A swim spa quotation is rarely one page long, yet the decision it asks you to make looks simple: is this the right shell, at the right price, for this site? In practice a proposal for Outdoor Swim Spa WS-SP600 can be written three different ways by three different suppliers, and the lowest number usually reflects the thinnest specification rather than the best value. The checklist below shows how to read a manufacturer’s proposal line by line before you sign it, using the published catalogue data for this model as the reference point.
1. Confirm You Are Comparing the Same Model
Model codes in the swim spa range carry suffixes that change what is actually delivered. The catalogue lists WS-SP600 and WS-SP600-MS side by side at the same shell size, but with different jet counts and different total power. If a quotation says only “600 series” or “5.9 m swim spa”, it is not comparable to anything until the exact code is on paper.
Ask for the model code in the quotation header, on every line item and on the packing list. A supplier who will not commit to a code in writing is keeping the right to substitute later.
2. Check the Shell Size Against Your Site
The catalogue records 5900 × 2500 × 1600 mm for this model. Treat that as a starting figure to verify, not an installation dimension. Before accepting it, ask three questions:
- Is this the shipping dimension or the finished dimension? Insulation, cladding and steps sit outside the shell and change the footprint.
- What is the water depth versus the overall height? The 1600 mm figure is external; usable swim length and water depth are separate numbers that decide whether the spa suits the people who will use it.
- How much clearance does the plant need? Filter, control system and any optional heat pump need access for servicing, not just a place to stand.
Send your plan, deck level and access route to the manufacturer and ask them to confirm in writing that the unit can be delivered along that route and lifted into position. If it cannot, the fix belongs in the quotation, not in a variation on site.
3. Read the Equipment Schedule Line by Line
The published specification for this model lists one control system, one swim training system, one filter pump, six jets and four LED lights, with water jets, LED lighting, ozone and a swim training system shown as features. The catalogue does not list a water pump for this configuration, while the -MS variant of the same shell lists a water pump and a far higher jet count at a higher total power figure. That gap is precisely why two quotations with identical shell sizes can differ sharply in price.
| Line to check | What “clear” looks like on the paper |
|---|---|
| Model code | Full code with suffix, repeated on every line and on the packing list. |
| Pumps | Quantity and duty stated for each pump. If a pump is missing from the schedule, ask whether it is excluded or simply omitted. |
| Jets | Total count, position and material. Jet count drives both price and the experience you are promising your client. |
| Swim training system | Shown as one set — confirm nozzle type and whether flow adjustment is part of it. |
| Water treatment | Ozone appears as a feature; ask whether UV sterilisation is included or priced as an option. |
| Lighting | Number of LED fittings and where they sit in the shell. |
| Total power | A power figure is printed against the standard shell and a higher one against the -MS variant. Check that the number on the quotation matches the equipment actually listed, since adding a water pump or heat pump changes it again. |
| Options | Control system, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps appear as catalog options — each should be priced explicitly, not bundled silently. |
4. Match the Power Figure to Your Electrical Supply
Total power is where a swim spa stops being a product question and becomes an electrical one. The figure printed against the standard shell rises on the -MS variant, and it moves again once options such as a water pump or heat pump are added. A responsible proposal states the connected load, the supply phase and voltage assumed, and whether protection and isolation are included or left to your electrician.
Get that figure in writing and hand it to the electrical designer for your site before you approve anything. If the local supply cannot carry it, the answer is a different configuration or a supply upgrade — and both cost more once work has started than they would have at quotation stage.
5. Test Whether the Manufacturer Can Build Around Your Project
A standard shell is often the starting point rather than the end of the conversation. Where a terrace, podium or villa landscape calls for a different outline, ask what shapes and finishes are available; the wider range includes outdoor spas built to square, round, oval and curved forms for gardens, terraces and leisure areas, with the shell reinforced around the chosen form. A supplier who can adapt the shell, the cladding and the surrounding deck furniture in one package removes coordination work that would otherwise fall on your team.
The same logic applies across the rest of the outdoor area. A swim spa is specified alongside loungers, dining sets and shade structures, and those items normally arrive from separate suppliers on separate dates. Where one manufacturer supplies both the water feature and the outdoor furniture around it, you get a single production schedule and one point of accountability.
6. Read the Delivery and After-Sales Terms as Carefully as the Price
The unit arrives on a container, and everything after that is logistics: packaging and container loading, freight by sea, air or rail, customs paperwork, tracking and delivery to the door. Ask which Incoterms the price is written on, who handles import clearance, whether cargo insurance is included, and what the quoted lead time covers — production only, or production plus transit.
Then read the after-sales section for specifics rather than assurances: which parts are covered, for how long, what is excluded, how spares are shipped, and who carries out installation and commissioning on site. Where a proposal is vague here, ask for it to be rewritten. A supplier who can commit in writing will do so, and one who cannot is telling you something.
Before you sign — seven questions
- Does the quotation state the exact model code with suffix on every line?
- Are pumps, jets, swim system, ozone, lighting and power given as quantities rather than descriptions?
- Is any catalog option — insulation, steps, heat pump, sand filtration, UV — excluded silently?
- Has the supplier confirmed in writing that the shell dimensions suit your access route and deck?
- Has the total power figure been passed to the electrical designer for the site?
- Which Incoterms apply, and what does the quoted lead time include?
- Are warranty period, exclusions and spare-parts supply stated in numbers rather than adjectives?
The Practical Bottom Line
A proposal for Outdoor Swim Spa WS-SP600 is easy to compare on price and hard to compare on substance. Work through the model code, shell dimensions, equipment schedule, power figure and delivery terms in that order, and ask for every gap to be closed in writing. Two quotations that look identical on page one usually turn out to describe different products once the plant list is read line by line — and that is where the real cost sits.
Send us your drawings and the quotation you are assessing
SANTERSON has manufactured furniture and building materials since 2008 and supplies outdoor, water and interior products for villa, hospitality and office projects, with custom/OEM work, door-to-door logistics and installation support. Share your plan, the model codes on the quotations you hold and your local supply details, and we will confirm the configuration, options and power requirements in writing so that you are comparing like with like.