A buyer who sends an enquiry for the Outdoor Swim Spa WS-SP600 and receives only a price usually stops reading there. The same buyer comparing three suppliers the following week keeps the one whose file answers the questions they were about to ask. A product submittal is that file: one package, issued before order confirmation, that lets an architect, contractor or procurement officer check the spa against the drawings, the plant area and the electrical schedule without another round of email.

Below is the set of items we treat as a complete submittal for this model, and what each section has to prove before it is worth signing.

1. The dimensioned shell drawing

The catalogue lists the WS-SP600 at 5900 × 2500 × 1600 mm. That figure tells you whether the unit fits, not how it reaches the position or what has to be built around it. A submittal drawing should show overall length, width and water depth on three faces, plus shell wall thickness, the position of the coping edge, the access panel or equipment compartment, and the footprint of any steps included in the order.

Two details decide whether site preparation goes smoothly. First, the finished water level relative to the deck: a spa set flush into a terrace needs the deck dimensioned against that line, not against the top of the shell. Second, the service opening. A filter pump and control system behind a sealed enclosure is a maintenance problem waiting to happen, so the drawing should show where the access panel sits and how much clearance a technician needs in front of it.

2. The equipment schedule for the exact configuration

This is where most submittals go wrong. The base WS-SP600 specification lists one control system, one swim training system, one filter pump, six jets in total and four LED lights. The WS-SP600-MS variant, at the same 5900 × 2500 × 1600 mm shell, carries an additional water pump and a considerably larger jet package. Same footprint, different plant, different electrical load.

A usable schedule therefore names each item with quantity, manufacturer, model code and rated output, and it matches the configuration you are actually buying. If your specification calls for UV sterilisation, a heat pump, sand filtration, additional insulation or moulded steps, those options have to appear in the schedule as included or priced separately — not as a footnote on another page. Catalogue options do not automatically belong to every shell, so an item offered for one model may not be available for another.

Where a specification line reads "not listed", treat it as an open question rather than an absence, and get confirmation in writing before the electrical and plumbing design is frozen.

3. Electrical data, not just a total power figure

The WS-SP600 specification gives a total connected load of 9.35 kW for the base configuration; the -MS variant is higher at 11.55 kW. A total on its own cannot size a circuit. The submittal should state supply voltage and phase, full-load current per phase, the recommended breaker rating, cable sizing guidance, the location of the local isolator, and the earthing and bonding arrangement for the spa zone.

Add the residual-current or ground-fault protection requirement, and state whether a heat pump sits on the same supply or a separate one. If your project works to its own electrical code, send those requirements with the enquiry; the supplier should confirm which scheduled items meet them rather than assume.

4. Water treatment, filtration and the maintenance regime

Ozone appears as a feature on this model, but ozone is a sanitising aid, not a complete treatment system. The submittal should state what is actually doing the disinfection, what the filter pump and filter media are sized against, and how often the media is expected to be replaced under normal use. If sand filtration is an option rather than standard equipment, say so plainly.

A short maintenance section — filter cleaning interval, water change interval, and the drain-down procedure for a spa left outdoors through a cold season — costs one page and prevents a call in year two. For a hotel pool deck or a residential compound with several water features, this is the section the facilities team actually reads.

5. Structure, insulation and the installation interface

A swim spa filled with water is heavy, and the supporting slab has to be designed for it. The submittal should give the shell material and construction method, the operating weight with the pool full, and any point loads under the base frame. Insulation matters twice over: it holds water temperature, and it changes the built dimensions of the unit.

The installation interface section covers what the site must provide before delivery arrives — slab and plinth dimensions with tolerances, drainage around the enclosure, a level access route for offloading, and crane or forklift requirements if the unit is lifted over a wall. Stating these in the submittal rather than in a separate method statement keeps one document in circulation.

6. Delivery, packaging and after-sales terms

For an imported unit, the package should show how the spa is packed, what counts as damage on arrival, which items ship separately, and who handles customs clearance and the inland leg. Our logistics and door-to-door delivery service covers that leg, with installation and after-sales support behind it, so the submittal can carry delivery terms alongside the technical data instead of leaving them to a later purchase order.

Close the file with warranty terms written out: what is covered, for how long, what voids it, and how a claim is raised. Loose wording here is the most common cause of disputes on outdoor water features.

A short checklist before the submittal goes out

  • Model code on every drawing matches the model being quoted, including any -MS or optional suffix.
  • Every option in your specification appears in the equipment schedule as included or separately priced.
  • Total power is supported by voltage, phase, current and protection data.
  • Access to the filter pump and control system is dimensioned, not assumed.
  • Full operating weight reaches the structural engineer, not only the client.
  • Warranty, delivery terms and maintenance intervals sit in the same document.

If you are specifying from our Swimming Pools and Swim Spas range for a villa terrace, a resort garden or a hotel outdoor deck, send the drawings and the equipment schedule you are working to. We will return a submittal package for the WS-SP600 configuration that answers those six sections rather than a price list.