A swim spa of this size is not an off-the-shelf purchase. Before we can price Outdoor Swim Spa WS-S08B properly, we need to know how you intend to install it and which equipment you want inside the cabinet. This guide lists exactly what to send us so that your quotation comes back complete on the first round, with no guesswork on pumps, power or freight.
Why WS-S08B Needs a Configured Quote Instead of a List Price
WS-S08B is a long acrylic-shell swim and hydrotherapy spa. The catalogue records the shell at 7800 × 2200 × 1500 mm, with two control systems, four water pumps, two filter pumps, 98 jets in total, LED lighting (7 lights plus 46 small LEDs), a waterfall feature, ozone sanitation and a total power figure of 14.6 kW. Those are the standard catalogue entries for this model, not a fixed delivery specification.
The equipment behind that shell is selectable. The catalogue lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options, and availability differs by model. Two buyers can therefore order the same model number and receive different machines: one for a covered terrace in a mild climate with modest insulation, another for an exposed rooftop with a heat pump, extra insulation and upgraded filtration. That is why we quote per configuration rather than publishing a single price.
Information to Prepare Before You Send an Enquiry
Send these six items in your first message and we can usually return a workable quotation without a long back-and-forth.
1. Site and access details
- Indoor or outdoor placement, and whether the spa will sit above ground, be partially recessed, or be sunk into a deck.
- The finished external dimensions available on site, plus clearance for steps, maintenance access and the plant area.
- How the shell reaches the site: ground-floor door, crane, rooftop hoist, stairwell or narrow lane. Access drives packing and handling cost more than most buyers expect.
- Slab or supporting structure details, since a filled shell of this length is a heavy live and dead load.
2. Power supply
- Supply voltage, phase and frequency at the intended location, and the available breaker capacity.
- Whether an electrician will run the final circuit and dedicated protection, and who is responsible for local electrical compliance.
- Distance from the supply panel to the spa, which affects cable length and cost.
3. Water, drainage and treatment
- Fill source and whether you want a drain or overflow provision.
- Your preference on sanitation: ozone as standard, plus UV sterilisation if you want it added.
- Filtration choice between the catalogue options, including sand filtration where specified.
4. Climate and heating
- Average winter temperature at the site, which decides whether a heat pump and additional insulation are worth specifying.
- Whether you want year-round use or seasonal use, since this changes both the equipment list and running expectations.
- Cover or enclosure plans, if any.
5. Use case and quantity
- Private villa, resort, club, wellness facility or residential development.
- Quantity per site and whether the same specification repeats across units.
- Any preference on steps, lighting colour scheme or waterfall arrangement.
6. Delivery terms
- Destination city, port or site address, and the delivery deadline tied to your programme.
- Whether you want door-to-door delivery or collection at a port.
- Import arrangements if you have a preferred forwarder.
How Our Quotation Process Runs
The enquiry follows the same sequence we apply to other project products: you send a brief, we confirm the specification and quote the details, then production and shipment follow once the order is signed. The spa is built as part of our custom and OEM service, so finishes, equipment mix and packing can be adjusted to your project rather than fixed to a showroom model.
For buyers coordinating several product lines at once, the spa is usually quoted together with surrounding poolside items — loungers, dining sets, pergolas and cabana daybeds — under one turnkey project package. Combining shipments this way keeps one coordination point for production scheduling, packing lists and delivery dates, which matters when the spa shell and the terrace furniture must arrive at the same site window.
Freight is quoted after we know the destination and access conditions. We arrange forwarding by sea, air or rail with the paperwork handled on our side, and door-to-door delivery where the site allows it. For a shell of this length, packing and route planning are part of the quotation, not an afterthought.
Comparing Alternatives Before You Commit
If the 7800 mm envelope does not suit your site, ask for two or three comparable configurations in the same enquiry. Buyers who need a customised footprint often look at customizable shape outdoor spa options, where square, round, oval and curved layouts are produced to fit the available space. Buyers focused on jets, lighting and water features as the priority typically compare against a luxury outdoor swim spa with massage jets specification. Requesting both alongside WS-S08B lets you compare equipment counts and cabinet layout on paper before choosing.
What to Check When the Quotation Arrives
- Every selected option appears by name, including heat pump, insulation level, filtration type and UV sterilisation where ordered.
- Pump counts, jet counts and lighting quantities match the configuration you asked for, not only the catalogue default.
- The electrical requirement is stated in writing so your electrician can size the circuit before the shell arrives.
- Delivery terms, packing method and destination are named, along with what is excluded.
- Steps, control system placement and access clearances are shown on drawings you can pass to your site team.
Send your WS-S08B enquiry
Include the site dimensions, power supply, sanitation and heating preferences, use case and destination address. We confirm the equipment list and return a configured quotation for Outdoor Swim Spa WS-S08B, with freight arranged to your site. Visit our contact page to start the enquiry.