Stone and marble panels look simple on a mood board and complicated on a purchase order. Slab sizes, cut patterns, edge details, substrate conditions and shipping all change the price. This guide lists what to have ready before you contact a supplier, so your first enquiry comes back as a usable quotation instead of another round of questions.

Start With the Room, Not the Material

Before asking for prices, decide where the panels are going and what that surface has to do. A feature wall behind a reception desk has different needs from a bathroom wall next to a shower, and both differ from an exterior facade. Note the following:

  • The room type and the exposure: interior dry area, wet area, or external wall.
  • The total covered area in square metres, plus any partial panels, returns and corners.
  • Panel height per floor, because tall walls change handling, fixing methods and panel joints.
  • Whether the surface is flat, curved, arched or interrupted by doors, windows and services.

If you are specifying a full wall system rather than a single accent, send the drawings with dimensions marked. Our Stone & Marble Panels in the Paneling Systems collection are made to measure, so finish, layout and panel size are set per project and confirmed against your drawings before production.

Send Drawings With Dimensions, Not Just Photos

A photograph tells a supplier what you like. A drawing tells a supplier what to make. For a first enquiry, include:

  • Floor plans and elevations of the walls involved, with overall lengths and heights.
  • A setting-out sketch or layout showing where joints, trims and reveals should fall.
  • Details for edges, corners and any junction with flooring, ceiling or joinery.
  • Positions of sockets, switches, taps, shower heads, mirrors and concealed services.
  • Photos of the existing substrate, including level tolerance and any waterproofing already applied.

For built-in bathroom projects in our Stone & Marble Panels range, the layout is tailored to each space, which means the position of vanities, basins and partitions needs to be settled before sizing is fixed. Send those layouts with your enquiry rather than waiting for the supplier to ask.

Decide on Material Type and Finish

"Stone panel" covers several different products, each with its own cost drivers and installation method. Being specific in your first message avoids quotes that are not comparable:

OptionWhat to specifyBest suited to
Natural stone and marble panelsSpecies or name, surface finish (honed, polished), thickness, panel size, vein directionLobby feature walls, villa interiors, vanity surrounds
Flexible stone veneerStone look to replicate, sheet format, colour, curved radiusCurved walls, arches, columns, renovation where weight matters
Composite panels with stone finishCore type, face finish, panel size, fixing systemFacades, curtain walls, commercial interior cladding

Where the design calls for curves, rigid slabs are often the wrong tool. Our MCM Flexible Travertine Stone Veneer is thin and bendable, so it wraps curved walls, cylinders and shaped surfaces while reproducing the natural hole texture of travertine. It can be cut on site with simple tools, which keeps both transport and installation simpler than heavy rigid stone.

Confirm Substrate, Fixing and Site Conditions

Panel failures are usually fixing problems, not stone problems. Tell the supplier what the panels will be attached to:

  • Substrate type: concrete block, cement board, plasterboard, steel frame or an existing tiled wall.
  • Whether the surface is level, and how much packing or grinding may be needed.
  • Waterproofing status in wet areas, including who is responsible for applying it.
  • Fixing method you intend to use: adhesive, mechanical fixings, or a subframe system.
  • Site access for delivery, storage space, and the stage of works when panels go in.

For exterior work, mention the building type and climate exposure. Our Aluminum Honeycomb Panel for Building Exterior & Interior Wall Cladding can be produced with a natural stone veneer face, which keeps large panels flat and rigid while reducing weight compared with solid stone. That difference matters on facades and upper floors.

Be Clear About Quantities and Timing

Manufacturing schedules are built around quantities and dates, so give the supplier a realistic frame:

  • Total area in square metres, plus spare panels for cuts, breakage and future repairs.
  • Number of projects or units involved, if you are buying for a multi-unit development.
  • Required delivery date on site and the latest date materials can arrive without holding up trades.
  • Delivery address and access limits: floor level, lift size, road restrictions, delivery hours.
  • Incoterms or delivery basis you want quoted, so prices from different suppliers compare fairly.

If your project also needs matching surfaces elsewhere, such as vanity tops and basin surrounds, ask for them in the same enquiry. Our Stone & Marble Surfaces are configured per bathroom project, so panels and worktops can be specified together with one set of dimensions and finishes.

Ask the Right Questions Back

A quotation is only useful when you know what it includes. Before comparing suppliers, check:

  • Is the price for panels only, or does it include trims, edges, cut-outs and fixing materials?
  • Are drawings or a shop drawing review part of the process, and who signs them off?
  • What is confirmed before production starts, and what changes after that point carry a cost?
  • How are samples supplied, and does the sample match the production batch in finish and colour?
  • How will batches be matched for vein direction and shade across a large wall?
  • What is the packing specification, and how are fragile panels protected in transit?
Bring your drawings to the first conversation. Panels that are cut to size cannot be re-cut to fit a revised opening, so settling dimensions before production protects both budget and programme.

A Simple Enquiry Checklist

Send these with your first message

  • Project location, project type and the room or wall being clad.
  • Drawings: plans, elevations and a setting-out layout with dimensions.
  • Material decision: natural stone, flexible veneer or composite panel with stone finish.
  • Finish, thickness and panel size preference, or a reference image with the look you want.
  • Total area, spare allowance and number of units if it is a repeat specification.
  • Substrate condition, waterproofing status and intended fixing method.
  • Required site delivery date, delivery address and access constraints.
  • Your name, company, phone or WhatsApp and email for the formal quotation.

With those details in hand, a supplier can confirm feasibility, suggest an alternative format where a rigid slab would be impractical, and return a quotation you can compare line by line against others. If your enquiry covers more than wall panels — joinery, flooring, lighting or bathroom fixtures together — say so at the start, because grouping categories into one project package usually simplifies coordination on site.

Send us your drawings for a panel quotation

Share your wall elevations, target finish and required delivery date, and we will confirm sizing, material options and made-to-measure pricing for your project. Contact PHILLIP on WhatsApp +86-13928214007 or email santerson@qq.com. Enquiries are answered within 24 hours, Monday to Saturday, 8:00 AM–6:00 PM (GMT+8).