A floor-to-ceiling modular wall unit looks simple on a mood board and complicated on site. The difference between the two is almost always the quality of the brief that reaches the factory. Our Santerson Floor to Ceiling Modular Systems are made to measure for residential projects, with layout, dimensions, materials and finishes specified per space — which means the information you send us matters more than the drawing you attach.

Below is what a procurement lead, designer or builder should have in hand before requesting a quotation, so the first round of drawings is close to the last one.

1. Start with the wall, not the cabinet

Send the actual opening: overall width and height at several points, out-of-plumb or out-of-square deviations, skirting and cornice details, and whether the ceiling is plasterboard over studs, concrete or a suspended grid. A unit that runs to the soffit needs to know what it can be anchored to. Note the position of power sockets, switches, downlights, radiators, air-conditioning grilles and any pipework you cannot move.

If the room is being photographed, wide shots from both ends plus a straight-on shot of the wall are more useful than styled close-ups. A short phone video walking the wall usually answers questions a plan does not raise.

2. Specify what goes inside before what goes outside

Modular systems fail in daily use for internal reasons: shelf spans that sag under books, hanging rails placed at an awkward height, deep shelves nobody can reach. Decide the storage mix first — open display, closed doors, drawers, niches, media housing — and tell us what you intend to store in each zone. Our Closed Modular Units suit clutter hiding in living and hallway runs; open shelving suits display and frequently used items. Many projects mix both in one elevation, and that mix should be agreed at layout stage rather than on site.

For media walls, state the television size and mounting method, plus where the decoder, console and speaker run to. Cable routes and ventilation for equipment bays are far cheaper to resolve in the drawing than in the wall.

3. Lock down materials and finish with samples

Tell us the substrate you want and the surface you expect, then confirm both against a physical sample before production. Veneer, lacquer, melamine and acrylic behave differently under the same lighting, and a colour name in an email is not a specification. Where the modular run has to match existing joinery or kitchen cabinetry, send a sample panel or the exact make and code of what is already installed.

Edge treatment, handle or handleless detail, door grain direction and visible versus concealed fixings are all worth writing down. So is the sheen level — a matte that reads soft in a showroom can look chalky in a north-facing room.

4. Treat integrated lighting as an electrical item

If you want lit niches or shelves, send the switching arrangement and where the driver and transformer will sit and be accessible for maintenance. Our Modular System with Lighting configurations need this decided before the carcass is built, because conduit and access holes are cut at the factory. Specify colour temperature and whether dimming is required, and confirm who supplies the transformer and who wires it on site.

5. Say what you are buying as one package

A single project usually needs wall units, wardrobes, media walls, vanities and cabinetry from different trades. Ordering them together through a custom and OEM service keeps finishes consistent, consolidates shipments and puts one party responsible for coordination. Tell us the full scope even if you only want a price for one room first; it changes how we plan production runs and container loading.

6. Give us the delivery reality

Pass on lift sizes, stair widths, doorway clearances and the floor the units land on. Tall sections that fit a drawing may not fit a service lift. Confirm the port or delivery address, the Incoterms you want quoted, and the date the site will actually be ready for installation — not the date it was scheduled to be.

Our logistics and door-to-door delivery service covers freight forwarding, packaging and container loading, customs paperwork and tracking; installation and after-sales support follow the delivery stage. Tell us whether your own fitters will install or whether you want our team on site, because that determines how the units are packed and labelled.

7. Agree the approval sequence in writing

Our cooperation steps run from project brief and design proposal, to quotation and detail confirmation, then production, shipment and follow-up. Ask for shop drawings at scale, with every elevation dimensioned and every finish called out, and make sure one named person signs them off. Late changes after drawing approval are the single largest source of delay on bespoke joinery.

A short checklist to send with your enquiry

  • Measured wall dimensions at multiple points, plus ceiling type and fixing constraints
  • Room photographs or a walk-through video of the wall
  • Intended use for each zone: display, closed storage, drawers, media, hanging
  • Substrate and surface preference, plus samples or existing finishes to match
  • Lighting layout, switching, driver location and dimming requirement
  • Television and equipment sizes, cable routes and ventilation needs
  • Access route on site: lift, stairs, door widths, delivery floor
  • Delivery address, preferred Incoterms and realistic site-ready date
  • Name of the person who approves shop drawings

Send that much information and a manufacturer can quote accurately the first time, flag conflicts before metal and board are cut, and ship units that go together on site. If you would like an honest read on a drawing set for a villa or apartment project, contact us and we will tell you what is missing.

Specifications, dimensions, finishes, electrical arrangements and delivery scope are confirmed per project; the configuration agreed in your approved shop drawings governs production.