An outdoor swim spa usually arrives on site long before the deck, the power feed and the plant cabinet are finished. When that sequence is reversed, the shell sits on a slab that was poured without its footprint, the cable was sized for a different load, and the waterfall ends up facing the wrong way. The Outdoor Swim Spa WS-S04 is one of the more configurable units in our swim and hydrotherapy range, which makes early coordination with drawings and site conditions worth the effort. Below is how we work that coordination through on villa, resort and hospitality projects.
What the WS-S04 record actually shows
Before any drawing can be checked, it helps to separate fixed dimensions from items that are selected per project. The catalogue entry for this model gives a shell size of 4090 × 2200 × 1110 mm, one control system, three water pumps, one filter pump, 26 jets with four water columns, three LED lights plus eighteen small LEDs, and a total power figure of 8.25 kW. Features listed for the unit are water jets, LED lighting, ozone and a waterfall.
Two of those lines need care on a live project. The swim training system is shown as "Not listed" in the catalogue record, so it should be treated as an option to confirm rather than something already included. And because the range is configurable — control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps are catalogued as options — the power figure above belongs to a particular configuration. Use the specification we confirm for your selected build when sizing electrical work, not the catalogue number alone.
| Item | Catalogue entry for WS-S04 | How to treat it on drawings |
|---|---|---|
| Shell dimensions | 4090 × 2200 × 1110 mm | Fixed reference; still confirm against the confirmed build sheet before setting out |
| Total power | 8.25 kW as listed | Configuration-dependent; re-confirm with the selected options and local supply |
| Jets | 26 jets, 4 water columns | Affects jet layout, seating position and access for maintenance |
| Lighting | 3 LED lights, 18 small LED lights | Low-voltage circuits need to reach the spa and any feature wall behind it |
| Swim training system | Not listed in the record | Confirm whether it is specified; it changes pump count and power |
Reading the spa into the landscape drawings
Send us the landscape plan, the reflected ceiling or paving plan for the terrace, and the section through the pool edge as early as the concept stage. We mark the shell outline, the access clearances needed for pumps and filters, and the position of the waterfall relative to adjacent paving and planting. That single marked-up drawing usually answers the questions a builder would otherwise raise during construction.
Three details are worth resolving on paper rather than on site:
- Set-down and structure. Whether the unit is above ground, semi-recessed or fully recessed changes the excavation, the perimeter drainage and how the shell is supported. Recessed installations need a drain path and access hatches that a plan can show before concrete goes down.
- Water feature orientation. The waterfall reads best against a solid backdrop and away from seating and glazing. Once the paving pattern and any stone and marble panels behind it are set, moving the feature is expensive.
- Relationship to the rest of the outdoor area. A spa rarely stands alone. On poolside terraces we coordinate it with aluminium sling sun loungers, daybeds and pergolas so circulation routes, shade and wet zones line up with the same drawing set.
Site requirements to lock down before production starts
Once the layout is agreed, the following items should appear on the services drawings. Missing any of them delays handover more than the spa itself does.
- Power. Supply capacity, circuit protection and the routing to the control position need to match the confirmed specification for your configuration, including any heat pump or added pump that changes the load.
- Water and drainage. Fill, top-up and an overflow or drain route for emptying. Recessed shells depend on gravity drainage being designed in from the start.
- Access for maintenance. Pumps, filter pump and the control system need reachable positions; a hatch behind a finished wall is a common regret.
- Steps and entry. Catalogued options such as steps should be drawn into the paving level rather than added afterwards.
- Finishes around the shell. Coping, decking edges and any cladding must know the final shell line to avoid cutting on site.
If you are preparing a tender or a builder's package, send us the drawings and we will return a marked-up set showing the spa footprint, clearances and service points for the configuration you are specifying. That is the fastest way to get the mechanical, electrical and landscape trades working from one coordinated document.
Where our project service fits into this process
SANTERSON is a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, and the swim spa usually sits inside a wider package rather than being bought separately. The coordination above fits the workflow we describe on our interior design services: project brief and design proposal, quotation and detail confirmation, then production, shipment and follow-up.
For projects that need bespoke dimensions or finishes elsewhere in the outdoor area, our custom and OEM service covers custom furniture design and prototyping, bespoke material finishes and OEM manufacturing. Freight is handled under our logistics and door-to-door delivery service — sea, air and rail forwarding with customs paperwork, packaging and container loading, shipment tracking and door-to-door handover. Installation, inspection and after-sales support sit under a separate service page, and we confirm the practical scope for your site rather than assuming it.
Import terms, duties, transit times, local electrical requirements and installer arrangements vary by country and should be confirmed case by case with our project team. Australian projects in Willoughby, Perth, North Turramurra, Melbourne and Sydney are referenced on our project pages; those references describe project locations, not a guarantee of local stock or certification.
A short checklist for the design meeting
Bring these to the discussion and the specification closes quickly:
- Landscape and paving plans with levels, plus the section through the pool or terrace edge.
- A single-line electrical note showing available supply at the spa position.
- Your decision on recessed, semi-recessed or above-ground set-down.
- Which optional items you want — heat pump, UV sterilisation, sand filtration, insulation, steps, swim training system.
- The finishes you intend to use around the shell, so coping and cladding are drawn to the right line.
Send drawings and requirements through our contact page and we will come back with a configuration proposal and a coordinated set of notes your builder can work from. Reviewing the spa against the drawings before production is what keeps the shell, the services and the surrounding landscape on the same schedule.