealed behind a fixed panel.
  • Tell us which bays carry equipment so ventilation and cable routes can be built into those sections.
  • For Santerson Modular System with Lighting (Living System), agree the switching arrangement on the drawings, not on site.

Fixing method is another site detail. Wall construction — masonry, stud partition, tiled surface — determines the fixings and whether a batten frame is needed. Send wall build-up information with the measurement drawing.

6. Procurement details that affect the whole order

For a project buying several units across apartments, villas or guest rooms, three commercial details shape what we produce:

  • Quantity and repetition. Repeating one approved configuration across many rooms is more efficient than bespoke layouts everywhere. A common approach is one prototype type approved on site, then repeated with measured adjustments per room.
  • Sequence. Confirm whether the unit is installed before or after flooring, decoration and skirting, so the dimensions we work to are correct.
  • Packaging and access. Sectional builds are chosen when lifts, staircases or narrow corridors limit what can be carried to the room.

As a one-stop furniture and building materials supplier, we produce these wall systems alongside the cabinetry, wardrobes, flooring, wall panelling and lighting they sit next to, which keeps finishes consistent across one package. Our Logistics & Door-to-Door Delivery service covers freight forwarding by sea, air and rail with customs paperwork and container loading arranged from our side, and Installation & After-sales Support covers on-site fitting, inspection and snag resolution.

Before you send the enquiry

  • Measured wall drawing with finished heights, openings and obstacles marked.
  • Item list split into display items and concealed items, with the tallest and deepest pieces noted.
  • Finish references from the project schedule or existing joinery samples.
  • Lighting and equipment requirements per bay.
  • Quantities per room type and the required delivery destination.

Related configurations in the same collections

Where a whole wall is being planned rather than a single unit, these pages show how the family fits together: Santerson Mixed Open & Closed Storage in our Integrated Storage Walls range for built-in applications, and Santerson Storage & Display Combo where media equipment is the focus. Specifications such as dimensions, storage layout, finishes and technical performance are confirmed with you for each project configuration before production.

Send your drawings and item list to our team, and we will come back with a configuration proposal and quotation for the exact rooms on your project.