A submittal package is the document set a buyer, architect or contractor reviews before an Outdoor Swim Spa WS-S12-T is released for production. For a swim spa of this length, most disagreements on site trace back to something that was never written down: which pump belongs to which function, what the power figure actually covers, whether the steps are in the crate or quoted separately. The sections below list what a complete WS-S12-T submittal should contain, and what each item answers for the reviewer.

1. Identification sheet and scope statement

Start with one page that leaves no ambiguity about what is being bought. It should carry the model designation WS-S12-T, the product category (swimming pool / outdoor swim spa), the configuration code for the selected option set, and a written list of what is inside the supply and what is deliberately outside it. Site works such as the foundation, deck framing, electrical tail-feed and water supply are normally excluded from the supplier's scope, and that exclusion should be stated rather than assumed.

State the catalogue dimensions on the same page — 11740 × 2200 × 1470 mm for this model — together with a note confirming whether those figures refer to the shell, the outer cabinet face or the footprint including steps and any protruding equipment access panel. Reviewers compare that drawing against site clearances, so the reference point has to be named.

2. Dimensioned drawings

A submittal for a swim spa this size needs at least four drawings: a plan view showing the swim channel and the jet seating zone, two elevations, one cross-section through the shell, and an equipment-location sketch. The drawings should show overall length, width and height, water level relative to the top edge, access openings for service, and the position of the control system.

Include a separate load note: filled weight with people, not just dry weight. A shell at this footprint holds a large volume of water, and the deck or slab beneath it is designed from that number, not from the empty cabinet weight.

3. Equipment schedule

List every item as a line entry with quantity, so nothing is counted twice and nothing is missing. For the WS-S12-T as catalogued, the schedule covers:

  • Control system — 1 set
  • Swim training system — 1 set
  • Water pump — 2 pcs
  • Filter pump — 1 pc
  • Jets — 73 pcs total
  • LED lighting — 1 set plus 50 small LED lights

Beside each line, note which function the item serves. Two water pumps and one filter pump read easily on a purchase order but cause confusion on site when the installer cannot tell which pump feeds the jets and which feeds the swim current. One sentence per pump removes that question.

4. Power and electrical data

The catalogue lists total power for this configuration at 7.65 kW. The submittal should carry that figure with its basis stated: whether it is the summed rated output of the pumps, lighting and control equipment as configured, and whether a heat pump or any other optional item sits outside it. Then add the electrical details an electrician needs — supply voltage and phase, the dedicated circuit requirement, protective device sizing, bonding and equipotential provisions around the water feature, and the location of the isolator.

Where a figure is configuration-dependent, say so on the drawing rather than publishing one number that later changes. The catalogue note for this range is explicit: included equipment and electrical requirements should be confirmed for the selected configuration.

5. Water treatment and sanitation

Ozone is shown as a feature of this model. The submittal should describe the treatment train in order — filtration, then sanitisation, then any supplementary option such as UV sterilization — with the filter type stated. Sand filtration appears in the catalogue's option list, so if it is selected, its media specification and backwash arrangement belong in the package; if it is not selected, the standard filter configuration should be named instead of left blank.

Add a short maintenance note: filter cleaning interval, target water chemistry range for the materials used in the shell, and how the ozone unit is accessed for service. These are practical items that facility staff refer to after handover.

6. Optional accessories — priced, not implied

Catalogue-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Each one should appear in the submittal under one of two headings: included in this supply, or available as an option and not included. Availability and compatibility vary by model, so a supplier confirmation against the specific WS-S12-T configuration is what closes that gap.

Two options change the physical package and therefore belong on the drawings when selected: insulation affects the cabinet build-up and can affect where equipment access panels sit, while steps change the footprint and the approach clearance. A heat pump changes the electrical load and needs its own position, air path and drain provision.

7. Materials and construction description

Describe what the buyer is actually purchasing: shell material and finish, cabinet and frame construction, jet material, trim and edge details, and the finish of the exterior cladding as it will be seen on site. Where a sample or a finish code exists, reference it in the submittal so the installed colour can be checked against an approved reference rather than a photograph.

8. Packaging, delivery and site access

An 11.7-metre shell raises logistics questions that should be answered in the package before order placement: crate dimensions and number of packages, the lifting points, the crane or forklift capacity needed at the delivery point, and whether the delivery vehicle can reach the site. SANTERSON's logistics and door-to-door delivery service covers freight forwarding, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery; the submittal should state which of these are included for this order and where the buyer's responsibility begins.

9. Installation sequence and commissioning record

Include a written installation sequence — setting and levelling, connection of pumps and filtration, electrical termination, filling, functional test of jets and swim system, then handover readings — along with the form that records what was tested and what was handed to the owner. A signed commissioning sheet is the document that ends an argument about whether the unit was working at handover.

SANTERSON's installation and after-sales support covers on-site installation, inspection and snagging, warranty coverage, spare parts and ongoing maintenance. The submittal should name the contact route for post-handover issues and list the wear items a facility is likely to order later.

10. Documentation set to attach

  • Approved specification sheet with model, configuration and option status
  • Dimensioned drawings with load note and access clearances
  • Equipment schedule with quantities and function descriptions
  • Electrical data sheet and single-line connection diagram
  • Water treatment description and maintenance schedule
  • Material and finish references
  • Packaging, lifting and delivery plan
  • Installation sequence and commissioning form

Where the WS-S12-T sits in the range

If the site footprint or budget is still open, the submittal review is the right moment to check alternatives rather than after order placement. The same range includes configurations with different footprints and equipment sets. Outdoor Swim Spa WS-S12 shares the 11740 × 2200 × 1470 mm footprint but is shown without a swim training system, so the choice between the two comes down to how the channel will be used. Outdoor Swim Spa WS-S10-T shortens the shell while keeping the swim system, and Outdoor Swim Spa WS-130CⅢ is catalogued at a larger footprint for sites with more room. Where a standard model does not suit the plan, Customizable Shape Outdoor Spa - Personalized Hydrotherapy Pool covers bespoke geometry. Browse the full Swimming Pools and Swim Spas category for the current line-up, or send the drawings to SANTERSON's team for a configuration check against your layout.

Send the model designation, your site drawing and the option list you want priced, and you will receive a submittal package in the structure above — ready for architect or contractor review before production starts.