A request for quote that only gives a product name and a room size usually comes back with a number you cannot compare. For made-to-measure cabinetry, the quotation depends on details the supplier has to guess if you leave them out. This guide walks through what to put in an RFQ for our Aluminum Frame with Solid Panel kitchen collection, so the price you receive reflects the job you actually want built.
Why this product line needs a fuller brief
The Aluminum Frame with Solid Panel range sits in our aluminium frame kitchen cabinet collection. Each run is produced to the dimensions of the space, with material and finish selected per project and a layout drawn around how the room is used. That means there is no single list price attached to "one metre of cabinet". Panel type, frame profile, door style, hardware and the way units meet walls and appliances all change the bill of materials.
Send an incomplete enquiry and you will get an indicative figure that moves once the drawings arrive. Send a complete one and the quotation you receive can be placed alongside quotations from other suppliers on the same basis.
Drawings and dimensions: what we need to see
Before anything else, include the measured drawings of the kitchen. These do not have to be architect-grade, but they must be accurate:
- Wall lengths with the position of doors, windows, and any structural column or beam.
- Floor-to-ceiling height, plus the height of any window sill that a unit has to pass under.
- Positions of existing or planned water supply, waste, gas and electrical points.
- The appliances you intend to install, with their published dimensions — oven, cooktop, extractor, dishwasher, refrigerator, microwave.
- Whether the run is straight, L-shaped, U-shaped or includes an island, and how many tall units you expect.
If a design has already been prepared by your architect or interior designer, attach it. If not, tell us the room is still being planned and we will work from your measurements through our interior design service, which covers space layout planning, furniture layouts and 3D visual renderings before production begins.
Materials, finishes and the panel you are actually specifying
"Aluminium frame" describes the construction, not the finished look. State clearly in the RFQ:
- Solid panel or glass. This collection covers solid-panel doors alongside Glass Front Aluminum Frame Cabinets, so say which doors are solid and which are glazed, and how many of each.
- Glass type where relevant. Clear, frosted or smoked glass changes both the look and the cost — see Frosted Glass Aluminum Cabinets and Smoked Glass Aluminum Cabinets.
- Frame colour and finish. Name the colour or send a sample reference; if you have a RAL code or a physical sample you are matching, say so.
- Two-tone schemes. If upper and lower runs differ, as in Two Tone Aluminum Frame Cabinets, list the colour for each run separately.
- Worktop. Say whether a worktop is included in your enquiry or supplied locally, and give its thickness if you already know it.
Hardware, interiors and the details that move the price
These items are often left out of an RFQ and added later as variations. Decide them before you send it:
| Item to specify | What to write in the RFQ |
|---|---|
| Hinges and slides | Soft-close or standard; brand if you have a preference; number of drawers per unit. |
| Handles or handleless | Profile handle, integrated channel, or push-to-open. Handleless fronts need a different edge detail. |
| Tall and corner units | Pull-out larder, corner carousel or drawer stack — the internal fittings drive cost more than the carcass. |
| Lighting | Cabinet interior lighting, plinth lighting or none; note where transformers may sit. |
| Plinth and trims | Recessed or flush plinth height, scribes, filler panels and beading to ceiling. |
| Splashback | Whether a matching panel is required between worktop and wall units. |
Quantities, project type and delivery terms
A single apartment kitchen and a forty-unit residential block are quoted differently, so be explicit about the job:
- Number of kitchens or sets, and whether units repeat across floors. Repeat layouts let us standardise components and hold a consistent price across phases.
- Project type — private villa, apartment, serviced residence or hotel. For hospitality and multifamily work our Custom Built-in Kitchen Cabinets are specified as interior fixtures, and the documentation follows that route.
- Delivery address and Incoterms you want quoted: EXW, FOB or CIF to a named port. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, so tell us how far you want us to take the shipment.
- Phasing and target on-site date. If the job is staged, give the sequence of rooms or buildings that must arrive first.
- Installation — whether your local contractor will fit the units or you want our installation and after-sales support discussed. This affects how the goods are packed and labelled.
Questions worth asking in the same enquiry
A good RFQ also states what you want back. Ask the supplier to confirm:
- What is included and excluded from the quoted price — worktop, sink, appliances, plinth, trims, spare panels.
- The production sequence: how drawings are issued for approval, when you sign off a layout, and when manufacturing starts.
- How made-to-measure tolerances on site are handled if wall dimensions shift after the units are produced.
- Packaging specification and container loading plan, so your receiving team knows what to expect.
- Warranty terms, spare parts availability and the process for reporting any transit damage.
A short checklist before you press send
- Measured drawings with appliance positions and service points attached.
- Solid panel versus glass stated door by door, with the glass type named.
- Finish references, not just colour names.
- Hardware, internal fittings and lighting decided.
- Quantities, project type, phasing and target date written down.
- Delivery address, port and preferred Incoterms included.
- Your questions about inclusions, approval stages and after-sales listed at the end.
Send that package and a quotation for Aluminum Frame with Solid Panel cabinetry comes back ready to compare, not ready to renegotiate. For the full range of kitchen options, browse our kitchen cabinets and hotel appliances section, or send drawings directly through our contact page.