A seven-metre swim spa is not a product you pick from a shelf. It is a piece of civil and mechanical work that has to fit a slab, a deck, a power supply and a drainage plan before the first jet is ever switched on. That is why two identical Outdoor Swim Spa WS-S07B units can behave very differently once installed — one performs beautifully, the other fights its owner on energy use and water treatment for years.

Before you request a quotation, collect these seven items: the clear internal length and width of the shell; the finished height including any steps; the exact position of the equipment access side; the available electrical supply with phase and breaker rating; the drainage route and overflow point; the number of people who will use it at one time; and whether the unit sits in, on or beside the deck. Send all seven to your supplier at once and you will receive a specification you can actually compare against a competitor's.

1. The site dimensions decide the model before the budget does

The catalog figure for this model is 7000 × 2200 × 1335 mm, and that number describes the shell, not your opening. Measure the finished internal space after tiles, edging and coping are accounted for, then compare it against the shell with a working margin on every side for access, ventilation and maintenance. A unit lowered into a sunken pit with no clearance around the equipment side is a common and expensive mistake: pumps, filters and the control system all need reachable service space.

Height matters just as much as length. Depth options in this range run from roughly 900 mm to over 1600 mm, which changes both the water volume and who can comfortably sit in the spa. A family with young children and a villa project serving older guests rarely want the same depth.

2. How the spa will actually be used

Write down the real usage pattern, not the aspirational one:

  • Exercise swimming. Continuous lap swimming needs a swim current and enough water length to stay in it. Where a swim training system is listed for a configuration, that is what serves this use; where it is not listed, the spa is being bought as a hydrotherapy and leisure unit, and that should be understood at quotation stage rather than discovered on site.
  • Hydrotherapy and relaxation. Jet count and layout drive this. The captured specification for this model shows 48 jets served by three water pumps and a single filter pump, together with a waterfall feature — a configuration built around seating comfort rather than swimming resistance.
  • Shared or commercial use. Hotel villas, resort cottages and club facilities run longer hours with more users, which raises filtration duty and dosing load. Specify that duty at the start so the filtration and sanitisation package is sized for it.

3. Power supply and total connected load

The recorded total power for this configuration is 13.35 kW. That figure is a starting point for the electrical discussion, not a substitute for it. Before any order is placed, confirm with your electrician: available phase (single or three), supply capacity at the distribution board, dedicated circuit and breaker rating, cable route and run length, and the location of the isolator. Where a heat pump is added to the configuration, connected load and running hours rise again, so ask for the figures for the exact option list you are being quoted — not the base unit.

4. Water treatment and lighting package

Ozone is shown as a feature on this model, and UV sterilisation appears among catalog-listed options. Ozone and UV are not interchangeable: they do different jobs, and both reduce how much chemical dosing the owner has to keep up with afterwards. State your maintenance routine honestly in the enquiry — an owner who will test and dose weekly needs a different package from one who wants the shortest possible chore list.

Lighting is worth pinning down early because it affects cable pulls and the control panel layout. The captured specification lists three LED lights plus 26 small LED lights for this configuration. If you want lighting on the waterfall, on the steps or in an adjoining deck zone, add that to the drawing now.

5. Options: what is included and what is quoted separately

Catalog-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so treat the option list as a checklist to confirm item by item. Insulation in particular is cheap at production and awkward to retrofit later, and it directly affects running cost in cooler climates.

6. Site works, delivery and installation sequence

A swim spa arrives as a complete shell with machinery inside it, so the site has to be ready when it lands. The order of work that normally holds together:

  • Slab, pit or deck structure completed and cured, with the bearing surface level and to the agreed dimensions.
  • Drainage route, overflow and any pump-out point installed and tested before the unit is positioned.
  • Electrical containment in place, terminations left for the qualified installer.
  • Access path checked for the delivery route — door widths, turning radii, overhead clearance, crane or forklift access where the unit cannot travel on foot.
  • Commissioning, water balancing and a handover briefing so the owner knows the routine from day one.

This is the same coordination we apply across the rest of an outdoor package. A swim spa specified alongside Swimming Pools and Swim Spas, poolside loungers, a pergola and hard landscaping saves weeks compared with ordering each element from a different vendor on a different schedule.

7. Where the project is being delivered

Freight, packaging and container loading change with the destination, as do import documents and duties. Tell us the delivery city, the receiving conditions on site and who handles local permits at enquiry stage, so logistics arrangements match reality rather than a generic quote.

A quick comparison within the range

If the site survey rules out 7 metres, the range covers shorter and deeper shells with different feature sets. The table below is drawn from catalog entries for three nearby models, and it shows how quickly specification changes with size.

ModelCatalog dimensions (mm)Features shown in the catalog
Outdoor Swim Spa WS-S06B5800 × 2200 × 1250Water jets, LED lighting, Ozone, Waterfall
Outdoor Swim Spa WS-S07B-T7000 × 2200 × 1365Water jets, LED lighting, Ozone, Swim training system
Outdoor Swim Spa WS-S08B7800 × 2200 × 1500Water jets, LED lighting, Ozone, Waterfall

Included equipment and electrical requirements vary by configuration. Confirm the option list for the model you are specifying before ordering.

When a standard shell is not the right answer

Some terraces, atriums and rooftop decks do not accept a rectangular shell at all. Where the space dictates the geometry, our Customizable Shape Outdoor Spa - Personalized Hydrotherapy Pool line covers square, round, oval and curved forms in an acrylic shell with structural reinforcement, sized to the space rather than to a catalogue number.

Enquiry checklist — send this with your first message

  • Site drawing or photographs with measured clear dimensions, including finished height and the equipment access side.
  • Intended use: lap swimming, hydrotherapy, family leisure or commercial duty.
  • Electrical supply details: phase, capacity, distance from the distribution board.
  • Desired options: heat pump, UV sterilisation, sand filtration, insulation, steps, automatic cover.
  • Delivery location, site access conditions and your required programme date.

Send us the site measurements and your usage plan, and we will come back with a configuration, an option list and a delivered price for the exact model that fits — including Outdoor Swim Spa WS-S07B where the space supports it. Email santerson@qq.com or reach us on WhatsApp at +86-13928214007.