A swim spa quotation is rarely a single number. For the Outdoor Swim Spa WS-S04B, the price you are quoted depends on which equipment set is fitted, how the shell is insulated, what site preparation your builder completes, and where the container is delivered. The enquiry below follows the sequence we use to turn a project drawing into a firm quotation.
1. Confirm the base configuration against the catalogue
WS-S04B sits in our configurable outdoor swim and hydrotherapy range. The published catalogue lists the shell at 3900 × 2200 × 1450 mm, with one control system, three water pumps, one filter pump, a jet total of 31 including six water columns, LED lighting (two fixtures plus 28 small LEDs), and a total power figure of 10.35 kW. Features shown on the product page are water jets, LED lighting and ozone.
Treat those figures as the starting point rather than the finished specification. A quotation is only comparable with another supplier's when both sides describe the same equipment list. Send us the catalogue line you are working from and we will confirm item by item what is included in your configuration.
2. Specify the options that change the price
Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each one moves both the equipment schedule and the running profile, so we ask buyers to settle them before order confirmation instead of adding them afterwards.
- Heat pump: state whether year-round water temperature is required, and describe the ambient conditions at the site.
- Water treatment: confirm ozone only, or ozone plus UV sterilisation, and whether sand filtration replaces the standard filter arrangement.
- Insulation and steps: the insulation level follows the climate and the intended usage season; steps are chosen to match the surrounding deck height.
- Control system: confirm which control package you want, since the catalogue lists one set as standard.
Where a swim training system matters to your brief, say so in the enquiry. It is not listed for this model in the catalogue, and we will tell you plainly whether the specification supports it or whether another model in the range is the better fit.
3. Send the site information that determines feasibility
The most common cause of a stalled quotation is missing site data. Include the following so we can price the spa and its services in one pass:
- Dimensions and access: the prepared pad or recess size, plus the route a crate takes from the delivery vehicle to its final position.
- Power supply: available supply capacity and phase at the plant room, so electrical requirements can be checked against the selected configuration.
- Drainage and structure: the drainage point, and confirmation that the slab or deck is engineered for a full-water load.
- Project type and quantity: villa, resort or residential development, with unit counts if you are specifying more than one spa.
4. Choose the scope of supply you want quoted
Some buyers need only the spa as a product; others want it delivered and commissioned as part of a wider fit-out. As a one-stop furniture and building materials supplier, we can quote the swim spa alongside the surrounding outdoor furniture, wall and floor finishes, and interior fixtures for the same project, which removes duplicated coordination between separate vendors.
Our Custom & OEM Service also covers bespoke material finishes and configuration changes where a project requires them. Tell us what has to match an existing design intent — a cladding tone, a deck interface, a control location — and we will confirm feasibility before pricing.
5. Agree the delivery and installation terms
Our Logistics & Door-to-Door Delivery service covers freight forwarding, customs paperwork, packaging and container loading, shipment tracking and delivery to site. Freight terms, duties and transit times vary by destination, so we quote these for your specific port and address rather than publishing a universal figure.
The quotation also states what happens after arrival. Installation & After-sales Support covers on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance. Ask us to itemise which of these apply to your site so the responsibility split with your local contractor is unambiguous in writing.
6. What a complete enquiry looks like
A usable enquiry usually arrives as five blocks: model reference (WS-S04B), the option selections from step 2, site dimensions and power details from step 3, the scope of supply from step 4, and the delivery destination with preferred Incoterms. With those in hand we can return a quotation your quantity surveyor can compare line for line.
Send drawings or photographs if you have them — a deck section or a plant room layout settles most questions in one exchange. If your project needs the spa, outdoor furniture and interior finishes coordinated as one package, our team can work from the design brief and produce a single specification for approval.
To request a quotation for Outdoor Swim Spa WS-S04B, contact SANTERSON with your model reference, option selections and delivery destination. We are a China-based furniture and building materials manufacturer serving villa, hospitality and development projects, and we confirm the included equipment and electrical requirements for your selected configuration before pricing.