Open modular units look simple on a drawing — a run of shelving, some open display niches, a few closed cabinets mixed in. They are unforgiving in the field. Because the components are made to measure and assembled against real walls, the quality of the finished installation depends almost entirely on what you hand over before production starts. This guide sets out the measurements and project inputs that let a manufacturer price, build and deliver an open modular unit scheme without guesswork.
Why open modular units are so sensitive to dimensions
Modular living and shelving systems are built from repeatable modules: shelf bays, drawer units, closed boxes, display niches. Each module has a fixed internal geometry, and the run is fitted together on site. Two consequences follow.
First, an error of a few centimetres in a bay width or a floor height does not simply shrink one shelf — it changes how many modules fit, where vertical dividers land, and whether a floating unit can be fixed safely to the substrate behind the finish. Second, open-fronted components expose everything. There is no door to hide an out-of-plumb wall, an uneven floor level or a service run that was meant to be concealed. That is why we ask for surveyed dimensions rather than architectural nominal sizes, and why every configuration is confirmed against the site condition before manufacture.
The measurements we need
Take these on site after the wall finishes, floor finishes and ceiling set-out are fixed. Where finishes are not yet decided, tell us what they will be and how thick they are.
| Input | What to record |
|---|---|
| Overall run length | Finished length of the wall from one finished face to the other, measured at three heights. Walls are rarely straight; report the smallest and largest reading. |
| Floor to ceiling height | Finished height at each end and at the middle of the run. For floor to ceiling modular systems, also state the ceiling construction and whether the unit is permitted to bear on it. |
| Vertical obstructions | Position and size of power points, switches, data outlets, thermostats, downlights, air diffusers, sprinkler heads, radiators and pipework — measured from a fixed corner, not from another fitting. |
| Substrate and fixability | Wall build-up (masonry, stud and lining, existing joinery), plus where solid blocking or noggins exist. For wall-hung components, state the load path you intend us to rely on. |
| Floor level and squareness | Level difference across the run, and whether the two walls meeting at a corner are square. Report any intended return into an adjacent room. |
| Projection limits | Maximum depth allowed by circulation, doors that swing across the wall, seating, or a staircase edge. |
Choose the mounting type early
The same layout can be built standing, hung, or partly both, and each choice changes what we need from you. Floating modular systems leave the floor clear and read as lighter, but they require a proven fixing detail and an agreed clearance to the floor. Standing runs transfer load to the floor and tolerate modest out-of-level through adjustable feet. Metal frame modular systems in the shelving range give a slimmer profile for wall systems, where the frame rather than the panel carries the load. Decide which of these your design intends before we quote, because hidden supports and blocking must be coordinated with others on site.
Project inputs beyond dimensions
Alongside the survey, a workable enquiry includes:
- Room and use. A living room library, a bedroom wall combining open modular wardrobes with closed cabinets, and a display wall in a lobby each carry different load, durability and fire expectations.
- What the unit must hold. Books, tableware, artwork, equipment or stock — and roughly how heavy. Shelf spans are set by load, not appearance.
- Open-to-closed balance. Say how much you want on display versus behind doors; mixed runs combine open bays with closed modular units to keep the composition calm.
- Materials and finishes. Substrate, veneer or lacquer, edge treatment, hardware style, and any sample you are already working to. Match reference comes from a named finish, not a photograph.
- Integrated services. If the design includes modular systems with lighting, provide driver locations, switching arrangement, dimming protocol and where the cable is meant to be routed.
- Programme and destination. Site completion date, required delivery window, port or site address, and who receives the goods. Freight and installation slots are planned around your dates, not ours.
How these inputs move through our process
SANTERSON is a China-based furniture and building materials manufacturer working on residential, villa and hospitality projects, and modular joinery is one part of a wider fit-out that may also include wardrobes, kitchen cabinetry, wall panelling, doors, flooring and lighting. That combination matters when you are specifying modular units, because the tolerances of adjacent trades arrive in the same wall.
For each enquiry we work from your brief to a proposed layout and quotation, then confirm details — dimensions, finishes, hardware, electrical provisions — before production. Our custom and OEM service covers bespoke sizes, material and finish choices, and prototyping where a project needs a first article checked. After manufacture we arrange freight, customs paperwork and door-to-door delivery, then installation support and snagging on site; see logistics and door-to-door delivery and installation and after-sales support. Send the measurement set above with your drawings and we can price a specific configuration rather than an approximation.