A swim spa looks like one line item on a villa or hotel schedule until it arrives on site with three pumps, an ozone generator and a 10 kW electrical load that nobody signed off. The Outdoor Swim Spa WS-S04B is a compact hydrotherapy unit in our configurable swim and hydrotherapy range, and it is a good example of the kind of product where the paperwork decided months earlier determines whether installation runs smoothly. Below is the documentation we ask procurement teams to prepare before we quote one.
1. The exact model code and the configuration attached to it
Model codes in our swim spa range carry suffixes, and those suffixes are not decoration: WS-S04, WS-S04B and WS-S04X are separate catalogue entries with different dimensions, jet counts and power figures. A purchase order that says only "S04 series" cannot be quoted accurately, and a site team installing to the wrong drawing will find the footprint does not match the slab.
For the Outdoor Swim Spa WS-S04B, the catalogue lists 3900 x 2200 x 1450 mm, a jet total of 31 pieces with 6 water columns, 3 water pumps and 1 filter pump, 2 LED lights plus 28 small LED lights, one control system and a total power figure of 10.35 kW. Treat those as catalogue reference values for the standard configuration. What ships is defined by the confirmed option list on your order, so record both: the model code and the approved configuration sheet, with revision dates.
Where a project needs something different from the standard range, we also build customizable shape outdoor spas for personalised hydrotherapy pools. In that case the document trail matters even more, because the geometry, seating and equipment layout are drawn specifically for your site.
2. Site dimensions, access route and structural notes
Record the finished external dimensions against the prepared base, not just the internal water volume. Note the clearance needed for the control system, filter pump and any sand filtration option, because maintenance access is where projects usually get into difficulty after handover.
- Base or slab level, drainage falls and waterproofing detail as built on site.
- The route from the delivery vehicle to the final position: gate widths, overhead obstruction, lift capacity and whether a crane is required.
- Whether the unit sits above ground, semi-recessed or fully recessed, and who is responsible for the surrounding deck or coping.
3. Power supply and electrical responsibility
The catalogue total power figure covers the standard equipment set, that is pumps, jets, lighting and ozone. It does not cover a heat pump if that is added as an option, and it does not tell your electrician what local supply, protection or earthing arrangement applies at your address. Document who designs and installs the supply and isolator, whose electrician makes the final connection, and what circuit capacity you have confirmed on site before production starts.
Send us your electrical schedule and any local wiring requirement early. We confirm the equipment load and connection point for the selected configuration; your local contractor handles approval and installation to the rules that apply at the site.
4. Options included versus options excluded
Catalogue-listed extras across the range include control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so an option that exists for one unit is not automatically available on another. Put each option on the purchase order line by line, and ask us to state clearly which items are included in the quoted price and which are supplied locally.
| Item to document | Why it matters at handover |
|---|---|
| Model code and configuration revision | Fixes dimensions, jet layout and equipment set for as-built records |
| Included versus optional equipment | Prevents a missing heat pump or steps package on arrival |
| Total power and connection point | Allows the electrical contractor to size supply before production |
| Water treatment method (ozone, UV, sand filtration) | Determines ongoing maintenance and consumables for facilities teams |
| Delivery terms and access route | Sets responsibility for offloading and positioning on site |
5. Delivery, installation and after-sales records
Our services cover logistics and door-to-door delivery, plus installation and after-sales support. For a swim spa, document the delivery term you have agreed (who offloads and who positions the unit), the inspection record signed at handover, and the warranty and spare-parts terms in writing with named contacts. Facilities teams inherit these units years later; a clean file saves them from guessing which pump belongs to which circuit.
A short checklist before you issue the enquiry
- Model code, catalogue dimensions and the configuration you expect us to quote.
- Site photos, prepared base detail and the access route for delivery.
- Confirmed electrical capacity and the name of the party responsible for connection.
- Option list with inclusions and exclusions stated line by line.
- Delivery term, inspection process and after-sales contact for handover.
If you can send those five items with your enquiry, we can quote the WS-S04B or a comparable model in our swimming pools and swim spas range without a round of clarification, and your site team gets a file they can actually build from.
Tell us the model code, your site condition and the electrical arrangement, and our project team will confirm the configuration for your villa or hospitality development. Contact PHILLIP at SANTERSON, Phone / WhatsApp +86-13928214007, Email santerson@qq.com, or use our contact page.