A swim spa on a hotel terrace, a resort pool deck or a residents' amenity deck is not an off-the-shelf purchase. When your bill of quantities names Outdoor Swim Spa WS-PC07ST, the proposal that comes back can look complete and still leave undefined the parts that decide capital cost, programme and running expense. The evaluation below walks through what to verify in a supplier's proposal for this model before you award it.
What the catalogue entry already tells you
The published product page for this model lists a shell of 7000 × 2400 × 1470 mm, one control system, one swim training system, one filter pump, six jets, four LED lights and a total power figure of 6.55 kW. The features named are water jets, LED lighting, ozone and the swim training system. Treat those numbers as the starting point of a conversation, not as the finished specification: they describe what the catalogue shows for the base configuration, and a commercial installation is rarely the base configuration.
Two things in that list deserve attention straight away. First, the water pump is not listed for this model in the captured specifications, so ask which pump, if any, is included in the quotation you hold. Second, total power is stated as a single figure; whether it covers heating, and on what supply, changes both the electrical works package and the operating cost.
Check 1: which variant of the model is quoted
The same family is published in more than one size. Outdoor Swim Spa WS-PC07ST-L is catalogued at 7490 × 2400 × 1470 mm, and Outdoor Swim Spa WS-PC07ST-S keeps the 7000 mm shell but lists an automatic cover option among its features. A proposal that names only "WS-PC07ST" may therefore describe a different footprint or a different cover arrangement, which matters when you are setting out a deck, planning a lift or detailing a balustrade line around the vessel.
Ask for the exact model code on the quotation, the drawing that shows overall dimensions including any steps or cover, and confirmation of whether the automatic cover is included or an option. Then reconcile those dimensions with the structural and waterproofing drawings you already have.
Check 2: what sits outside the unit
Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each of these is a line that either belongs to the supplier's scope or falls to somebody else on site, and ambiguity here is where variation orders come from.
- Heating: is a heat pump included, sized for which water and ambient conditions, and who provides the insulation that keeps its running cost sensible?
- Water treatment: ozone appears in the listed features; ask whether UV sterilisation and sand filtration are part of the package or priced separately, and what the routine consumables are.
- Access: are steps included, and does the proposal show how users get in and out safely on a wet surround?
- Controls: one control system is listed; confirm whether it supports remote or building-management integration if your operations team wants that.
Write the answers into a scope matrix before you compare two suppliers. Two proposals that look identical on price can diverge sharply once filtration, heating and steps are moved between scopes.
Check 3: power, siting and the interfaces you own
The stated total power of 6.55 kW is a figure to hand to your electrical engineer, together with the supply voltage and phase the unit expects for the configuration quoted. Ask the supplier to state the electrical requirement in writing for that configuration rather than leaving it to be inferred.
The rest of the interface work is usually local: a structural support or plinth matched to the shell dimensions, drainage and overflow routing, a waterproofed surround, an access route for delivery and for later pump or filter service, and a plant location that respects noise limits where bedrooms are close by. Confirm in the proposal who provides lifting and rigging, and who carries out commissioning on site.
Check 4: freight, delivery sequence and site readiness
A swim spa arriving by sea needs a delivery window that matches when your deck is actually ready to receive it. SANTERSON's furniture logistics and door-to-door delivery service covers freight forwarding, customs paperwork, packaging and container loading through to door-to-door delivery, which means the supplier can plan the shipment — but you still control the last part: storage on site, lifting equipment and the trades waiting behind it. Agree the delivery sequence in the contract documents, not in an email exchange.
Check 5: after-sales terms for a commercial asset
Equipment failure in guest-facing service happens in front of your customers. The site describes installation and furniture installation and after-sales support, covering on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance. For a commercial project, ask which of those apply to this product line, what the warranty period and exclusions are for pumps, jets, shells and controls, and how spares reach site. Put those answers in writing before award; response-time statements in marketing copy are not contract terms until they appear in your purchase order.
Check 6: does the swim spa belong in a single package?
If the same project also needs loungers, side tables, pergolas and a pool-bar fit-out, sourcing the water feature together with the surrounding outdoor furniture for villas and resorts reduces the number of interfaces you manage. The company positions itself as a one-stop furniture and building materials supplier, running design, custom/OEM production, logistics and installation through one coordination chain. Test that against your own project: fewer suppliers means fewer interface meetings, but price the swim spa package on its own as well, so you know what an alternative source would cost.
A simple scoring sheet before award
| Item to verify | Where the answer should appear |
|---|---|
| Exact model code and overall dimensions, cover included or optional | Quotation line item plus dimensioned drawing |
| Included pumps, jets, filtration, ozone, UV, heating | Equipment schedule with makes and models |
| Power and supply requirement for the quoted configuration | Electrical data sheet countersigned by your engineer |
| Steps, access and surround detailing | Detail drawing reviewed with the landscape or deck contractor |
| Delivery window, lifting, storage, commissioning responsibility | Contract delivery programme |
| Warranty period, exclusions, spares route, maintenance terms | Purchase order terms and conditions |
If a proposal cannot answer all six rows in writing, it is not yet comparable with a competing bid.
To check configuration options, dimensions and included equipment for this model and the wider swimming pools and swim spas range, request a specification sheet for your project and confirm every item above against it.