A submittal is the document package a contractor, designer or client reviews before cabinetry is released for manufacture. For frosted glass aluminum cabinets, the submittal carries more weight than it does for a plain solid-door run: a translucent front reveals what is behind it, an aluminium frame fixes tolerances early, and every unit in our collection is made to measure. A thin submittal invites change orders at the worst possible moment — after the glass is ordered. Below is the package we ask project teams to assemble, section by section.

1. Scope drawing set with real dimensions

Frosted glass aluminum cabinets in our range are supplied as made-to-measure units, so the submittal must show the actual site dimensions rather than a catalogue elevation. Submit:

  • Plan and elevation drawings for every run, with overall width, height and depth marked on each unit.
  • Wall-to-wall and floor-to-ceiling measurements taken on site, plus out-of-plumb and out-of-level notes where walls are not true.
  • The interface conditions: adjacent wall finishes, worktop thickness and edge detail, skirting or tile lines, and any services that pass behind the carcase.
  • Clearance dimensions for door swing or sliding travel, including handles and knobs if they are specified.

Where a unit sits next to a window reveal, a beam or an appliance column, draw the reveal explicitly. Framed glass fronts cannot be trimmed on site the way a timber door can be planed, so the opening you submit is the opening we build to.

2. Frame profile and finish schedule

The frame defines the look more than anything else on a glass-front cabinet. Our aluminium frame kitchen cabinet collection is offered with material and finish options, so the submittal should name each one instead of leaving it to a mood board. Record:

  • Frame colour or finish and whether the surface is matte, textured or gloss.
  • Profile style and approximate sightline width, so the designer can confirm the shadow gap reads correctly against tiling or panelling.
  • Finish continuity with other framed elements in the project — wardrobes, display cabinets, niche paneling and doors often repeat the same profile, and a mismatch only becomes obvious once both are installed.

If the project uses a two-tone scheme, submit the frame finish and the carcase finish as separate line items. Two-tone aluminium frame cabinets need both finishes confirmed before cutting, because the solid panels and the framed fronts are produced as different components.

3. Glass specification: type, colour and opacity

This is where most queries arise. "Frosted" covers several different products with very different visual results, so the submittal should state which one is being supplied and show a physical reference.

Item to specifyWhat to record in the submittal
Glass typeFrosted, reeded or ribbed, clear, tinted or mirrored — and whether the front is single glazing or laminated.
Opacity / etch sideWhich face carries the finish, and how much silhouette shows through. Frosted softens contents; clear and smoked glass fronts reveal them.
Tint name and referenceUse the supplier's own tint name plus a sample reference. Bronze, grey and neutral tints shift noticeably against different worktop colours.
Edge treatmentPolished, seamed or bevelled edges, and whether edges are visible from the room.
Breakage and handling termsHow replacement glass is ordered and shipped for a unit already in container.

Approve a physical sample board before sign-off. A frosted panel photographed on a white background tells you almost nothing about how it behaves against a dark splashback or under under-cabinet lighting.

4. Interior layout and hardware

A glass front is a promise about the interior. Whatever is stored inside becomes part of the design, so the submittal should show it. Include:

  • Shelf positions, shelf depths and load notes for heavier items such as glassware or appliances.
  • Drawer configuration and internal fittings — cutlery organisation, pull-out trays, lazy susans in corner units, and tall-unit pull-outs.
  • Hinges, slides, handles and any push-to-open mechanism, with the brand or model series named.
  • Integrated lighting: fitting type, colour temperature, transformer location and how it is accessed for maintenance. Integrated cabinet lighting behind a frosted front glows visibly, so the cable route and switch point need to be drawn.
  • Appliance integration where relevant — oven housings, fridge panels, ventilation paths and service gaps.

5. Application context and compliance responsibilities

State plainly whether the run is residential or commercial. Our aluminium frame cabinets are specified for apartment kitchens, villa kitchens and serviced-apartment fit-outs; a hotel or public-venue application brings different questions about glazing safety, fire strategy and maintenance access. The submittal should record who is responsible for confirming local building requirements — normally the local designer of record or certifier — and which items they need from us: dimensions, fixing details, glass make-up and weight per unit.

For imported projects this matters more than it does domestically, because nobody on site can quietly re-manufacture a panel. Fixing details to masonry, timber studs or tile should be drawn, not assumed.

6. Site conditions and tolerances

Include the conditions the cabinets will actually meet: finished floor levels confirmed, wall finishes complete, first-fix plumbing and electrical positions set, and the room's humidity and temperature regime for a coastal or poolside-adjacent kitchen. Note where we are expected to scribe, pack out or shim, and confirm who supplies and installs those make-good items.

7. Commercial and logistics schedule

The last section of a submittal is administrative, and it is the part that protects the programme:

  • Unit-by-unit schedule with item numbers matching the drawings.
  • Made-to-measure confirmation: dimensions signed off against site measurements, not shop drawings alone.
  • Production sequence and split shipments where phases are needed on site.
  • Packaging and crate labelling that matches the room-by-room delivery plan, plus container loading sequence.
  • Incoterms, freight mode and door-to-door delivery scope, customs documents, and named receiving party at destination.
  • Inspection window on arrival, snag list process, spare-parts route and who signs the handover.

Who prepares this? As a one-stop project furnishing supplier, we assemble the submittal package with the project team rather than waiting for a fully drafted one — drawings from your side, product and finish data from ours. Our interior design service covers space planning, material selection and production coordination, so a kitchen that also needs wardrobes, doors, wall panelling, flooring and lighting can be submitted as one coordinated package instead of six separate trades.

A quick pre-submission check

  • Every unit dimensioned from site measurements.
  • Frame finish and profile named, with a sample reference.
  • Glass type, tint and opacity approved from a physical sample.
  • Interior layout, hardware and lighting drawn, not described in words.
  • Responsibility for local code review stated.
  • Delivery sequence, labelling and inspection process agreed in writing.

Frequently asked questions

Can frosted glass aluminum cabinets be resized after manufacture starts?

Not practically. Framed fronts and cut glass are made to the submitted dimensions, so changes should be made before release for production. Late changes mean remanufacture of the affected units.

What is the difference between frosted and smoked glass fronts?

Frosted glass diffuses light and blurs what sits inside; smoked or tinted glass is clearer but darker, so contents remain visible in silhouette. Choose based on whether the interior should read as storage or as display.

Do we need to submit a sample for every room?

One approved frame-and-glass sample set per project is usually enough, provided it is reviewed against the actual worktop, splashback and lighting scheme rather than on its own.

Can the kitchen submittal be combined with other joinery in the project?

Yes. Coordinating custom built-in kitchen cabinets with wardrobes, media walls and panelling in one submittal avoids finish mismatches between rooms and consolidates production and shipping.

Send us your drawings and the room schedule, and we will return a submittal package for review — dimensions, frame and glass specification, interior layout, hardware and a delivery plan matched to your site programme. More about the collection is on the frosted glass aluminum cabinets product page.