A short email asking for a kitchen cabinet price usually comes back with more questions than answers. Built-in cabinetry is not a catalogue item you simply order by model number: it is an interior fixture made to your dimensions, and every detail you leave open becomes a variation later. If you are fitting out hotel guest suites, serviced apartments or a residential kitchen, the fastest way to a reliable quotation is to send the same information a manufacturer needs to cut panels. Below is the checklist we work from, so your first enquiry can move straight into design and costing.

Start with the room, not the door colour

The single most useful document you can attach is a measured drawing of the kitchen space: wall lengths, floor-to-ceiling height, and the position of every fixed element you cannot move. Mark the soil and waste stack, water inlets, the flue or ventilation route, existing electrical positions, switchboards, windows, door swings and any structural column. For hotel and apartment work, also note floor levels between typical floors, because a cabinet bank that fits one level has to fit every repeated level without site modification.

If you do not have architectural drawings yet, a set of on-site photographs with a tape measure visible in each shot, plus a hand sketch with dimensions, is enough for a first round. What you should avoid is sending only a mood image and asking for a price per metre — that request cannot be answered honestly.

Decide the layout logic before you choose finishes

Tell the supplier how the kitchen will actually be used, and let that drive the layout. An L-shaped arrangement supports a clear working triangle between washing, preparing and cooking, which is why it recurs so often in apartment kitchens; the Black & Light Grey L-Shaped Kitchen Cabinets page shows how that layout carries a glass display section, an oven position and a tall cabinet in one run. Where the kitchen opens into the living area, the cabinetry has to read as furniture rather than equipment — open plan kitchen cabinetry is specified for exactly that situation, in hotel suites and serviced apartments where the cooking area is on show.

For each unit type, state what it must hold. Pantry storage, small appliances, recycling bins, linen, a wine fridge, or nothing at all — these answers determine internal partitions, drawer stacks versus shelves, and the hardware list. Our own custom built-in kitchen cabinets are specified as interior fixtures for hotel, apartment and residential renovation work, with layout, sizes, door styles and surface finishes set per project rather than chosen from a fixed range.

Name the appliances early, with their dimensions

Appliances are the most common cause of rework in built-in joinery. Send the make, model and cut-out dimensions of every appliance you intend to install — oven, cooktop, rangehood, refrigerator, dishwasher, microwave, wine fridge — before drawings are finalised. Integrated appliances need a ventilated housing and a door panel that matches the cabinetry; freestanding units need a clear opening and a visible gap. A tall cabinet built around an oven stack is straightforward on paper and expensive to correct after production.

If appliances are still undecided, say so explicitly and ask the supplier to reserve standard cut-outs with a documented change point. Integrated appliance tall cabinets are configurable, but the appliance dimensions, ventilation and electrical requirements have to be confirmed for each project before the carcass is made.

Specify panels, finishes and hardware as separate decisions

Panel material, surface finish, door profile and hardware are four different line items, and a quotation that bundles them cannot be compared with a competitor's price. Ask for each separately.

  • Door profile: flat panel, shaker raised panel or handleless. Handleless work relies on a touch-to-open mechanism or a recessed rail, so the drawer construction changes — see the handleless minimalist kitchen cabinets for how the seamless front affects the fitting specification.
  • Surface: matte, high gloss, wood grain or textured. In shared rental and hotel use, matte and textured panels tend to show handling marks differently from gloss, so request samples in the actual finish rather than a colour chip.
  • Hardware: hinges, drawer slide rails, support legs and connecting brackets are part of the supply for project cabinetry. State whether you need soft-close throughout, and whether hardware should be pre-fitted on site-ready units or shipped loose.
  • Worktops and splashbacks: confirm whether stone, laminate or a matching panel backsplash is included in your enquiry or supplied by another trade.

Integrated lighting is easy to forget and hard to add afterwards. If you want LED strips inside glass display cabinets, under wall cabinets or in open niches, specify the profile position, the driver location and the switching circuit on the drawing. The grey modern kitchen cabinets with LED glass wine cabinet show the detail that matters: the lit glass section needs a power feed and a serviceable driver, planned before the carcass is built.

State quantities, unit mix and delivery terms

Project pricing depends on repetition, so be precise about volume. Give the number of kitchens, the unit types (guest suite, one-bedroom, two-bedroom), and whether all units are identical or split into typologies. A hotel tower with four repeated kitchen types is quoted very differently from a single bespoke villa kitchen.

Then set the commercial frame in the same message: destination port or site address, preferred Incoterms, target delivery window and whether you want shipment staged by floor or phase. For overseas supply, freight is arranged by sea, air or rail with customs paperwork handled as part of logistics and door-to-door delivery, but import duties, local site access and lifting arrangements are yours to confirm with your own agent — send the site constraints early so packaging and container loading suit them.

Ask for a prototype unit, not just a rendering

For multi-unit work, request one sample kitchen or one cabinet bank built to your final specification before the full order is released. Check the door alignment, the finish under the lighting you will actually use, the drawer runners under load and how the carcass meets an uneven floor. This step is where a project either locks in or reveals its problems cheaply.

Confirm the coordination route as well: who issues shop drawings, who signs them off, how site measurements are verified, and what happens if a wall is out of plumb. Design support, production coordination and on-site guidance sit under interior design services, and installation and after-sales support are handled as a separate stage — get the split of responsibility in writing before production starts.

A ready-to-send enquiry list

  • Measured drawings or photographs with dimensions; floor levels and site address
  • Unit mix and quantities, plus the typology breakdown
  • Appliance models and cut-out dimensions, or a written note that they are undecided
  • Door profile, panel material, finish samples required, hardware specification
  • Lighting positions, driver locations and switching plan
  • Delivery terms, staged quantities and the installation responsibility split

Send those six items and a manufacturer can return drawings and a costed quotation instead of a list of questions. For the wider range of cabinetry and kitchen cabinets and hotel appliances we supply for residential and hospitality projects, the same rule applies: the more of this information you bring to the first conversation, the fewer revisions stand between your enquiry and a finished kitchen.

Send your drawings and unit list with the project name and site address, and we will come back with a layout proposal and an itemised quotation for review.