A swim spa quotation is only as good as the information behind it. Two buyers can both ask for Outdoor Swim Spa WS-S04 and receive very different prices, because the shell size is only one line in the specification. Before we quote, we need to know how you will use the unit, what your site can supply, and which equipment you want included. Here is exactly what our project team asks for.

1. How the spa will be used

Intended use drives shell depth, jet count and whether a swim training system is needed at all.

  • Primary purpose: daily lap swimming, hydrotherapy and massage, children's play, or a mixed family setup. A long swimming channel and a dedicated relaxation end are different requirements, and our range covers both — see the Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool.
  • Typical users: number of adults and children, plus anyone using the spa for rehabilitation or low-impact exercise.
  • Season: year-round use in a cold climate needs insulation and a heat pump; a covered terrace in a mild climate may not.
  • Setting: villa garden, rooftop terrace, resort pool deck or hotel outdoor zone. Commercial use changes the filtration and maintenance cycle.

2. Site conditions and access

These items decide whether the delivery is straightforward or needs lifting equipment and a structural review.

  • Slab or deck type, its level area, and the load rating if the spa sits on an upper floor or balcony.
  • Clear opening dimensions and the route from the truck to the final position — stairs, gates, tight corners, overhead wires.
  • Drainage provision and whether the unit will be recessed, semi-recessed or fully above ground.
  • Wind, salt-air or high-altitude exposure for coastal and elevated sites.

3. Power, water and drainage

The electrical question is the one most often missing from an initial enquiry.

  • Supply: single-phase or three-phase, available amperage, and the supply voltage at the panel. The total power shown on a catalogue page is a reference for that configuration, not a guarantee for yours.
  • Circuit: whether a dedicated circuit and isolator can be run to the spa, and who supplies the electrician.
  • Water: mains fill point, hot or cold feed, and access for periodic draining and refilling.
  • Control preference: wall panel, remote or app control, and whether you want ozone or UV sterilisation as standard.

4. Configuration and options

Tell us what must be in the quote and what can stay optional, so the price is comparable between models.

ItemWhat to specify
Shell and finishColour of shell and cabinet, acrylic interior, cover type
Water systemNumber and type of jets, water columns, waterfall feature, swim training unit
HeatingElectric heater or heat pump, target water temperature, insulation package
Filtration and hygieneFilter pump, sand filtration, ozone, UV sterilisation
LightingMain LED fixtures, accent LEDs, colour control
AccessoriesSteps, handrail, automation and remote control

Catalogue pages list the features shown for each model. For WS-S04 the published sheet shows a 4090 × 2200 × 1110 mm shell with water jets, LED lighting, ozone and a waterfall; the jet and pump counts on that page belong to that specific build. Treat every catalogue figure as a starting point and confirm the equipment list for your configuration in writing.

If none of our standard shells fits the space, we also build Customizable Shape Outdoor Spa units — square, round, oval and curved — where shape and dimensions follow the site plan rather than a model code.

5. Commercial terms

  • Quantity: one unit for a private villa, or several units for a resort or housing development. Batch orders change packing and pricing.
  • Delivery term and destination: port of discharge or door address, and your preferred Incoterms. We arrange freight and Furniture Logistics and Door-to-door Delivery, so tell us whether you want delivery to port or to site.
  • Import arrangements: who acts as importer of record in your country, and any documentation your customs authority requires.
  • Installation responsibility: our team can provide on-site guidance, but local plumbing and electrical work is normally carried out by licensed trades in your region.
  • Timeline: required installation date, so we can confirm production scheduling around it.
Send drawings or photographs of the site if you have them — a plan showing the slab, a photo of the access route and one clear shot of your electrical panel answer about half of our questions in a single message.

6. What you receive back

A complete enquiry gets a complete reply: an itemised quotation with the equipment list, the dimensions and weight for access planning, the recommended power supply, packing and freight options, and a production schedule. If your site conditions rule something out — insufficient amperage, an access route too narrow for the shell — we will say so before you commit, and propose an alternative model or a split delivery.

Swim spas are only one part of an outdoor project. Where the spa sits beside a pool deck with loungers, cabanas and dining sets, we can coordinate the whole zone as a single order; see Outdoor Furniture for Villas and Resorts and our Turnkey Interior Project Solutions.

Common questions before quoting

Can you quote from the model number alone?

We can give an indicative figure, but a firm quotation needs the site and power details. The same model with a heat pump, extra insulation and sand filtration prices very differently from the base catalogue build.

What if my space is not rectangular?

Send the plan. Custom shell shapes are produced for terraces, courtyards and irregular poolside areas where a standard model leaves dead space.

Do you supply the electrician and plumber?

No. We specify the requirements and provide installation guidance; connections are done by licensed local trades, which is what local regulations normally require.

Send us your site details and we will return an itemised quotation for the configuration that fits.

Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or use our contact page. Include your location, the intended use, and a photo of the site if you have one.