A swim spa submittal is the document pack a buyer, consultant or contractor reviews before an order is placed: drawings, equipment schedules, electrical data, delivery terms and responsibility boundaries. For a configurable product such as Outdoor Swim Spa WS-130CⅣ, the quality of that pack decides whether the project runs smoothly or stalls on site. Below is the checklist we work to when preparing a submittal for this model, so you can compare suppliers on the same terms.
1. Shell dimensions and the envelope they create
Start with the outer shell, because everything downstream — foundations, access routes, plant location, drainage — depends on it. The catalogue figures for WS-130CⅣ are 11830 mm long, 3000 mm wide and 1430 mm deep. Treat these as catalogue data to be reconfirmed on your order, not as final fabrication tolerances.
A complete submittal states the dimension datum (overall shell versus water line), the maximum transport module size, and how the unit is delivered: one piece or sections joined on site. It also shows clearance zones for the plant cabinet, cover storage and step access, which are easy to miss at drawing stage and expensive to fix later.
2. Equipment schedule: what is standard, what is optional
The most common source of disputes is a specification sheet that lists everything without saying what is included. For WS-130CⅣ the site shows the following:
| Item | Shown in catalogue |
|---|---|
| Control system | 1 set |
| Swim training system | 1 set |
| Water pump | 1 pc |
| Filter pump | 1 pc |
| Jet total | 20 pcs |
| LED lights | 7 pcs |
| Total power | 10.85 kW |
| Features shown | Water jets, LED lighting, Ozone, Swim training system |
Catalogue-listed options for the range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so a proper submittal lists each option as included, optional at a stated price, or not offered for this configuration.
Note the difference between close variants in the same family: Outdoor Swim Spa WS-130CⅣ-U shares the 11830 × 3000 × 1430 mm shell but is scheduled with 4 water pumps, 23 jets, 5 LED lights and a total power figure of 11.85 kW, and its captured specification does not list a swim training system. If your tender names one model, do not let the submittal quietly switch to another.
3. Electrical and utility data the electrical engineer needs
Total power is only the first number on an electrical schedule. A usable submittal states, for the exact configuration ordered: supply voltage and phase, breaker rating, cable size recommendation, earthing and equipotential bonding arrangement, control panel location, and the dedicated circuits for pumps, lighting and any heat pump added as an option. Where a swim training system is included, its drive should be listed separately so the engineer can see the starting current.
The same applies to water and drainage: fill source, drain route, filter pump location, overflow arrangement and ventilation at the plant cabinet. If these are not drawn in the submittal, they will appear later as site variation costs.
4. Structural and site-preparation information
The submittal should hand the structural engineer a clear set of inputs: bearing support points and their loads, whether the installation is above ground, semi-recessed or fully recessed, the perimeter trim detail, access hatch size, and the slab or strip footing requirement. For a recessed pool, waterproofing responsibility and drainage around the excavation should be named in writing as either supplier scope or contractor scope.
5. Configuration drawings and finishes
Ask for dimensioned general arrangement drawings, a jet layout plan, an LED and lighting layout, and the step or seating detail, together with the finish samples you have selected. For project work these drawings should carry the model code, revision number and date, so that comments from consultants can be tracked against a specific version.
6. Logistics, installation and after-sales terms
SANTERSON's project service covers design consultation and space planning, material and product specification, manufacturing with quality control, project management and site coordination, then installation and handover; freight is arranged by sea, air or rail with customs paperwork and door-to-door delivery. In the submittal these services should be reduced to concrete terms: packing method and container type, Incoterms and named destination, delivery window, crane or access requirements on site, who performs installation and commissioning, what the warranty covers and for how long, which parts are stocked as spares, and how a service call is raised.
7. Comparing models before you lock the specification
The WS-130CⅣ sits in a configurable range, and shell length is usually the deciding factor between a lap-swimming layout and a spa-led layout. The catalogue also lists shorter members of the same family, such as Outdoor Swim Spa WS-130BⅣ at 9950 × 3000 × 1430 mm and Outdoor Swim Spa WS-130AⅣ at 8000 × 3000 × 1400 mm. If the site cannot take an 11.8 m envelope, compare those instead of changing supplier mid-tender. The wider range is listed under Swimming Pools and Swim Spas, and where a swim spa sits within an outdoor living scheme it is normally coordinated with the rest of the terrace package from Outdoor Furniture for Villas and Resorts.
8. Common gaps that delay approval
- A specification sheet with no included / optional split, so prices move after order confirmation.
- Total power quoted without voltage, phase and circuit details for the local supply.
- No dimension datum or tolerance statement, leaving the builder to guess at setting-out.
- Waterproofing, excavation drainage and plant-room ventilation left out of both scopes.
- Model code changed between brochure and quotation without a note on what that changes in jet count and power.
9. A short checklist to send with your enquiry
When you request a submittal, ask for: dimensioned drawings of the ordered configuration; an equipment schedule marking included and optional items; electrical data for your supply; support loads and site preparation notes; packing and delivery terms with Incoterms; installation and commissioning scope; warranty terms and spare-parts availability. Suppliers who answer all of these in one pack are usually the ones whose projects run to programme.