A swim spa quotation is only useful when you can compare it, line by line, against the next one. For project buyers specifying an outdoor swim spa for a villa, resort or wellness facility, the risk is not choosing the wrong model on paper — it is approving two proposals that look equivalent and discovering after delivery that they are not. This guide walks through what to ask for in samples and written proposals for the Outdoor Swim Spa WS-130CⅢ-U, so your comparison is based on confirmed scope rather than marketing descriptions.
Start from the site condition, not the brochure
The catalogue entry for WS-130CⅢ-U lists overall dimensions of 11830 × 3000 × 1430 mm. Before you request a proposal, confirm on your own drawings: the clear rectangular footprint including working clearance, the access route from the delivery vehicle to the slab, and whether the unit will sit above grade, partially recessed or fully sunken. A supplier who knows the installation condition can price shell, insulation, steps and plant access correctly; a supplier who does not will quote a default configuration, and the two proposals will never line up.
Send the same three items to every bidder: a dimensioned site plan with the intended orientation, a photograph of the prepared base or the slab detail, and your water and electrical supply information. Identical inputs are what make a fair comparison possible between proposals that would otherwise describe different machines in different words.
What a comparable proposal must state
For this model the catalogue shows one control system, four water pumps, one filter pump, 23 jets in total, five LED lights and a total power figure of 11.85 kW, with water jets, LED lighting and ozone shown as features. Treat these as the baseline to verify, not as automatic inclusions. Every written proposal should carry its own itemised list against the same headings:
- Pumps and jets. Quantity, position and function of each water pump and jet, plus which are for hydrotherapy and which serve circulation.
- Filtration and sanitation. Whether ozone is included as standard and whether UV sterilisation or sand filtration is quoted as an option — both appear in the accessories list for this range, so they must be priced explicitly rather than assumed.
- Heating and insulation. Heat pump size and insulation package are options on this range; an unpriced heat pump is the single most common cause of a proposal that looks cheaper than its competitor.
- Electrical load. The total power figure has to be reconciled with your supply. Ask each bidder to state the connection requirement, protection device and whether local electrical work is inside or outside their scope.
- Controls. What the control system governs, how many zones it manages and what an owner actually operates day to day.
- Cover, steps and access. Whether steps, cover and any platform are included, optional or excluded.
Useful cross-references when comparing proposals
Two cross-references sharpen the picture quickly. First, place the WS-130CⅢ schedule beside the WS-130CⅢ-U schedule you are quoting. Both appear in the catalogue at the same 11830 × 3000 × 1430 mm outline, so the only real difference is equipment: pump count, jet total, LED count and total power all change between the two listings, and one shows a swim training system while the other does not. Reading them side by side is the fastest way to establish whether you are specifying the equipment set the space actually needs, or simply repeating a model code carried over from an earlier drawing.
Second, place the WS-130CⅢ-U schedule against a shorter configuration in the same range, for example the WS-125AⅢ-U, catalogued at 5500 × 2300 × 1350 mm. Line up footprint, jet total, LED count and total power for both. The exercise shows how equipment is distributed across shell length, and lets you test whether the longer unit is justified by the intended use — regular lap swimming and hydrotherapy for several occupants, or occasional spa use by two.
If your design intent is a spa shaped around the terrace rather than a standard rectangle, bring the customizable shape outdoor spa into the same round of enquiries. That product covers square, round, oval and curved shell geometry in an acrylic shell with structural reinforcement. Custom geometry changes both price and production sequence, so it belongs in the comparison from the outset rather than arriving later as a variation.
Samples that expose build quality
A swim spa cannot be sampled whole, but the parts that decide long-term performance can be inspected before you commit. Ask each bidder to send the same set:
- Shell and finish sample. An offcut or cut-away showing the shell laminate in your selected colour, its thickness at the edge, and the finished surface. View it outdoors under site lighting before approving a colour.
- Insulation sample. The actual material and build-up used on the shell side and base — not a written description of it. Insulation quality drives running cost more than any single equipment line, and samples reveal whether the package is a genuine assembly or a thin liner.
- Jet, grille and trim hardware. Loose pieces let you judge finish quality, wall thickness and how fittings read once set into the shell.
- A dated specification sheet for the exact configuration. Attach it to the contract and use it at handover inspection; a generic brochure page is not a specification.
- Packaging and crating detail. Photographs showing how the shell, pumps and loose accessories are packed and secured in the container. For an imported unit this is where transit damage is either designed out or left to chance.
Ask each supplier to label every sample with the model code it belongs to. Samples sent for one variant but quoted against another are a recurring source of confusion at the comparison stage.
Scoring the proposals
Score on confirmed scope rather than headline price. Build a grid with one column per bidder, or one column per variant from the same supplier, and fill it only from what each party has written down:
| Comparison line | What to record for each bidder |
|---|---|
| Equipment actually included | Pumps, jets, filter pump, control system, lighting, ozone — quantity for each, and whether the supplier calls it standard or optional |
| Options priced separately | Heat pump, UV sterilisation, sand filtration, insulation upgrade, steps, cover |
| Site preparation | Base or slab requirements, drainage provisions, and who carries out local electrical and plumbing work |
| Electrical requirement | Stated connection load and protection device, checked against the supply available on site |
| Delivery scope | Freight mode, packaging standard, delivery destination, and whether delivery runs to the site itself |
| Installation and handover | Who installs, what is inspected before sign-off, and what documentation is handed over |
| After-sales | Spare parts availability for pumps, jets and controls; what support covers and what it excludes |
| Lead time and sequence | Production lead time stated by the supplier for this exact configuration, and how delivery fits around site preparation and other trades |
An empty cell is a question you still have. Fill every cell before comparing totals.
Sequencing deserves its own row because it is where swim spa projects most often slip. The shell has to arrive after the base is prepared but before surrounding paving, decking and landscaping are closed in. Ask each bidder to state production lead time for the exact configuration, including any custom geometry or optional equipment, then work backwards against your own programme. A proposal that is slightly dearer but arrives inside your window can cost less overall than a lower bid that forces the paving trade to mobilise twice.
Before you award
Run this final check across every line the comparison has produced:
- Confirm the model designation on the quotation matches the specification sheet line for line, including the variant suffix.
- Confirm every option that affects running cost — heating, insulation, sanitation — is priced and assigned to one party.
- Confirm who is responsible for base preparation, electrical connection and commissioning, in writing.
- Confirm what you receive at handover: as-built specification, wiring detail, spare parts list and operating instructions.
If two proposals still look evenly matched after that, the deciding factor is usually documentation quality rather than price. A supplier who returns an itemised schedule, states options separately and answers questions about equipment in writing will normally run a smoother production and handover process than one whose quotation reads like a product description.
SANTERSON has manufactured furniture and building materials for villa, hospitality and office projects since 2008, supplying swim spas and pools alongside outdoor living, bathroom and interior fit-out products so a project can be procured through one coordinated package. Send us your site plan, the configuration you want and your programme dates, and we will return an itemised proposal with included equipment and options listed separately — the format you can score against any competing bid.