An outdoor swim spa is one of the few line items in a villa or resort bill of quantities that carries structural, hydraulic and electrical consequences at once. Write it loosely and the ambiguity comes back later as variation orders. This note walks through how we put Outdoor Swim Spa WS-S08B into a procurement brief, and which fields a buyer or consultant should insist on before the quotation round closes.

Start with the envelope, not the brochure

WS-S08B is catalogued at 7800 × 2200 × 1500 mm. Those three numbers decide whether the unit reaches the slab at all, and they should be transcribed into the brief exactly as written on the product page rather than rounded to a nominal "8 m spa". Three separate drawings depend on them:

  • Structural. The 1500 mm depth sets the excavation or podium cut-out, and the filled weight drives the slab design. Ask the structural engineer for the flooded load per square metre against the exact footprint, not a generic figure.
  • Access. A 7.8 m shell has to travel through a gate, a lift lobby or over a podium edge. Record the delivery route and the largest piece your site can accept before production starts.
  • Plant room. Pumps, filtration and any heat pump need their own volume and ventilation, separate from the shell itself.

Where the setting is a rooftop podium or a terrace with a parapet, note the crane pick and the waterproofing interface in the same brief. Both are easy for two different parties to leave out of their scope, and both stop work on site while the gap is argued out.

The equipment schedule to put in the brief

For WS-S08B, the catalogue lists the following as standard configuration. Reproduce it as a table in your brief so that competing quotations are comparing like with like:

ItemCatalogued value for WS-S08BWhat to confirm before award
Dimensions7800 × 2200 × 1500 mmFinal shell size and the tolerance you will accept on site
Control system2 setsLocation of each control panel and who provides the final position
Water pump4 pcsPurpose of each pump (jets, circulation, feature) and duty/standby arrangement
Filter pump2 pcFiltration media, backwash route and drain connection
Jet total98 pcsWhich zones the jets serve and any accessibility requirement for spa users
LED lighting7 main lights; 46 small LED lightsFixture positions, colour temperature and control grouping
Total power14.6 kWSupply capacity at the switchboard, and whether a heat pump is included in that figure
Features shownWater jets, LED lighting, Ozone, WaterfallWaterfall position, spill edge detail and overflow arrangement

Table: catalogue data for Outdoor Swim Spa WS-S08B as published on the product page. Reproduce it in the brief and require each bidder to confirm every row.

The 14.6 kW figure is a catalogued total for the configuration shown on the product page. Treat it as a starting point for the electrical engineer rather than a final load: heat pump selection, insulation package and local supply voltage all move it. State in the brief that the electrical design is to be based on the as-built equipment schedule, not on this number alone.

State clearly what is optional

The catalogue lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options. Availability and compatibility vary by model, so the brief should carry two columns — "included in base price" and "priced as an option" — and each option should be priced against the specific shell, not against the range in general. A heat pump quoted for a different model in the same family is not a like-for-like comparison.

Insulation and the steps are worth calling out separately. On a podium installation the insulation package bears directly on running cost over the life of the asset, and the step arrangement changes the waterproofed perimeter detail. Both should appear on the drawings, not only in the quotation.

Check WS-S08B against the neighbouring models before you lock the line item

The S08 family overlaps enough that the wrong suffix ends up in a bill of quantities. Two comparisons from the catalogue are usually decisive:

  • Outdoor Swim Spa WS-S08T1 / WS-S08T2 shares the same 7800 × 2200 × 1500 mm envelope as WS-S08B but adds a swim training system, with a different pump and jet count. If the brief calls for lap swimming in place of hydrotherapy seating, that is the line item to compare.
  • Outdoor Swim Spa WS-S08CT sits at 8000 × 2400 × 1420 mm with a wider basin and shallower depth, plus a temperature setting and a swim training system. Where the site constraint is width rather than length, the envelope change matters more than the jet count.

Record in the brief which model was rejected and why. That line protects you at handover if the delivered unit is not the one demonstrated at the sales office.

Interface responsibilities: who does what

Most disputes on a swim spa package are about the boundary between the supplier and the main contractor. Write the split into the brief:

  • Substructure, excavation, waterproofing and the finished surround — normally the contractor's scope.
  • Shell, equipment, plumbing manifolds inside the unit, lighting and controls — normally the supplier's scope.
  • Final electrical connection at the switchboard and any local inspection sign-off — confirm by name in the contract.
  • Lifting, crane hire and site access works — state who carries them, because they are easy for both parties to omit.

As part of our turnkey solutions, the same package can be bundled with the surrounding outdoor furniture — loungers, cabana daybeds and shade structures from the furniture series — so that one team coordinates delivery and installation around the pool deck instead of three.

Logistics: fix the dates, not just the lead time

A 7.8 m shell is an oversize consignment. Our logistics and door-to-door delivery service covers sea, air and rail freight with customs paperwork and container loading planning, but the route still has to be planned against your site. Put four dates in the brief: production completion, ex-factory date, port of arrival and required on-site date. Then state which party handles import clearance and duties at destination.

Ask for the packing list and container arrangement before shipment. For a swim spa this tells you whether the shell ships as one piece or in sections, and it is the document your site supervisor will actually work from.

A short checklist for the brief

  • Model name exactly as published: Outdoor Swim Spa WS-S08B, with the product page linked.
  • Catalogued envelope of 7800 × 2200 × 1500 mm and the flooded-load note to structure.
  • The equipment table above, reproduced in full, with options priced separately.
  • Total power treated as indicative pending the as-built schedule.
  • Named interface split for substructure, waterproofing, electrical connection and lifting.
  • Rejected alternatives recorded (WS-S08T1 / WS-S08T2, WS-S08CT) with reasons.
  • Four logistics dates and the named party for import clearance.

With those fields filled in, a scope change between quotation rounds becomes visible rather than silent. Send us the draft and we will mark up the equipment schedule against the configuration you intend to order.

All dimensions, quantities and power figures above are transcribed from the published catalogue entry for this model and describe the configuration shown on the product page. Confirm included equipment, electrical requirements and optional items for your selected configuration before placing an order.
Send your procurement brief, drawings or bill of quantities to SANTERSON — a China-based furniture and building materials manufacturer working on villa, hospitality and office projects since 2008. We will return a configuration-specific quotation and an equipment schedule you can attach to the contract.