A request for quote that only says “one Outdoor Swim Spa WS-PC01A, please” will come back with a price, but rarely with a comparable one. Two suppliers can quote the same model at very different totals because what sits inside the shell — pumps, jets, filtration, heating, control hardware — is configurable, and because freight for a spa-shaped, water-holding unit is anything but standard. If you are specifying a swim spa for a villa terrace, a resort garden or a private courtyard, the quality of your RFQ decides whether you can actually compare offers.

Below is the information we ask buyers to put in writing before we price WS-PC01A, and why each item changes the number you receive.

1. The site conditions, not just the model name

The catalog sheet for this unit lists a footprint of 3000 × 930 mm. That figure tells you the shell size; it does not tell you whether your slab can carry a filled basin, how the unit reaches the site, or where plant and access panels will be reachable after installation. Send us:

  • A plan or sketch of the intended position, with clear dimensions for the opening, doorway, stair or crane route the unit has to travel.
  • Whether the spa is above ground, semi-recessed or fully recessed, and whether you want a deck, steps or an enclosing platform included in the quote.
  • The structural arrangement at that position. If a structural engineer has already specified load allowances for a filled basin, attach it — otherwise say so, because “unknown” is a real answer we need to price around.
  • Drainage and overflow arrangements on site, and where the plant room or equipment bay sits relative to the spa.

These details decide whether the standard configuration fits at all, or whether insulation, access panels and platform work enter the quotation.

2. The equipment set you actually want

The published specification for WS-PC01A shows a control system of 1 set, 2 water pumps, 1 filter pump, 28 jets in total, one main LED light plus 9 small LED lights, and a total power figure of 3.25 kW. Treat that as the reference build, not a fixed package. Options listed across our swim and hydrotherapy range include UV sterilisation, additional water pumps, heat pumps, sand filtration, extra insulation and steps — and availability and compatibility vary by model.

So your RFQ should state plainly:

  • Which of those options are in scope, and which you want quoted as a priced alternative so you can decide later.
  • Whether the swim training system is required. It is not listed for this model in the catalog, so if lap swimming is part of the brief, raise it early and we will confirm what the configuration supports rather than let you assume.
  • Water treatment preference — ozone as shown, plus or minus UV — and who normally maintains the unit on site.
  • Desired water temperature range and how many months a year the spa is used. Heating choice and insulation follow directly from that answer.

3. Power, control and commissioning

Electrical requirements are configuration-dependent, and this is where quotations most often go wrong after the fact. Tell us the supply available at the site — phase, voltage and frequency — the location of the isolator and protection devices, and whether a local electrician or our installation support handles final connection and commissioning. Our service scope covers installation and after-sales support alongside production, so we can price either arrangement; we just need to know which one you are asking about.

4. Quantity, project context and delivery terms

One spa for a private residence and six spas across guest villas are quoted differently, because production slots, packaging and container loading plans change. Include:

  • Quantity, plus any models you are weighing against WS-PC01A. Our wider swimming pool and swim spa range covers different lengths and configurations, and a side-by-side quote is usually more useful than a single line.
  • Required delivery date and the site access window. A spa arriving three weeks early often has nowhere to sit.
  • The delivery address, whether it is a port, a builder's yard or the final plot, and who unloads on arrival.
  • Your preferred Incoterms. We arrange freight forwarding by sea, air and rail with customs paperwork and door-to-door delivery, but import terms, duties and transit time are settled case by case for each destination.

5. What a complete comparison sheet should contain

Once you have quoted two or three suppliers, line the offers up on the same basis. A usable comparison shows the shell and frame build, the pump and jet count actually included, filtration and sanitisation method, heating and insulation specification, control system, warranty terms as written, spares availability, freight and insurance, and installation responsibility. Where one offer looks cheaper, the difference is usually sitting in one of those rows rather than in the shell itself.

If your project also needs the surrounding terrace — outdoor furniture, loungers, screens, pergolas or hard landscaping finishes — it is worth sending that scope at the same time. As a one-stop furniture and building materials supplier we coordinate those items in one production and shipping plan, which removes the usual argument over who is responsible for what on site.

Before you send the RFQ: three checks

  1. Every number in your enquiry is traceable to a drawing or a site measurement, not an estimate from memory.
  2. Options are listed as included or excluded, so nothing important is silently missing from the price.
  3. Electrical supply, drainage and access constraints are stated up front rather than discovered during installation.

Send us those details with your enquiry for WS-PC01A and you will receive a quotation you can put alongside any other offer line by line. Share the drawings and we will confirm the configuration, the included equipment and the electrical requirements before production begins.