A swim spa of this size is never a single line item on a purchase order. Before the shell reaches the site, someone has to decide how many units fit the layout, which pumps and treatment equipment belong to each unit, who pours the supporting base, who runs the power, and how the surrounding deck furniture and poolside finishes arrive at the same time as the spa itself. This guide walks through that planning for Outdoor Swim Spa WS-130CⅢ-U, using the figures published on our product page and the coordination steps we follow on villa, resort and hospitality projects.
Start From the Published Envelope, Not the Marketing Photo
The catalogue lists WS-130CⅢ-U at 11830 × 3000 × 1430 mm. Treat those three numbers as the fixed envelope your design has to solve for: length, width and depth of the vessel itself. Every downstream decision — access route, crane or rigging point, structural opening, waterproofing upstand, handover clearance for maintenance — is measured from that envelope plus a working tolerance you agree with the site contractor.
Depth drives several decisions at once. The 1430 mm catalogue depth sets how much freeboard sits above the waterline, where the coping or deck edge finishes, and whether steps work better inside the vessel or on the deck outside it. Fix the finished deck level before the base is poured: move it afterwards and the waterproofing has to be redone and the steps re-ordered.
The Published Specification as Your Quantity Baseline
Use the product page specification as the baseline for what one unit contains. For WS-130CⅢ-U the catalogue shows:
| Item | Catalogue figure for WS-130CⅢ-U |
|---|---|
| Catalogue dimensions | 11830 × 3000 × 1430 mm |
| Control system | 1 set |
| Water pump | 4 pcs |
| Filter pump | 1 pc |
| Jet total | 23 pcs |
| LED lights | 5 |
| Total power | 11.85 kW |
| Features shown | Water jets, LED lighting, Ozone |
The same size family also lists Outdoor Swim Spa WS-130CⅢ, which shares the 11830 × 3000 × 1430 mm envelope but is shown with a swim training system and a different pump, jet and lighting count. If your project needs lap swimming in place of hydrotherapy seating, that is the variant to price — and it changes what the electrical engineer designs for, so flag it early rather than at shop-drawing stage.
Counting Quantities Line by Line
Work the bill of quantities in three passes: the spa units themselves, the equipment that belongs to each unit, and the site-side items that are usually bought locally but must be specified before production starts.
Pass 1 — The units
- Number of shells. One per location. For a resort with several pool decks, count by location and note which model each location takes; mixed-model projects are normal, but they need separate specification sheets.
- Configuration per unit. Record the model code exactly as published, so quotations, packing lists and installation drawings all refer to the same thing.
- Spare capacity. Where units sit far from a service base, buyers often order spare wear items with the shells rather than waiting for a second shipment.
Pass 2 — Equipment attached to each unit
- Pumps and jets. Take the counts straight from the selected model's specification; do not average them across a mixed order.
- Treatment and control. The catalogue shows one control set per unit with ozone treatment. Optional additions listed for this range include UV sterilisation, sand filtration, heat pumps, extra water pumps, insulation and steps — each is ordered as a line item, not assumed.
- Lighting. Count the fittings per unit from the specification, then add the transformer and cable route to your own electrical schedule.
Pass 3 — Site-side items you must specify before production
- Base and structural support sized to the published footprint, with level tolerance agreed with the civil contractor.
- Power supply and protection for the stated total power of the selected configuration, including cable sizing and isolation location.
- Drainage, overflow and access to plant and filters after the unit is set.
- Steps, coping and deck edge detailing matched to the finished water level.
Coordination Steps That Prevent Rework
Most problems found on site are not product faults; they are sequencing failures. The checkpoints below remove the ones we see repeatedly.
- Freeze the model code before shop drawings. Drawings produced against a different variant will not match the delivered plant.
- Agree who supplies what, in writing. Our scope covers the shell and its listed equipment; the site contractor normally carries the base, power feed, drainage and deck finishes. Ambiguity here is where costs double up.
- Check the access route against the delivered size. An 11830 mm module needs a clear route from the delivery point to the final position, including gate widths and turning space.
- Sequence power and waterproofing after the configuration is confirmed, not before, since cable sizing follows total power and the waterproofing upstand follows the deck level.
- Book a pre-handover inspection covering jet operation, control response, lighting circuits and filtration cycle while the site team is still present.
Coordinating the Poolside Package With One Supplier
A swim spa rarely sits alone. Deck loungers, a shaded pergola or cabana, storage for chemicals and towels, and the paving or cladding behind the unit are usually bought from different vendors, which is exactly how delivery dates drift apart. Sourcing them together means one production schedule, one container plan and one installation window — the practical benefit of a one-stop furniture and building materials supplier on a villa or resort package.
Within our own range this is straightforward. Where the site geometry does not suit a standard module, we also produce a Customizable Shape Outdoor Spa in square, round, oval and curved layouts with an acrylic shell, which is often the better answer for terraces and irregular garden plots. For the rest of the outdoor deck, see Outdoor Furniture for Villas and Resorts, and the full pool range under Swimming Pools and Swim Spas.
Freight is where multi-vendor packages usually fail. Because we arrange sea, air and rail freight with customs paperwork and door-to-door delivery through Furniture Logistics and Door-to-door Delivery, the spa shell, its optional equipment and the deck furniture can be consolidated into one shipment plan instead of three separate arrivals competing for the same crane.
A Pre-Order Checklist
- Model code confirmed against the published product page, including whether a swim training system is required.
- Pump, jet, lighting and total power figures copied from the selected model's specification into the electrical schedule.
- Optional items — heat pump, UV sterilisation, sand filtration, insulation, steps — listed as separate order lines.
- Base level, waterproofing upstand and finished deck level agreed with the civil contractor.
- Access route verified against the delivered module size.
- Responsibility split for base, power, drainage and finishes confirmed in writing.
- Consolidated shipment plan agreed, with delivery dates matched to site readiness.
Figures quoted above are transcribed from the published product page for this model. Availability of options and electrical requirements vary by configuration and destination, so confirm them against your quotation and technical data sheet before ordering.
Send us the location drawing, the number of units and the configuration you want, and we will return a specification sheet per unit plus a consolidated production and delivery plan for the whole poolside package. Enquiries reach our team through Turnkey Interior Project Solutions, where project scope, drawings and product schedules are handled together.