A swim spa that looks right on the drawing is not automatically a swim spa that can be installed, wired and signed off on site. Before Outdoor Swim Spa WS-PC01A moves from an approved layout into production, the architect, contractor and client team should be working from the same written configuration. The checklist below follows the order in which decisions actually have to be made on a villa or hospitality project.

1. Confirm the model variant, not just the model name

SANTERSON's outdoor swim and hydrotherapy range contains several closely related codes in the same family — WS-PC01, WS-PC01A, WS-PC02 and onward — and a single character changes the specification. The catalogue record for WS-PC01A shows a 3000 × 930 mm footprint with 28 jets, two water pumps, one filter pump and a total power figure of 3.25 kW; the sibling WS-PC01 uses a different depth and a much larger jet count with a higher power draw. If a project document simply says "WS-PC01 series", nobody can tell which electrical load, which shell depth and which seat layout is being procured.

Write the exact model code into the specification sheet, the purchase order and the shop drawing title block, and keep that same code on every subsequent revision.

2. Lock the dimensions against the real slab, not the plan grid

Catalogue dimensions are shell dimensions. Before approval, the team should agree in writing on:

  • The finished footprint to be reserved on site, including clearance for access panels and any steps added to the configuration.
  • Whether the unit sits on a prepared slab, a raised deck or a recessed pit, and who is responsible for that substrate and its drainage.
  • The route from delivery vehicle to final position — door widths, turning space and, for rooftop or terrace installations, lifting method.

A dimension conflict discovered after the shell is cast becomes a concrete problem rather than a drawing problem, which is why this item belongs before sign-off and not in the pre-installation meeting.

3. Match the electrical provision to the selected configuration

The catalogue figure for WS-PC01A is 3.25 kW total power, and that number moves as soon as options are added — a heat pump changes the load profile substantially. The electrical consultant should receive the confirmed configuration sheet before finalising the circuit, protection device and isolator location, and should confirm supply voltage and phase against what will actually be delivered.

Treat the catalogue power figure as a starting point for coordination, not as the value to be written onto an electrical schedule. Local wiring rules and inspection requirements are the responsibility of the project's licensed electrician and should be confirmed with them, not assumed from a product page.

4. Decide what is included and what is an option

The features shown for WS-PC01A are water jets, LED lighting and ozone treatment. The catalogue also lists options that projects frequently assume are standard: control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each line needs an explicit "included" or "excluded" mark on the quotation.

Two items deserve early decisions because they affect other trades. Insulation changes how the unit behaves in a cold-climate terrace and where plant can be located. Steps change the footprint and the access detail. Both are cheaper to resolve at approval than on site.

5. Agree the maintenance and water-treatment access

WS-PC01A carries one filter pump, two water pumps and nine small LED lights alongside its main lighting. That equipment needs a reachable service position, drainage for drain-down, and somewhere to store treatment chemicals. On compact terraces this often drives the decision to recess the unit or build an access hatch — again, a design decision rather than an installation one.

6. Place the order through a defined project route

Once configuration, dimensions and electrical provision are agreed, the remaining approvals are commercial: who books freight and customs clearance, what the delivery term is, and who inspects the goods on arrival. SANTERSON describes itself as a one-stop furniture and building materials supplier, with logistics support covering freight forwarding, customs paperwork, container loading and door-to-door delivery, plus installation and after-sales support. Confirm the specific delivery term, documentation set and inspection window for your project before the purchase order is signed.

Where a swim spa has to fit a non-standard terrace or an irregular pool deck, the range also includes Customizable Shape Outdoor Spa options in square, round, oval and curved layouts with an acrylic shell — useful when a fixed rectangular footprint is the constraint. For larger wellness programmes on resort projects, see the Luxury Outdoor Swim Spa entries with swimming space combined with hydrotherapy jets and water features.

The sign-off list in short

  • Exact model code on specification, drawing and purchase order
  • Reserved footprint with access and delivery route confirmed
  • Electrical load based on the final configuration, reviewed by the project electrician
  • Every option marked included or excluded
  • Service access, drainage and chemical storage resolved on the drawing
  • Delivery term, documentation and arrival inspection agreed in writing

Send the confirmed configuration sheet with your drawings and the coordination meeting becomes a short review instead of a negotiation. Project teams specifying Outdoor Swim Spa WS-PC01A can request the current specification, option list and dimensional drawings for their project before approval.

Specifications quoted above are catalogue values for the WS-PC01A model as listed on the product page; confirm the figures for your selected configuration and confirm all site works, electrical work and compliance requirements with the project's local design team and licensed contractors.