A swim spa rarely fails because of the shell. It fails on schedule, because the power, the slab and the drainage were never asked about until the spa was already on the boat. This note walks through how we place Outdoor Swim Spa WS-PC07ST-S inside a whole-project materials schedule, so the wet zone closes out in one pass instead of three.

Why the spa belongs on the same sheet as everything else

On villa and resort packages we buy furniture, joinery, flooring, wall panelling, lighting and outdoor structures from one production line, because a single purchase order keeps the container plan, the inspection routine and the snag list under one owner. A swim spa has to sit on that same sheet. It carries electrical load, a water supply, a discharge route, a level base and an access path for delivery, which means it touches four or five trades rather than one.

When the spa appears only in a landscape drawing, three things usually go wrong: the distribution board has no spare way for the spa circuit; the paving contractor pours the surround before knowing the footprint; and the electrical inspection is booked for a date that the spa delivery cannot meet. Listing the spa as a line item with dimensions, power and lead-time columns fixes all three at once.

What the catalogue record gives you

WS-PC07ST-S is part of our configurable outdoor swim and hydrotherapy range. The published catalogue entry records a footprint of 7000 × 2400 × 1470 mm, one control system, one swim training system, one filter pump, six jets, four LED lights and a total power figure of 6.55 kW, with water jets, LED lighting, ozone, the swim training system and an automatic cover option shown as features.

Treat those numbers as the starting point for coordination, not as the finished specification. Included equipment and electrical requirements change with the configuration you select, so the schedule line should quote the catalogue figures and then carry a status column that closes only when the confirmed configuration sheet is on file.

Schedule fieldWhat to enter for WS-PC07ST-S
Line descriptionOutdoor swim spa, model WS-PC07ST-S, catalogue footprint 7000 × 2400 × 1470 mm
Confirmed dimensionsPending — fill from the configuration sheet once options are selected
Electrical loadCatalogue total power 6.55 kW; supply arrangement to be confirmed with the confirmed configuration
Options under reviewAutomatic cover, heat pump, UV sterilisation, insulation, steps, water pump and filtration choice
Base and surroundLevel load-bearing base; paving or deck edge set out from the confirmed footprint plus working clearance
ServicesWater inlet, drain or overflow route, equipment access for the filter pump and control system
Delivery routeGate width, turning space and crane or forklift access checked against the delivered module size
Inspection windowDated after the spa delivery date is fixed, not before

Options that change the schedule, not just the price

Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each one earns its own line before it is confirmed.

  • Heat pump and insulation — add to the electrical load and change where plant can sit relative to the shell and to neighbouring structures.
  • Automatic cover — needs clear space above and around the water line, which affects pergola posts, handrails and planting beds.
  • Sand filtration — needs a plant location with access for servicing and a route back to the spa.
  • Steps — change the finished edge detail of the surround, so the paving setting-out must know about them before the first course is laid.

The same logic applies across the outdoor package. A Double Roof Hardtop Aluminum Gazebo with Privacy Curtains beside the spa needs its own footing and clearance notes, and outdoor furniture for villas and resorts has to be scheduled so that loose items arrive after the wet works are finished.

Reading the model code alongside its neighbours

The range is organised by size and fitment, which helps when a site cannot take a 7 m module. The catalogue lists shorter variants with swim training systems, longer variants at greater lengths, and shallow plunge models without a training system. Where the spa is a fitness and hydrotherapy item rather than a lap facility, a shorter ST variant usually fits the terrace better; where the client wants an unbroken swim length, the longer entries in the swimming pools and swim spas category are the ones to schedule. For spaces that cannot take a rectangular shell at all, a customizable shape outdoor spa can be made in square, round, oval or curved layouts.

Whatever the size, keep one rule: only one model number stays live on the schedule at each decision point. Comparing three models side by side is fine during design development; carrying three into procurement is how wrong modules get shipped.

Where the spa sits in our own workflow

Spa lines run through the same six stages as the rest of a package: consultation, design and planning, production, logistics, installation and after-sales. Under custom and OEM service, spa-adjacent items such as steps, cladding colour and surround joinery can be built to the project drawings instead of the catalogue default. One-stop furniture and building materials supply means the flooring, wall finishes, ceiling linings and lighting for the spa pavilion are produced on the same order, so one inspection covers them.

For freight, we handle sea, air and rail forwarding, packaging and container loading, customs paperwork and door-to-door delivery. Import terms, duties, insurance and transit time are settled per project, and we will state them in writing on the order rather than assume them. Installation, inspection with the site team, warranty coverage, spare parts and maintenance follow the same handover as the rest of the fit-out.

A short coordination checklist

  • Fix the model number before the base is poured; keep the configuration sheet version-numbered.
  • Have the electrical engineer sign off the spa circuit and any heat pump circuit before the board is ordered.
  • Confirm the delivery path against the delivered module size, not the catalogue footprint alone.
  • Schedule the surround, gazebo or pergola and loose outdoor furniture around the spa installation date.
  • Book one combined inspection for the spa, its plant and its surround.

Send us the drawing set with the spa zone marked, and we will return a schedule line for WS-PC07ST-S or the variant that suits the terrace, with dimensions, options and lead time stated. See turnkey interior project solutions for how the spa integrates with the rest of the package, or go to the contact page to send drawings.

Talk to PHILLIP about a swim spa line in your project schedule — WhatsApp +86 139 282 14007, email santerson@qq.com. The contact page lists business hours of Monday to Saturday, 8:00 am to 6:00 pm GMT+8, and says enquiries receive a response within 24 hours.