A swim spa is one of the few outdoor purchases where the specification sheet and the finished installation can differ dramatically. Before you commit to Outdoor Swim Spa WS-130AⅢ, it is worth working through the same five questions a procurement manager would ask: does the shell fit the site, what equipment is actually included in this configuration, how will it be powered and insulated, how does it travel from factory to plot, and who answers the phone afterwards.

WS-130AⅢ sits inside our configurable outdoor swim and hydrotherapy range, alongside the longer Outdoor Swim Spa WS-130BⅢ and Outdoor Swim Spa WS-130CⅢ. That configurability is why buyers find the range attractive, and also why two spas with similar model numbers can arrive with different equipment lists. This guide shows how to read the catalogue data, where to ask for confirmation, and which details belong in your written order.

Start With the Footprint, Not the Features

The catalogue lists WS-130AⅢ at 8000 × 3000 × 1400 mm. Treat those figures as the shell envelope, then check them against three site conditions before you look at jets or lighting.

  • Access route. Measure the widest point of the path between the delivery vehicle and the final position — gate, side passage, garden door, turning radius. A spa that fits the plot but not the route becomes a crane problem.
  • Structural support. A deck, patio slab or ground-bearing base has to carry the filled shell plus occupants. Confirm the loading with your engineer or builder rather than assuming an existing surface is adequate.
  • Clearance for servicing. Pumps, filters and the control system need reachable access panels. Leave working space on the equipment side, not just enough room to stand beside the cabinet.

The 1400 mm depth in the catalogue suits standing exercise and seated hydrotherapy. How you site the unit — fully in-ground, semi-recessed or above ground on a deck — changes both the excavation scope and the entry steps you will need, so settle that before requesting a quotation.

Read the Specification as Configuration-Specific

The specification block published for WS-130AⅢ lists one control system, one swim training system, one water pump, one filter pump, 20 jets, seven LED lights and a total power figure of 10.85 kW. Those numbers describe that catalogue entry only. Our "-U" variant in the same 8000 × 3000 × 1400 mm shell carries a different equipment count — more water pumps and jets, fewer LED fittings, and a higher total power figure — and it is listed without a swim training system.

That difference matters for three reasons:

  • Electrical supply. Total connected load determines the circuit, protection device and cable run your electrician must install. Designing to the wrong figure means rework after the spa arrives.
  • Running cost. Pump count and power draw drive the operating bill far more than lighting does.
  • Intended use. A swim training system is what lets you swim against a current inside the shell. If daily training is the brief, confirm it is in the configuration you are ordering.

Practical rule: do not treat any power figure as final until the equipment schedule for your specific order has been confirmed in writing. Ask for a line-by-line list of what is included and what is optional, then have your electrician price to that document.

Compare Within the Range Before You Fix the Model

Buyers often settle on one model number too early. Across the Ⅲ series the shown feature set is consistent — water jets, LED lighting, ozone, and a swim training system on the catalogue entries for WS-130AⅢ, WS-130BⅢ and WS-130CⅢ — while the shell length changes what the space can be used for.

ModelCatalogue dimensionsWhat the extra length buys you
WS-130AⅢ8000 × 3000 × 1400 mmThe most compact option of the three; suits tight terraces and courtyards where deck area is limited.
WS-130BⅢ9950 × 3000 × 1430 mmA longer swimming channel with room to separate exercise from a seated hydrotherapy end.
WS-130CⅢ11830 × 3000 × 1430 mmThe longest layout of the three, for sites where longer uninterrupted swimming and more simultaneous users are the priority.

Dimensions above are the catalogue figures for each model. Confirm them against the drawing issued with your order before any groundworks begin.

If you want a swim channel plus a separate relaxation zone as a designed feature rather than an arrangement within one tank, look at the wider Swimming Pools and Swim Spas range, which includes extended layouts combining a long swimming channel with a dedicated hydrotherapy area.

Decide the Options That Change the Building Works

Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Group them by who has to act on them:

  • Decide before groundworks: insulation package, entry steps, recessed or above-ground siting, and the position of the control system.
  • Decide before electrical design: heat pump, additional water pumps, and any equipment that adds to connected load.
  • Decide for operating routine: ozone is a listed feature in this range, while UV sterilisation and sand filtration are options that change your maintenance tasks and consumables.

Availability and compatibility of options vary by model, so an option you read about on one product page may not be offered on the configuration you choose. Get the answer in writing with the quotation.

Price the Whole Delivery, Not Just the Shell

The landed cost of a swim spa is a sequence of steps, and each one has an owner. Our Furniture Logistics and Door-to-door Delivery service covers freight forwarding by sea, air and rail, packaging and container loading, customs paperwork such as commercial invoices, packing lists and certificates of origin, shipment tracking and delivery to site. Cargo insurance options and a dedicated logistics coordinator are part of that process.

What still sits with you: the site preparation, the electrical installation to your local regulations, any planning or permit requirements in your council or strata scheme, and the crane or rigging needed at the delivery end. Import duty and clearance costs also depend on destination and current rules, so confirm those line items case by case rather than assuming a landed figure from another project.

Ask for a written scope split. One page showing what the supplier delivers and what the buyer's local trades supply removes most of the arguments that appear on site two weeks before handover.

Check After-sales Before You Order, Not After

Pumps, filtration and a control system run week after week, so the support behind them matters as much as the shell. Our Furniture Installation and After-sales Support service covers on-site installation, inspection and snag lists, warranty coverage, spare parts and replacement, and ongoing maintenance. Before signing, ask:

  • Which components are covered for how long, and what is excluded?
  • Who supplies consumables and wear items such as filters, and at what lead time?
  • How are faults handled once the spa is commissioned — remote diagnosis, on-site attendance, or parts shipped to your local contractor?

Answers you can hold the supplier to are worth more than a general service promise. If your project has a handover date, put commissioning and snag sign-off into the programme.

A Pre-Purchase Checklist

  • Site access route measured and confirmed for the delivery vehicle and rigging.
  • Base or deck loading signed off by your engineer or builder.
  • Siting method fixed: in-ground, semi-recessed or above ground, with entry steps specified.
  • Equipment schedule confirmed line by line — control system, swim training system, pumps, jets, lighting, ozone.
  • Total connected load for your configuration issued in writing to the electrician.
  • Options selected and priced: heat pump, insulation, UV sterilisation, sand filtration, steps.
  • Scope split agreed: supplier delivery versus local trades, permits and inspections.
  • Warranty terms, exclusions and spare-parts lead times read before order confirmation.
  • Commissioning and snag sign-off placed in the project programme.

Frequently Asked Questions

Does WS-130AⅢ come with a swim training system?

The catalogue entry for WS-130AⅢ lists one swim training system among its equipment. Another configuration in the same 8000 × 3000 mm shell is listed without it, so confirm that item appears on your order's equipment schedule if swimming against a current for training is the main use.

Can I compare models using the published power figures?

Use them for early budgeting only. The figures are configuration-specific, and options such as heat pumps change connected load. Design your electrical installation to the confirmed schedule for your order.

What is included in water treatment?

Ozone is shown as a listed feature for this range, while UV sterilisation and sand filtration appear in the catalogue options. Which of them apply to your chosen configuration should be stated on the quotation.

Does the supplier install the spa on site?

Installation, inspection and snagging are part of our after-sales service. Site preparation, local electrical connection and permits remain with your local trades, so agree that split in writing before production starts.