Aluminium-frame kitchen cabinetry is easy to specify and easy to get wrong on site. The Aluminum Frame with Solid Panel from our aluminium frame kitchen cabinet collection is made to measure, with the finish, layout and dimensions set per project — which means the ordering window, the packing list and the site sequence all have to agree with each other before a single crate leaves the factory. This guide sets out how we plan delivery and installation around that product, stage by stage, so the kitchen arrives ready to install and the joinery crew is not standing in an unfinished room.

What makes this product different to schedule

A solid-panel aluminium frame door is a made-to-measure item: each unit is cut to the dimensions confirmed for the project, so there is no stock to fall back on and no off-the-shelf replacement if a measurement is wrong. Three consequences follow, and they drive everything else in the plan.

  • The site survey comes before production. Openings, services and floor levels have to be final and signed off, because the panels are built to those dimensions.
  • Finish choices lock early. The collection covers material and finish options alongside glass-front variants such as Frosted Glass Aluminum Cabinets, Smoked Glass Aluminum Cabinets and Two Tone Aluminum Frame Cabinets. Mixed door styles in one kitchen are common, and each variant is produced on its own line.
  • Frame and panel work needs a flat, finished substrate. Wall alignment, skirting decisions and floor levels determine how the carcasses sit, so they belong to the trade sequence rather than to the cabinetry order itself.

The coordination timeline we work to

We are a China-based manufacturer and one-stop supplier of furniture and building materials, so delivery and installation planning for our kitchen joinery runs through the same service path as the rest of the package: design and specification, production and quality control, logistics, then on-site installation and handover. For a project using aluminium frame cabinetry with solid panels, that path breaks down into five checkpoints.

StageWhat is confirmedWho signs it off
1. Site survey and dimension sheetFinal openings, ceiling and floor levels, positions of plumbing, electrical and extraction, appliance sizes, skirting and cornice decisionsSite contractor plus our design coordinator
2. Shop drawings and finish schedulePanel layout per unit, door style per run, handle or handleless detail, interior fittings, glass versus solid panel by locationClient or designer of record
3. Production releaseLocked dimensions and finishes; the drawing set becomes the production order and no further changes are absorbed without re-releaseFactory production planning
4. Packing, freight and customsContainer or consolidation plan, crate numbering matched to room-by-room drawings, commercial invoice and packing list, delivery address and receiving arrangementsOur logistics coordinator plus the client's import contact
5. Site readiness and installationWet trades complete, surfaces level and dry, storage area agreed, install crew and sequence confirmed, snag list at handoverSite contractor plus our installation team

The single most useful document in that list is the crate numbering keyed to the drawings. When each crate carries a run reference — island, tall bank, perimeter left, perimeter right — an install crew can work room by room instead of unpacking everything on day one and blocking the rest of the trade programme.

Delivery planning: what we need from site

We arrange freight forwarding by sea, air or rail with customs paperwork and door-to-door delivery, but the receiving end still needs decisions made in advance. For an aluminium frame kitchen these are the practical ones:

  • Access and unloading. Vehicle size at the kerb, lift or hoist capacity for tall carcasses, and a safe route to a dry storage room. Aluminium-framed doors and glass-front units are handled differently from solid panels when it comes to racking and padding.
  • Storage conditions. A locked, covered space with the floor already protected. Panels delivered into a room where painting or tiling is still live pick up damage that no installer can correct.
  • Delivery window aligned with the install crew. Cabinetry arriving weeks early has to be stored; cabinetry arriving late idles the joinery trade and pushes every downstream trade.
  • Inspection on receipt. Open crates against the packing list at delivery, photograph any transit damage the same day, and record missing pieces before the crew leaves. This is what makes a spare-part request quick rather than contentious.

A note for Australian enquiries: import terms, duties, Incoterms, insurance and transit arrangements are confirmed case by case with your logistics contact rather than assumed from marketing copy, and we do not represent local code compliance or installer availability on your behalf.

Installation planning: the sequence that protects the finish

Aluminium frame cabinetry with solid panels installs cleanly when the room is finished around it in the right order. Our on-site guidance follows a simple logic:

  • Complete wet and floor trades first. Tiling, painting, screed and flooring are done, dry and cured before carcasses go in, so no splash or abrasive work touches the frames.
  • Check levels before fixing. Aluminium frames do not forgive an out-of-level run the way a scribed timber case can; shimming and packing decisions are made and recorded at the start.
  • Hang doors last, adjust once. Solid panels are fitted after the carcasses are fixed and aligned, then hinge adjustment is done in one pass so gaps stay consistent across mixed solid and glass fronts.
  • Protect before handover. Countertop templating and fabrication happen against installed carcasses; doors stay protected until final cleaning, and the snag list is signed with the client at handover.

Our installation and after-sales service covers on-site installation, inspection and snags, warranty handling and spare parts. Where a project does not use our installers, we still supply fixing details, crate-to-drawing schedules and remote coordination so the local joinery crew works from the same information.

Common coordination failures, and how to avoid them

Appliance sizes confirmed after production release

Tall housing and integrated appliance bays are cut to the models named on the shop drawings. If an oven or fridge is changed later, the affected units are rebuilt. Confirm appliance schedules before stage 3, not during installation.

Mixed door styles decided on site

A run that switches from solid panel to frosted or smoked glass partway through changes both production and the handle specification. Set the door schedule per run in the finish schedule, initialled with the designer.

Skirting and cornice resolved by the installer

These details change the panel geometry. They belong on the drawing set before release; leaving them to site creates scribing work that was never priced or planned.

One delivery for a phased project

Where kitchen, wardrobes and other joinery are fitted in phases, split the container plan by phase. Our logistics and door-to-door delivery service can consolidate or separate consignments to match the site programme.

How our one-stop supply reduces handover risk

Kitchen joinery rarely sits alone on a villa or hospitality job. When cabinetry, interior fixtures, wall and ceiling finishes and loose furniture come from one furniture and building materials supplier, the drawing set, crate schedule and site programme are produced once and shared across trades, instead of being reconciled between several vendors with different packing conventions and delivery windows. Our custom and OEM service covers bespoke dimensions, finishes and prototyping where a project needs something outside the standard collection.

Planning an aluminium frame kitchen with solid panels? Send us your drawings, appliance schedule and site programme, and we will come back with a dimension sheet, finish schedule and delivery-and-installation plan matched to your trade sequence. Contact PHILLIP on +86-13928214007 or through our contact page.