A product submittal is the document set a buyer, architect or contractor reviews before a swim spa is approved for purchase and installation. For the Outdoor Swim Spa WS-SP500, a complete submittal removes the guesswork around size, power, equipment and site preparation, so approval does not stall on site questions that should have been answered in writing.

1. Identification and scope of supply

Start with documents that state exactly which unit is being supplied. The model name, product drawing and the category page it belongs to should all agree, because a submittal referencing one model while the purchase order names another is the most common cause of rework at approval stage.

  • Model designation and product data sheet for the WS-SP500 as listed on the Swimming Pools and Swim Spas category.
  • A scope-of-supply schedule that separates standard equipment from optional items, so nothing is assumed by either side.
  • Dimensioned drawings or photographs with the catalog shell size marked on them, for checking against the planned deck, terrace or podium location.

2. Dimensional and siting data

The submittal should carry the shell dimensions in a form the site team can set out on the ground, together with access notes. A swim spa is delivered as a fabricated unit, so the route from the delivery vehicle to the final position matters as much as the footprint.

  • Overall shell size for this model: 5000 × 2500 × 1600 mm, taken from the catalog listing.
  • Clearance and access notes: delivery route, lifting or crane access if the unit is raised to a terrace, and space left for future pump and control servicing.
  • Support and drainage expectations for the base the unit will sit on, confirmed with the site contractor rather than assumed.

3. Equipment schedule as configured

Catalog listings show a feature set; the submittal must show what is actually included in the order. List each item with its quantity, and state plainly where the catalog does not specify something, so the buyer can request it as an option or confirm it will be supplied locally.

ItemCatalog entry for WS-SP500What to confirm in the submittal
Control system1 setLocation of the control panel and who provides the electrical connection to it
Swim training system1 setFlow arrangement and operating mode for lap swimming and training use
Water pumpNot listed in the catalog entryWhether a pump is included in this configuration, or supplied by others on site
Filter pump1 pcFiltration cycle and access for cartridge or media servicing
Jets6 pcs totalJet layout and seat or lounger positions they serve
LED lights4 pcsVoltage, fixing detail and control of the lighting circuit
Total power9.35 kWSupply capacity, circuit protection and who supplies the dedicated circuit
Features shownWater jets, LED lighting, Ozone, swim training systemWhich of these are included as standard in the ordered configuration

Optional accessories listed in the catalog include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Each one needs a line in the submittal with a clear yes or no, because availability and compatibility vary between models.

Power is the item most often left open. The catalog figure of 9.35 kW total power tells the electrical contractor how much capacity to plan for, but it does not replace a written confirmation of supply voltage, circuit sizing, protective devices and the distance from the isolator to the unit. Get that in the submittal before the slab and conduit are poured.

4. Comparison with the closely related model

Buyers frequently weigh two variants of the same shell size against each other. Include a short comparison so the reviewer can see why one was chosen, and so an equivalent substitution later is treated as a formal change rather than a silent swap.

SpecificationOutdoor Swim Spa WS-SP500Outdoor Swim Spa WS-SP500-MS
Catalog dimensions5000 × 2500 × 1600 mm5000 × 2500 × 1600 mm
Water pumpNot listed in the catalog entry1 pc
Jet total6 pcs29 pcs
Total power9.35 kW11.55 kW
Other items shownControl system 1 set, swim training system 1 set, filter pump 1 pc, LED lights 4 pcsControl system 1 set, swim training system 1 set, filter pump 1 pc, LED lights 4 pcs

The Outdoor Swim Spa WS-SP500-MS shares the same catalog footprint but shows a larger jet count and higher total power. If a project needs the massage-jet arrangement, that difference changes both the electrical design and the approval paperwork, so it belongs in the submittal rather than in an email thread.

5. Materials, finishes and make-up

State what the shell and cabinet are made of, which finish is being supplied, and how the exterior will meet the surrounding deck or cladding. Where a project also specifies wall panels, flooring or outdoor furniture around the spa, note who supplies those adjacent items so junctions are not left to chance on site.

6. Commercial and delivery documents

A swim spa crosses borders in most of our projects, so the paperwork that travels with it belongs in the same pack as the technical data.

  • Proforma invoice and packing list matching the equipment schedule above.
  • Packaging and container-loading detail, plus the freight mode chosen for the project — sea, air or rail — as covered under Furniture Logistics and Door-to-door Delivery.
  • Customs documents for the destination country, and confirmation of who handles clearance at each end.
  • Installation and after-sales arrangements, including what is covered under Installation & After-sales Support and what the site contractor is responsible for.

7. Approval checklist before you order

  • Model name on the submittal matches the purchase order and the product page.
  • Shell size 5000 × 2500 × 1600 mm checked against the site setting-out drawing.
  • Every catalog-listed accessory either confirmed as included or marked as excluded in writing.
  • The missing water pump entry resolved: included, optional, or by others.
  • Electrical design signed off against the 9.35 kW figure for this configuration.
  • Ozone, UV and filtration responsibilities assigned between supplier and site contractor.
  • Delivery route, lifting method and crane or manual handling confirmed for the final position.

Send us your project drawings

SANTERSON is a China-based furniture and building materials supplier working on villa, hospitality and office projects, with swim spas supplied as part of wider outdoor and interior packages. Send the location plan and the equipment list you are working to, and we will return a submittal pack for the WS-SP500 with the configuration stated line by line — including options such as heat pumps, sand filtration, insulation and steps where your site needs them.