A swim spa rarely fails at the point of installation. It causes trouble in the weeks before that, when a quotation, a drawing and a site instruction each describe a slightly different machine. Outdoor Swim Spa WS-SP500 is a compact, self-contained unit in our configurable outdoor swim and hydrotherapy range, which makes it easy to specify in a single line of a bill of quantities — and equally easy to under-document. The notes below set out what a procurement team should have in writing before a purchase order is raised, so that the shell, the equipment inside it and the site around it all arrive on the same schedule.
Start with the model code, not the product family
WS-SP500 sits in a range of swim and hydrotherapy units that share cabinet styles, jet layouts and control components. The suffix matters: the range includes WS-SP500 alongside configurations such as WS-SP500-MS, which carry the same catalog envelope but different equipment sets. A requisition that says only "Santerson 5-metre swim spa" leaves the supplier and the buyer describing different products. Record the exact model code on the enquiry, the quotation, the purchase order, the packing list and the delivery note, and keep them identical. If a substitution is proposed during the project, re-issue the specification rather than annotating an old document.
Record the catalog dimensions as a starting point, then confirm the site figures
The published catalog lists WS-SP500 at 5000 × 2500 × 1600 mm. Treat that number as the shell envelope for planning, not as the finished dimension on your terrace. Two additions change what the site actually has to accommodate: steps and access arrangements, which extend the footprint at one end, and any insulation or cladding package specified for a cooler climate. Equally, the water level relative to the deck, the position of the control system and the clearance needed for filter and pump servicing are decisions your team makes, not defaults inherited from the catalog.
Document three separate dimensions before ordering: the external shell as supplied; the full envelope including steps and any cladding; and the clear service access required around the equipment side. The third figure is the one most often missing, and it determines whether a technician can reach the filter pump and control system years later without removing decking.
Confirm what is included and what is optional
The specification shown for WS-SP500 lists a control system of one set, a swim training system of one set, one filter pump, six jets and four LED lights. Options catalogued across this range include additional control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so an option that exists on one unit in the range is not automatically available on another.
Two items deserve particular attention in your documentation. First, the water pump: our published specification for this model does not state it, so a quotation should say explicitly which pump is supplied, at what flow rate, and whether it is included in the quoted price or priced as an option. Second, total power — the catalog figure for WS-SP500 is 9.35 kW. Use that as the planning input for electrical design, but require confirmation of the final figure once the configuration is fixed, because heat pumps and additional control systems change both the connected load and the circuit requirements.
| Item | What to capture in writing |
|---|---|
| Model code | Exact code as quoted, matched on every downstream document |
| Dimensions | Catalog envelope, full site envelope with steps and cladding, service clearance |
| Equipment list | Quantities per line: control system, swim training system, filter pump, jets, LED lights |
| Water pump | Model, flow rate, inclusion or exclusion in price |
| Power | Catalog figure as planning input; confirmed connected load for the selected configuration |
| Options | UV sterilisation, heat pump, sand filtration, insulation, steps — each priced and confirmed compatible |
Specify the electrical and water supply scope as a boundary
Most swim spa disputes we see in project documentation are not about the spa itself. They concern the line between the supplier's scope and the site contractor's scope. Write that boundary down once, clearly: who runs the supply cable to the unit, who provides the isolation device and protective devices, who carries out first connection and commissioning, and who is responsible for the deck drainage around the shell. State the electrical requirements for the confirmed configuration — supply voltage, phase, dedicated circuit sizing — in the language your local electrician uses, and have that professional review the figures before the trench is dug or the slab is poured.
Do the same for water. Fill source, drain route, whether an overflow or skimming line is required, and where chemicals are stored and dosed should all appear on the drawing rather than in a site conversation.
Logistics documentation: what to require before dispatch
For imported units, the packing list and the commercial invoice should describe the same configuration as the purchase order. Ask for a photograph of the packed shell and a list of loose items — control system, jets, LED fittings, steps, any heat pump — so that the receiving team can check a delivery against a document instead of a memory. Where our furniture logistics and door-to-door delivery service handles freight, customs paperwork and container loading, your team still benefits from naming the receiving party, the delivery window and the equipment needed to place the shell on its foundation. A 5000 mm unit arriving on a site with no crane or forklift access is an avoidable cost.
Site preparation and installation records
Before the shell arrives, capture the following as signed-off items: foundation or plinth level and load capacity; a level base verified on site; waterproofing and drainage detail at the perimeter; confirmation that service access is unobstructed; and the electrical route completed and tested. After installation, record commissioning readings, the as-built configuration against the purchase order, and any snag list with dates. Our installation and after-sales support service covers on-site installation, inspection and snags, warranty coverage and spare parts; the practical value of your records is that a warranty claim or a spare-part request can be resolved from documentation rather than from an inspection visit.
A short checklist for the file
- Exact model code on enquiry, quotation, purchase order, packing list and delivery note
- Catalog envelope plus site envelope plus service clearance, all three drawn
- Included equipment listed with quantities; options priced and confirmed compatible
- Water pump stated explicitly, including flow rate and price inclusion
- Connected load confirmed for the final configuration and reviewed by a local electrician
- Scope boundary between supplier and site contractor written once and referenced everywhere
- Receiving arrangements, unloading method and delivery window agreed before dispatch
- Commissioning readings and as-built configuration filed with the warranty documents
Where this fits in a wider project package
Swim spas are rarely bought alone. On villa and resort projects they arrive as part of an outdoor package — loungers, dining sets, pergolas and cabanas — alongside interior fixtures and finishes. Specifying the spa within that package rather than as a standalone purchase simplifies freight, aligns delivery windows and keeps one team accountable for handover. If you are assembling several product lines into one procurement, our turnkey interior project solutions cover design consultation, material selection, manufacturing and quality control, project management and site coordination through to installation and handover.
For a specification review of WS-SP500 or another model in the swim and hydrotherapy range, send us the drawing and the configuration you intend to order. We will confirm which equipment is included, what is optional, and what the site team needs to have ready before delivery.