A swim spa is one of the few villa or resort amenities that sits across three procurement workstreams at once: structural and civil works, mechanical and electrical services, and outdoor landscape coordination. That is exactly why a model code alone is not enough for an RFQ. This guide sets out what a procurement team should put in writing before quoting Outdoor Swim Spa WS-PC07ST-S, so the quotation you receive is comparable, and the specification you install matches the one you priced.
1. The product record: model code, category and reference page
Start with an unambiguous identification block in your bill of quantities. For this unit that means the model code WS-PC07ST-S, the range it belongs to (SANTERSON's configurable outdoor swim and hydrotherapy range), and the catalogue page you are quoting from, Swimming Pools and Swim Spas. Two units in this range share most of their code — WS-PC07ST and WS-PC07ST-S, for example — and a supplier reading "PC07" in an email may quote the wrong shell. Attach the URL and the product image reference to every enquiry, drawing and purchase order so all parties are looking at the same record.
2. Dimensional data and what it drives on site
The catalogue lists this model at 7000 × 2400 × 1470 mm. Document the three figures separately rather than as a single string, because each one feeds a different drawing:
- Length and width set the footprint for the slab, deck surround, plant-room access and any lifting route for a crane or forklift.
- Height determines whether the installation is above ground, semi-recessed or fully recessed, and how much excavation and retaining work the civil contractor carries.
- Access clearances — record door widths, gate openings and the final approach path to the position. A 7 m shell that cannot pass a site gate becomes a crane lift, and crane access is a cost nobody budgets for late.
State on the drawing which figures are catalogue values and which are the confirmed shop-drawing dimensions you will build to. Treat the catalogue numbers as the basis of design, not as the setting-out dimension.
3. Equipment schedule: what is included versus optional
The specification block published for this model lists a control system (1 set), swim training system (1 set), filter pump (1 pc), six jets, four LED lights and a total power figure of 6.55 kW, with water jets, LED lighting, ozone, swim training system and an automatic cover option shown as features. Two points matter here when you write the enquiry.
First, the captured specification does not list a water pump for this model. Do not infer one is included and do not leave the line out of your schedule — ask the supplier to state explicitly, in writing, which pumps and items are inside the quoted price and which sit outside it. A quotation that says "as per catalogue" is not comparable with one that itemises its contents.
Second, catalogued options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so list every option you want as a priced line item against WS-PC07ST-S specifically. A heat pump quoted for one shell in the range is not automatically approved for another.
| Line to document | Why it belongs in the quotation |
|---|---|
| Catalogue dimension (7000 × 2400 × 1470 mm) | Basis of design for slab, deck and excavation; must be re-confirmed on shop drawings |
| Control system / swim training system / filter pump / jets / LED lights | Defines what arrives in the crate and what your M&E subcontractor must connect |
| Total power figure (6.55 kW as catalogued) | Drives supply capacity, cable sizing, protection device and isolator location |
| Ozone and optional UV sterilisation | Water-treatment scope; affects chemical storage and maintenance access |
| Automatic cover option | Adds a moving element and its own power and clearance requirements |
| Insulation, steps, sand filtration, heat pump | Optional items; price them per configuration rather than assuming inclusion |
4. Electrical and services documentation
Confirm the electrical requirement for the selected configuration in writing, not from a brochure figure. The catalogued total power of 6.55 kW is a starting point that shifts once options such as a heat pump are added. Your document set should record the supply voltage and phase, the circuit rating and protective device, the location of the local isolator, and who is responsible for the run from the distribution board to the unit. Also note who commissions the control system and who hands over the operating instructions at practical completion — a swim spa handed over without commissioning records is a warranty dispute waiting to happen.
5. Site preparation, delivery and installation responsibility
Split the scope in writing between your team and the supplier before order placement. Record who prepares and cures the base, who provides crane or forklift unloading, who connects and commissions services, and who carries out on-site installation and snag inspection. SANTERSON's Installation & After-sales Support covers on-site installation, inspection and snagging alongside warranty and spare-parts support, while Logistics & Door-to-Door Delivery covers freight forwarding, customs paperwork, packaging and container loading through to door-to-door delivery. Agree the Incoterms, the named delivery point, the unloading method and the inspection window in the same document, so a damaged shell is reported while it can still be claimed.
6. Configuration sign-off and change control
Because this range is configurable, most disputes trace back to an undocumented configuration change rather than a defective part. Keep one signed specification sheet per unit that carries the model code, the confirmed dimensions, the included-equipment list, the selected options and the electrical data — and re-issue it whenever any of those change. If your project needs a non-standard finish, dimension or branding, raise it through Custom & OEM Service at design stage rather than during production, and record the agreed prototype or sample approval against the purchase order.
A short documentation checklist
- Model code plus catalogue URL on every enquiry, drawing and order line
- Catalogue dimensions separated into length, width and height, with a note that shop drawings govern setting out
- Included-equipment list confirmed in writing, including any pump not shown in the captured specification
- Every option priced as its own line item for this exact model
- Electrical data confirmed for the selected configuration, with commissioning responsibility named
- Delivery point, unloading method, installation scope and snag window agreed before order placement
- One signed specification sheet per unit, re-issued on every change
As part of SANTERSON's furniture and building materials range, outdoor swim spas are supplied alongside the villa and hospitality fit-out products they sit within — which means the spa, the surrounding deck furniture and the outdoor structure can be documented, produced and shipped as one coordinated package rather than three separate purchases.