A swim spa that fits the plant room, the budget and the programme is rarely won at the quotation stage. It is won in the line-by-line comparison before the proforma invoice is raised. If you are sourcing Outdoor Swim Spa WS-PC01A for a villa, resort or private residence project, the model name alone tells you very little. Below is the comparison sheet we would ask a purchasing team to build — with the figures this model actually carries and the questions that change those figures.
Start with the footprint, not the jet count
WS-PC01A is listed at 3000 × 930 mm. That single number drives almost everything downstream: whether the unit passes through your access route, what slab or plinth you pour, how much excavation and backfill you allow for, and whether the spa sits on a terrace, in a sunken pit or against a pool edge. Depth is usually the constraint buyers miss — 930 mm changes seat heights, step arrangements and drainage falls far more than most specification notes assume.
Compare the footprint against the rest of the configurable range before you commit. The Outdoor Swim Spa WS-PC01, for example, shares the same 3000 mm plan length but is listed at 1050 mm deep with a different jet layout. Same room, different experience — and a different pump load.
Read the specification as a configuration, not a fixed build
The published figures for WS-PC01A are:
| Item | Catalogue listing for WS-PC01A |
|---|---|
| Dimensions | 3000 × 930 mm |
| Jet total | 28 pcs |
| Water pump | 2 pcs |
| Filter pump | 1 pc |
| Control system | 1 set |
| LED lighting | 1 pc, plus 9 small LED lights |
| Total power | 3.25 kW |
| Features shown | Water jets, LED lighting, Ozone |
Two lines deserve a written answer rather than an assumption. First, swim training system: not listed. If your end user expects counter-current swimming lanes, that is an add-on decision, not something the model code guarantees. Second, total power 3.25 kW reflects the base configuration. Add a heat pump and the electrical design changes completely — supply size, protection, cable run and, on some sites, whether three-phase is available at all. Ask for the power figure of the exact build you are buying, in writing, before your electrical contractor prices the works.
Price the options list separately
The catalogue lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options. Availability and compatibility vary by model, so treat each line as a separate quotation item with its own confirmation. Two practical traps:
- Insulation. On an outdoor unit in a cooler climate, the shell is only half the answer — lid, cavity insulation and the controller's idle behaviour decide what you pay to hold temperature. Ask which insulation package is quoted, not whether the spa is "insulated".
- Filtration. A 1 pc filter pump in the base specification does not tell you micron rating, run hours or cartridge access. Sand filtration is an option; if you take it, ask where the media valve sits and how much service clearance you need to build around it.
Compare what happens after the container arrives
A swim spa is a small plant installation: crane or rigging, a level structural base, drainage, an electrical sub-main, and commissioning. Where the spa is one line in a wider package of fixtures and finishes, it is worth sourcing through a logistics and door-to-door delivery arrangement so that freight, customs paperwork and site delivery sit with one party rather than three. Our services cover the same chain end to end — design consultation and space planning, production coordination, logistics, installation support and after-sales — which is why buyers adding a spa mid-project usually bring the rest of the fit-out into the same scope.
Ask specifically who attends commissioning, what gets handed over (wiring diagrams, pump and controller documentation, spare-parts list), and how replacement nozzles, seals and control boards are supplied later. Jet count is easy to compare; parts availability three years in is where quotations actually differ.
A six-point comparison sheet before you order
- Confirmed dimensions of the quoted build — plan, depth and step arrangement — checked against your access route and slab.
- Jet count and jet types per seat position, not just a total.
- Total power for the exact configuration including heat pump, with supply requirements stated.
- Which of UV, ozone and sand filtration are included, and which are optional extras.
- Written confirmation on whether a swim training system is fitted or excluded.
- Delivery terms, site set position, commissioning attendance and spare-parts route.
Note: the figures above are transcribed from the published catalogue entry for this model. Treated as a configuration baseline — confirm included equipment, electrical requirements and options for the specific build before ordering.
Send us the room dimensions, the intended use (hydrotherapy, lap swimming or guest amenity) and your target installation date, and we will quote WS-PC01A as a defined configuration — with the option lines priced separately so you can compare it like for like against any other make. More configurations in the same range are listed under our product catalogue. As a China furniture and building materials manufacturer, we also coordinate cabinetry, ceramics, lighting and outdoor furnishings for the same project, so enquiries go through the contact page with the whole scope in one place.