A swim spa of this size is not a product you can approve from a brochure photo. Before the purchase order for Outdoor Swim Spa WS-130CⅢ-U is signed, the architect, the M&E consultant, the main contractor and the client all need to be working from the same confirmed specification. The list below follows the order in which those decisions actually have to be made on site.
Start with what the catalogue already fixes
The published catalogue entry for WS-130CⅢ-U gives an overall envelope of 11830 × 3000 × 1430 mm. That single line drives most of the downstream coordination: it determines whether the unit fits the plot, how much working clearance the crane or forklift needs, and whether the shell has to be delivered in one piece or split for access. Treat these as starting figures to be re-confirmed on the approved shop drawing, not as final site dimensions — the shell, the coping detail and any steps added at the edge all change what the builder actually has to build around.
The same entry lists one control system, four water pumps, one filter pump, twenty-three jets in total, five LED fixtures and a total connected load of 11.85 kW. Those numbers are enough for an early electrical budget, but they are not a distribution-board schedule. Ask for the confirmed configuration sheet before the M&E design is frozen.
Confirm the pump and jet layout against how the space will be used
WS-130CⅢ-U is shown with water jets, LED lighting and ozone as its core features. The four water pumps support the jet circuit rather than swim training, so this configuration suits a hydrotherapy and relaxation programme — hotel guests, villa residents, resort spa use — where seating position and jet intensity matter more than lap length.
The closely related Outdoor Swim Spa WS-130CⅢ shares the same 11830 × 3000 × 1430 mm shell but is listed with a swim training system, one water pump, twenty jets, seven LED fixtures and 10.85 kW. If the brief calls for daily swimming against a current, that variant — not the -U configuration — is the one to price. This is exactly the kind of difference that gets lost when a model code travels through a bill of quantities without its feature list attached.
| Item shown in catalogue | What to confirm before approval |
|---|---|
| Jet total: 23 pcs | Which jets are on which seat positions, and whether the jet package matches the intended hydrotherapy programme |
| Water pump: 4 pcs / Filter pump: 1 pc | Pump duty point, noise level at the plant location, and access for servicing |
| Total power: 11.85 kW | Supply phase and protection, cable route, isolator position, and whether a heat pump is added to the load |
| LED lights: 5 | Fitting locations relative to the coping line and control grouping for night operation |
| Ozone | How ozone dosing interacts with the disinfection regime the operator intends to run |
Decide the options list before production, not after delivery
The catalogue offers control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps as options for this range. Availability and compatibility vary by model, so each line needs a written confirmation against the specific unit being ordered.
- Heat pump and insulation — these two decide running cost more than any other choice on the list, and both have to be built into the shell and the plant layout from the start. Retrofitting either one after the unit leaves the factory is a different project.
- Sand filtration versus the standard filter pump — agree which filtration scheme the operator will maintain, since it changes the plant-room footprint and the maintenance routine handed over at completion.
- UV sterilisation alongside ozone — confirm the dosing logic so the operator is not left managing two systems that were never designed to work together.
- Steps and access — step position affects water depth at the entry, the coping detail and the surrounding deck level. Fix it on the drawing before the paving is set out.
Agree the site conditions the unit depends on
Three items routinely delay swim spa handovers, and none of them are the spa itself:
- Structural support. A fully wet shell of this footprint is a heavy load. The slab, pile cap or ground-bearing detail has to be designed for the saturated weight plus live load, signed off by the structural engineer.
- Plant access. Pumps, filter and control system need a route in and out that does not require lifting the spa off its base. Build the access hatch or removable panel into the deck design.
- Drainage and overflow. Backwash, drainage and any overflow need an agreed route before the surrounding hardscape is laid.
Local building, electrical and pool safety requirements are set by the authority having jurisdiction on each project. Confirm permitting and inspection responsibilities with your local consultant — a supplier's specification sheet does not substitute for that review.
Put the delivery sequence in writing
Because this is a made-to-order item, the approval date is what starts production, and every site trade downstream waits on it. Before sign-off, get written confirmation of: the approved configuration sheet with all option lines resolved; the shipping arrangement and who handles customs clearance; the delivery window agreed against the site programme; and the installation and inspection steps that follow arrival, including who attends at handover.
SANTERSON is a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, with custom/OEM production, door-to-door logistics and installation support handled through one contract. For a swim spa line item that means the specification, the freight plan and the site coordination can sit with a single counterparty instead of three — provided all three are agreed in writing before production starts.
Send us the configuration you are being asked to approve
Share the model code, the option lines and the site constraints, and we will return a confirmed specification sheet for the WS-130CⅢ-U — pump and jet layout, electrical load, filtration and heating options, and the delivery and installation sequence — so your team is approving one agreed document rather than four partial ones. Enquiries go through our contact page.