An open-plan kitchen is rarely the last decision on a project drawing set. It is usually the first thing a buyer or client sees when they walk in, which is why open concept kitchen cabinets sit at the centre of so many villa and apartment fit-out conversations. When that cabinetry has to be manufactured by a China-based factory for a project overseas, the question stops being "which door colour" and becomes "how does the sourcing actually run". Below is how OEM procurement of modern open style interior fixtures works in practice, stage by stage, using our own Custom & OEM Service as the working example.
First, separate custom work from OEM work
Buyers use both terms, but they cover different jobs. Custom work means we develop the cabinetry around your drawings and space: layout, dimensions, storage structure, door profile and finish are all set to your brief. OEM work means you already have a design language, a catalogue or your own brand, and our factory produces to that specification under your name — including engraving, embossing, logos and packaging.
For an open-plan kitchen the two often overlap. The carcass and internal fit are engineered to the site dimensions, while the door panels, hardware and finishes follow a standard you have already fixed across several apartments or hotel suites. That combination is the most common OEM brief we receive for open plan kitchen cabinetry supplied to multi-unit projects.
Stage 1 — The brief and the drawings you need to send
Everything downstream depends on what arrives in the first email. For open-concept cabinetry we work from:
- Room elevations or a measured floor plan, including ceiling height, window and door openings, and the position of wet areas.
- Appliance schedule — oven, cooktop, rangehood, dishwasher, fridge and any integrated tall units, with model numbers where possible.
- The finish direction: sample references, a Pantone or RAL code, or a physical sample you are holding.
- Quantities per unit type, plus the total number of repeating units across the project.
- Your target delivery destination and preferred Incoterms.
If your design team has not resolved these yet, our interior design services step in at space-planning level before quotation. In practice this saves a revision round later, which is the single most expensive delay in cabinetry procurement.
Stage 2 — Specification, sampling and quotation
Once the drawings are readable we lock the specification: board material, door construction, edge treatment, hardware brand and opening action, worktop interface, and the detailing where the cabinetry meets flooring, wall panels and ceiling. For open shelving and display niches in the same run, we also fix load support and integrated lighting provisions at this point, because retro-fitting cable routes after production is not clean.
The quotation follows the specification, not the other way around. It should state unit rates by configuration, packaging and container loading plan, tooling or one-off costs if any, and what is excluded. We quote flexible minimum order quantities, which matters for a first villa trial order before you commit to an apartment block.
Stage 3 — Production and the checks that matter
Production starts after drawing sign-off and deposit. For open style fixtures we concentrate inspection on four points, because these are where project disputes actually arise:
| Check point | What is verified |
|---|---|
| Panel and edge quality | Surface consistency across the whole batch, edge banding alignment, no telegraphing on high-gloss or lacquer doors. |
| Dimensional accuracy | Cabinet heights, depths and scribe allowances against signed shop drawings, so on-site levelling stays within tolerance. |
| Finish continuity | Colour and sheen matched between door panels, drawer fronts, tall units and any matching custom built-in kitchen cabinets supplied for the same project. |
| Hardware and function | Hinge and runner operation, soft-close function, door gap consistency, and fit of integrated appliances. |
Stage 4 — Packaging, freight and handover
Cabinetry travels badly when it is packed as furniture rather than as components. We pack panels by unit type with corner protection, mark each bundle to the shop-drawing reference, and plan container loading against the site delivery sequence so the first bundle off the truck is the first one installed. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, commercial invoices, packing lists, certificates of origin and customs paperwork.
On arrival, installation and after-sales support covers on-site installation, inspection with a snag list, spare parts and replacement. Australian buyers should confirm import duties, Incoterms and delivery scope for their own site rather than assuming a standard arrangement — terms are set case by case.
What to check before you place an OEM order
- Ask for a full-size door sample and a carcass corner sample, not just a finish swatch.
- Require signed shop drawings with dimensioned elevations before production release.
- Confirm which party owns site measurement — factory-supplied cabinetry only fits if the opening dimensions are current and verified.
- Agree the finish tolerance in writing, including how metamerism (colour shift under different light sources) will be judged.
- Order spares with the main shipment: a couple of door panels and hardware sets per unit type are cheaper in the original container than in a later air freight.
Figures, terms and service scope described above reflect our published service pages; final specifications, minimum order quantities, lead times and commercial terms are confirmed per project.