A swim spa is one of the few hotel amenities that earns repeat use rather than a single photograph. It occupies far less footprint than a pool, can sit on a terrace, podium deck or garden, and it supports both fitness and hydrotherapy programmes. This guide walks through how we at SANTERSON specify Outdoor Swim Spa WS-PC07ST for hotel and resort fit-outs, what to confirm before you place the order, and how the unit is coordinated with the rest of the project package.
Why a swim spa instead of a pool on a tight hotel site
In most boutique hotels, serviced apartments and resort villas the constraints are the same: limited deck area, an existing structural slab, and a brief that asks for a water feature without excavating a full pool basin. A swim spa solves all three. The Swimming Pools and Swim Spas range is built as a self-contained vessel with its own plant, so the civil work reduces to a level base, an electrical supply and drainage provision.
For procurement teams the practical benefit is package consolidation. SANTERSON works as a one-stop furniture and building materials supplier, so the swim spa can be ordered alongside bathroom fixtures, outdoor furniture, lighting, cabinetry and wall finishes under one production and shipping programme rather than through six separate vendors with six separate lead times.
Reading the WS-PC07ST specification sheet
The catalogue entry for WS-PC07ST lists a vessel of 7000 × 2400 × 1470 mm. Treat those figures as envelope dimensions for setting-out: allow working clearance at the plant end and an access route for delivery. The features shown on the product page are water jets, LED lighting, ozone and a swim training system.
| Item | As listed in the catalogue |
|---|---|
| Model | Outdoor Swim Spa WS-PC07ST |
| Catalogue dimensions | 7000 × 2400 × 1470 mm |
| Swim training system | 1 set |
| Control system | 1 set |
| Filter pump | 1 pc |
| Jet total | 6 pcs |
| LED lights | 4 |
| Total power (catalogue) | 6.55 kW |
| Features shown | Water jets, LED lighting, Ozone, Swim training system |
Two points in that table matter for design coordination. First, the water pump is not listed in the captured specification sheet for this model, so pump make, head and flow must be fixed in writing with us before you issue the electrical load schedule. Second, 6.55 kW is the catalogue total power figure; add any heat pump, UV sterilisation or sand filtration you select and re-check the supply with your electrical engineer. We will confirm the final configuration load on the approved submittal drawing.
Matching the model variant to the guest offer
The PC07ST family covers three setting-out cases, and choosing between them is usually a site decision rather than a preference:
- WS-PC07ST — the base 7000 mm configuration with jets, LED lighting, ozone and the swim training system.
- WS-PC07ST-L — a longer 7490 × 2400 × 1470 mm vessel for the same width and depth, used when the deck allows extra swim length.
- WS-PC07ST-S — the 7000 mm configuration with an automatic cover option listed among its features, which is worth pricing where children or unattended hours are part of the operation.
If the brief leans toward massage volume rather than swim length, look at Outdoor Swim Spa WS-PC07A-T in the same 7000 mm family. It is a wider 7000 × 3000 × 1470 mm vessel with a substantially larger jet count and a different power figure, so it reads more as a hydrotherapy spa than a lap unit. We will not pretend one model suits every programme; the choice follows the guest offer you are selling.
Options to decide before the order
Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so confirm each item against the configuration you are buying. For a hotel fit-out we normally settle these during design development, because they change plant location and power, and they determine whether the spa can run all year in cooler southern Australian climates:
- Heat pump — determines whether the spa is a four-season amenity or a warm-months feature only.
- Insulation — affects standby heat loss and running cost where guests use the spa daily.
- Filtration choice — the filter pump as listed versus a sand filtration option, with the maintenance routine written into the operations manual.
- Ozone plus UV sterilisation — chemical load and testing frequency for a commercial guest-facing facility.
- Steps and access — entry height, handrail position and anti-slip surround finish, coordinated with your paving detail.
- Cover — safety, heat retention and debris control; check whether it is manual or automatic for the selected variant.
Site preparation: what the spa needs from the builder
Most of the rework we see on swim spa jobs comes from late coordination between the supplier, the builder and the MEP engineer. Hand over these items early:
- Base — a level, compacted or engineered slab sized to the envelope dimensions plus clearance, checked against the delivered weight with the vessel full.
- Power — dedicated circuit with isolation within sight of the plant, sized on the confirmed configuration load rather than the catalogue figure alone.
- Drainage and overflow — route for drain-down and any backwash discharge, plus a hose bib for filling.
- Access for delivery — crane, gate width or lift route if the unit must cross a lobby, podium or garden to reach its position.
- Plant noise — pump location relative to guest room windows; specify run hours in the operations plan.
Coordinating the spa with the rest of the fit-out
A swim spa rarely stands alone. On a hospitality project it arrives at the same time as the surrounding package: Outdoor Furniture for Villas and Resorts such as loungers, cabana daybeds and shade structures; Bathroom Fixtures for Hotel Projects for the changing rooms; and lighting, paving and wall cladding for the deck itself. Ordering through one supplier means one set of shop drawings, one consolidated container plan and one snag list.
Our Interior Design Services team handles space planning, layout and 3D renderings for that whole scope, and our Turnkey Interior Project Solutions cover villa, hospitality and office work through consultation, design and planning, production, logistics, installation and after-sales. Where a hotel group wants its own badging or a non-standard finish, our Custom & OEM Service covers bespoke finishes and private labelling across the joinery and furniture elements of the package.
Freight, installation and handover
We arrange freight by sea, air and rail with customs paperwork and door-to-door delivery, then Installation & After-sales Support covers on-site commissioning, inspection with a snag list, warranty coverage and spare parts. Australian import terms, duties and transit arrangements are confirmed case by case for each project, so ask us for the landed-cost breakdown for your site rather than assuming a standard rate.
At handover we provide the configuration documentation, chemical dosing and filtration routine, and the plant schedule needed by your facilities team. Ask for these in writing at quotation stage; they belong in the O&M manual, not in a chat thread after opening.
A short selection checklist
- Deck measured against 7000 × 2400 × 1470 mm envelope, with clearance and delivery route confirmed.
- Variant fixed: WS-PC07ST, WS-PC07ST-L for extra length, or WS-PC07ST-S where the automatic cover option is required.
- Pump, heat pump, filtration and sterilisation specified in writing, with final power load signed off by your engineer.
- Slab, drainage and dedicated circuit released to the builder before production starts.
- Surround furniture, lighting and paving ordered in the same package and container plan.
- Local barrier, water-quality and electrical requirements confirmed with your certifier.
Send us the deck layout, target guest programme and opening date, and we will return a configuration for WS-PC07ST with dimensions, options, power load and a consolidated package quotation covering the spa and the surrounding fit-out. Enquiries go through our contact page; business hours are Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).