A swim spa quotation is only comparable when every buyer sends the supplier the same information. Two enquiries for Outdoor Swim Spa WS-SP600-MS can produce prices that differ by a wide margin, simply because one buyer asked for the base unit and the other asked for heated, insulated, fully accessorised units delivered to site. This guide lists what to put in your request for quote (RFQ) so the figures you receive describe the same scope, and so the supplier can answer without another round of questions.
1. Model, quantity and the role it has to play
State the exact model code — WS-SP600-MS — together with the quantity and whether the units are for a single villa, a resort programme or several addresses. Quantities change both the unit price and how options such as spare parts, packaging and freight consolidation are handled. Then say what the spa has to do day to day: lap swimming against a current, hydrotherapy and relaxation, guests at a hotel or resort, or a private garden installation. The intended use determines which jet layout, control arrangement and accessory set you should be quoted for.
The catalog entry for this model lists overall dimensions of 5900 × 2500 × 1600 mm, a swim training system, water jets, LED lighting and ozone treatment. Treat those published figures as a starting point and ask the supplier to confirm what is included in the specific configuration being priced, because equipment sets and electrical requirements vary between configurations.
2. Site conditions and access
Send the room or plot dimensions with clearances on every side, plus the finished water level you want relative to the surrounding deck. Note whether the spa will sit above ground, be partly recessed, or stand on a terrace or roof, and confirm that the supporting structure can carry a filled shell of this size — ask your engineer to verify this rather than assuming it.
Also describe how the unit reaches the position: truck size at the gate, whether a crane or lifting equipment is needed, staircase or lift dimensions for indoor settings, and any restricted access hours. Access problems discovered after production starts are expensive to fix, so this information belongs in the RFQ, not in a later email.
3. Power supply and plant room details
Give the available supply: voltage, phase (single or three), frequency, and the location of the nearest distribution board relative to the spa. The catalog figure for total power on this model is 11.55 kW; ask the supplier to confirm the connected load and recommended protection for the configuration you are buying, and state whether your local electrician will provide the dedicated circuit, isolation and earthing. If a plant room or equipment niche is part of the design, share its dimensions and ventilation arrangement so filtration and control components can be positioned properly.
4. Equipment scope and options you want priced
List what you expect in the price and what you expect to buy separately. Catalog-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so request each option as a priced line item rather than assuming it is bundled. A useful RFQ table looks like this:
- Base shell, frame and finish colour or texture
- Swim training system and jet package — quantity and type per the catalog entry
- Filtration choice: cartridge or sand filtration
- Sanitisation: ozone as standard, UV sterilisation if required
- Heating: heat pump or other source, plus target water temperature
- Insulation and cover, where year-round operation is intended
- Steps, seating and LED lighting arrangement
- Spare parts and consumables to ship with the order
If your design needs a non-standard shape or size, say so at RFQ stage. The range also covers customizable shape outdoor spa options — square, round, oval and curved shells with an acrylic surface and structural reinforcement — which are worth quoting alongside the standard model if space or aesthetics demand it.
5. Delivery terms, documentation and installation responsibility
Specify the delivery address or addresses and the Incoterm you want quoted: EXW, FOB, CIF or door-to-door. A landed cost is impossible to compare unless every supplier prices the same term. Ask which documents will accompany the shipment — commercial invoice, packing list, certificate of origin, and any import paperwork your country requires — and confirm who handles customs clearance at destination.
State clearly whether you expect installation support on site or a local contractor will fit the unit. For projects combining the spa with other pool, outdoor and interior products, mention this in the RFQ as well; coordinating several product groups under one supplier simplifies drawings, production slots and shipments. Santerson describes its service path as design consultation and space planning, material and product specification, manufacturing with quality control, project management and site coordination, then installation and handover — useful to reference in your enquiry so the supplier knows which stages you need.
6. After-sales expectations and lead time
Ask what warranty applies to the shell, pumps, controls and jets, what is excluded, and how spare parts are supplied and shipped. Request the production lead time for the confirmed configuration plus estimated transit time to your port or site, and note any dates you are working to — a topping-out date or a hotel opening — so the supplier can flag feasibility early. Do not assume response-time or warranty figures from marketing pages apply to your project; ask for them in writing for the specific order.
7. A short RFQ checklist
- Model code, quantity, project type and destination addresses
- Intended use: swim training, hydrotherapy, guest facility
- Site dimensions, clearances, water level, structural and access constraints
- Supply characteristics and the connected load to be confirmed by the supplier
- Priced line items for every option: heating, filtration, sanitisation, insulation, steps, lighting, spares
- Incoterm, delivery address, required documents, customs responsibility
- Installation responsibility and site support expected
- Warranty scope, spare-parts supply, production lead time and transit time
- Drawings, reference photos or the layout you are working from
Send that information for each supplier you approach and the returned quotations become directly comparable: same model, same options, same delivery term, same division of responsibility. If your project needs a spa quoted together with outdoor furniture, bathroom fixtures or other fit-out items, send the whole package list at once so the scope can be reviewed as one programme rather than as separate orders.
To request a configuration and quotation for Outdoor Swim Spa WS-SP600-MS, contact SANTERSON: https://www.santerson.com/contact/