A swim spa specification is never really about one model number. It is about the envelope you can build, the use you expect from the water, and the equipment package that has to arrive with it. This guide uses Outdoor Swim Spa WS-130BⅢ as the reference point and shows procurement teams how to test the alternatives around it before a quotation is confirmed.
Start With the Reference Specification
WS-130BⅢ sits in our configurable outdoor swim and hydrotherapy range. The published catalogue entry lists an overall envelope of 9950 × 3000 × 1430 mm, with a control system, a swim training system, one water pump, one filter pump, twenty jets and seven LED lights, at a total power figure of 10.85 kW. Treat those numbers as the baseline you are comparing against, not as a fixed purchase order: included equipment and electrical requirements depend on the configuration finally selected for the project.
Once that baseline is on paper, the evaluation becomes a set of concrete questions rather than a brochure comparison. Below are the four that decide which model in the range should actually be specified — and when a different type of spa is the better answer.
1. Does the Site Envelope Accept the Length?
A swim spa is built on a slab, deck or terrace, and the shell width stays close to 3000 mm across this range while the length changes. That means the decision is usually driven by available run, not by width.
| Model | Catalogue dimensions (L × W × H, mm) | Swim training system shown |
|---|---|---|
| Outdoor Swim Spa WS-130AⅢ | 8000 × 3000 × 1400 | Yes |
| Outdoor Swim Spa WS-130BⅢ | 9950 × 3000 × 1430 | Yes |
| Outdoor Swim Spa WS-130CⅢ | 11830 × 3000 × 1430 | Yes |
Where the terrace run is tight, the shorter unit in the same family is the practical alternative and you keep the swim feature. Where a villa or resort layout allows an 11.8 m run, the longer unit buys more separation between the exercise channel and the seating end. Depth also moves slightly across these models, so confirm it against user height and intended use rather than assuming one depth suits everyone.
2. Is the Swim Feature Central or Optional?
This is where two visually similar models can differ most. The U variants in the range are listed without a swim training system, while their non-U counterparts carry one. WS-130AⅢ-U, for example, is catalogued at 8000 × 3000 × 1400 mm with four water pumps, twenty-three jets and five LED lights at 11.85 kW — a hydrotherapy-led specification rather than a lap-swimming one.
So the first filter is honest use. If the brief calls for daily swimming against a current, specify a configuration where the swim training system is listed as included and ask what it consists of in that build. If the brief calls for soaking, massage seating and evening use, a U variant may be the more efficient allocation of budget.
Compare Jet Count With Purpose
Jet totals differ between configurations — twenty against twenty-three in the two examples above. A higher count is not automatically better for a project; what matters is where the jets sit relative to the seating and lounger positions your client plans to use, and whether the pump arrangement behind them supports that layout.
3. What Does the Power and Plant Room Picture Look Like?
Total power is one of the few figures that directly touches the electrical contractor's scope. A difference of roughly one kilowatt between two candidate configurations changes circuit sizing, protection and, in a hospitality setting, the distribution board it lands on.
- Ask for the confirmed total power of the exact configuration, not the range average.
- Confirm supply phase and voltage available at the installation point before finalising the model.
- Check whether heat pumps, UV sterilisation, sand filtration or additional water pumps are quoted as options; each changes both load and plant space.
- Agree who supplies the isolator, control wiring and any remote control interface, and in which stage of the programme.
Catalogue options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option should be confirmed line by line on the quotation rather than assumed from a datasheet.
4. Standard Shell or Shaped Installation?
Rectangular shells in set lengths cover most villa terraces and hotel pool decks, and within one family you can usually move between lengths without changing the structural approach. When the design instead calls for a curved bay, an inset position, or a spa that follows a terrace edge, a shaped unit becomes the alternative worth pricing. Our customisable shape outdoor spa is produced in square, round, oval and curved layouts on an acrylic shell with structural reinforcement, which lets the water feature sit inside a landscape scheme rather than beside it.
Where the programme needs exercise and relaxation in one vessel, a long outdoor swim spa combining a hydrotherapy zone with a relaxation pool is another route. That approach trades a larger envelope for a clearer split of use — practical for family villas and resort suites where two people want different things from the same installation.
A Procurement Checklist Before You Commit
- Site drawing with finished levels, slab or deck detail, and a marked service access zone.
- Confirmed model code and configuration list, including whether the swim training system is included.
- Total power and supply requirements for that exact build, signed off by the electrical contractor.
- Options priced explicitly: heat pump, insulation, steps, filtration type, sterilisation, lighting scenes.
- Delivery route, packaging and lifting plan to the final position, agreed with the logistics coordinator.
- Commissioning, snag inspection and spare-parts responsibility recorded in the purchase documents.
Working through those six items removes most of the disputes that appear late on site. It also makes it straightforward to swap between two configurations, because each one has been priced against the same envelope and the same services.
Specify With the Full Package
Swim spas sit within our wider range of outdoor and poolside products for villas, resorts and hospitality projects. Send us your site drawing and intended use, and we will confirm which configuration in the range fits the envelope, the power supply and the programme — including freight to site and installation support.