A swim spa on a villa terrace or a resort deck looks simple on a rendering: a shell, some water, a bench to sit on. In procurement it is one of the few items on an outdoor schedule that couples civil work, mechanical plant and electrical supply into one decision. Before your team signs off on Outdoor Swim Spa WS-PC05ST-S, the confirmations below are the ones that most often surface later as variations, delays or an installation crew standing on site with the wrong information.
1. Footprint, access route and structural support
The catalog lists WS-PC05ST-S at 5000 × 2400 × 1470 mm. Treat that as the envelope to design against, not as a site clearance figure. Two separate questions need answering before approval.
- Clearance around the shell. Add working space for the filter pump and control system, plus room for anyone who will later service them. A spa set flush into a deck with no side access becomes a maintenance problem on day one.
- The delivery route. The unit arrives as a fabricated shell, not as loose components. Confirm gate widths, turning radii, overhead cables and whether a crane or a route around the building is needed. On an established villa site this is frequently the item nobody has priced.
- What carries the load. A filled shell of this size is heavy, and a filled shell loaded with people is heavier. The supporting slab, deck framing or ground bearing must be specified by your structural engineer against the final configuration, including whether the unit sits above, on or below the finished deck level.
2. Which systems are actually in the order
The catalog page for this model shows a control system (1 set), a swim training system (1 set), a filter pump (1 pc), six water jets, four LED lights and ozone. The water pump line is not listed on that page. That gap matters commercially: the swim training unit, the jet circuit and the filtration loop each draw power, and an unlisted item is exactly what turns into a change order after the contract is signed.
Ask for the configuration schedule to be restated in the quotation, line by line, with model names and quantities. The catalog also lists optional accessories — control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps — and notes that availability and compatibility vary by model. A heat pump and an insulation package change both the running load and how the spa behaves in a cool season, so they should be decided before order, not treated as site additions.
| Model | WS-PC05ST-S |
| Catalog dimensions | 5000 × 2400 × 1470 mm |
| Control system / swim training system | 1 set each |
| Filter pump / water pump | 1 pc / not listed on the catalog page — confirm in the quotation |
| Jets / LED lights | 6 pcs / 4 pcs |
| Total power shown | 6.55 kW — confirm against the selected configuration and local supply |
| Features shown | Water jets, LED lighting, ozone, swim training system |
3. Electrical supply and protection
The catalog shows 6.55 kW total power for this configuration. That figure is the starting point for an electrical discussion, not the end of it. Your electrical contractor needs written confirmation of the final equipment list before sizing the circuit, so that cable size, protection device and any isolator appear on their drawings rather than being improvised on site.
Two further points belong in the approval record: earthing and bonding arrangements around a wet zone, and where the control system will sit relative to the spa so that it is reachable for operation and service but not exposed to direct spray. Local wiring rules and any permit requirements are set by the project's jurisdiction and your consulting engineer — they are not carried by the product catalog, and we do not certify them on your behalf.
4. Water, drainage and commissioning sequence
Confirm the fill source, the drain or overflow route, and where discharge water goes. Also confirm who does what: whether the shell is set by the civil contractor and connected by a local mechanical plumber, or handled with our installation support. The handover should end with a commissioning check — jets, lighting, ozone, filtration cycle and swim training function running together — recorded on a snag sheet signed by both parties.
5. Where this model sits in the range
WS-PC05ST-S is the compact entry in our swim-and-hydrotherapy family, and the neighbouring models show what changes when a project needs more length or a wider shell. WS-PC05ST-L keeps the same 2400 mm width and depth but extends to 5490 mm. WS-PC07ST-S runs to 7000 × 2400 × 1470 mm and adds an automatic cover option. WS-PC07A-T is a different class of specification: 7000 × 3000 × 1470 mm, 56 jets and a listed water pump. Comparing the pages side by side is the quickest way for a project team to see which trade-offs a tighter terrace forces.
If the design intent is a bespoke basin rather than a catalog shell, our Swimming Pools and Swim Spas range includes outdoor spas made to customised shapes — square, round, oval and curved — with an acrylic shell and structural reinforcement. The whole category sits alongside the rest of the outdoor package, from Outdoor Furniture for Villas and Resorts such as pergolas, loungers and dining sets to paving, screening and lighting, which is why a single procurement partner usually keeps an outdoor zone coherent.
6. How we close out these confirmations
SANTERSON has manufactured furniture and building materials in China since 2008, and our service scope covers design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, then installation and handover. For a swim spa this means the configuration schedule, the electrical load list and the delivery access plan are agreed as documents before production starts, rather than assumed.
Freight is arranged by sea, air or rail with customs paperwork and door-to-door delivery; on-site installation, inspection and after-sales support follow. Response-time and warranty terms are quoted per project and should be read against your contract documents. Our Australian work to date includes villa projects in Sydney, Melbourne, Perth and Willoughby, listed under Project Cases.