Outdoor Swim Spa WS-130CⅭ is one of the longest shell sizes in our configurable swim and hydrotherapy range, and it is rarely ordered twice in exactly the same form. The quotation you receive therefore depends on far more than the model code. This guide sets out what we need from you to price a WS-130CⅭ properly, so the number in the offer matches the unit that arrives on site.

Start With the Site, Not the Specification

Before we quote equipment, we need to know where the spa will sit. A terrace, a sunken patio, a rooftop deck and a garden platform all raise different questions about access, drainage, structural support and how the cabinet will be clad. Send us a plan or a few photographs of the intended location with approximate clear dimensions, including the route from the delivery vehicle to that spot; an 11830 mm shell needs a realistic path to reach its position.

Tell us how the spa will be used as well. Daily lap training for one household, guest leisure at a boutique villa, or a wellness area in a resort changes which jet layout, seating arrangement and control package make sense. If the spa is part of a wider fit-out, our Turnkey Interior Project Solutions team can coordinate it alongside outdoor furniture, wall finishes and flooring instead of treating it as an isolated purchase.

Confirm the Base Configuration You Are Pricing

The Outdoor Swim Spa WS-130CⅭ is listed in our catalogue with the following baseline. Use it as a starting point, and mark up what you want changed.

ModelWS-130CⅭ
Catalogue dimensions11830 × 3000 × 1430 mm
Control system1 set
Swim training system1 set
Water pump1 pc
Filter pump1 pc
Jets20 pcs total
LED lighting7 pcs
Total power (catalogue figure)10.85 kW
Features shownWater jets, LED lighting, Ozone, Swim training system

These figures come from the catalogue entry for this model. They are not a substitute for the confirmed specification sheet we issue with your quotation, and they should not be used to size an electrical supply before that sheet is in hand.

Tell Us Which Options Belong in Your Quote

Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so we confirm each item against the build you are ordering rather than assuming it fits. When you send an enquiry, state clearly for each option whether you want it included, excluded or left for a later phase.

Two decisions matter most to the final price and should be settled early:

  • Heating and insulation. A heat pump and an insulated shell change both the equipment list and the running load. Tell us the climate the spa sits in and the water temperature you expect to hold through the year.
  • Filtration and sanitisation. Ozone is shown as a standard feature on this model; sand filtration and UV sterilisation are listed options. Say which maintenance routine your site team can realistically keep to.

If the shape or size we offer does not suit your space, we also build spas to a customised shape, including square, round, oval and curved layouts, on our Customizable Shape Outdoor Spa programme. Send the drawing and we will quote from that instead.

Compare Against Neighbouring Models Before You Commit

The 130 series shares jet count and total power across several shell lengths, so a shorter model may serve the same brief at lower cost. WS-130AⅭ is listed at 8000 × 3000 × 1400 mm and WS-130BⅭ at 9950 × 3000 × 1430 mm, both with the swim training system shown. If your site cannot take an 11.8 m run, that comparison is worth making before the quotation is drawn up.

The variant letter also changes content, not just length: WS-130CⅭ-U is listed with a different pump and jet count from WS-130CⅭ, and its swim training system is not shown in the captured specification. Quote the exact code you intend to buy, and we will confirm the included equipment for that code in writing.

Send the Practical Details That Affect Price

  • Electrical supply on site. Voltage, phase and available capacity, plus who supplies the connection up to the spa. The catalogue power figure is a starting point for this conversation, not an order.
  • Delivery terms. Destination address, port or door, and any access restrictions. We arrange freight by sea, air and rail with door-to-door delivery, so the more precise the site details, the fewer surprises in the landed cost.
  • Cranage and placement. Whether a crane, forklift or manual route is needed to position the shell.
  • Quantity and programme. A single villa unit and a multi-unit resort phase are quoted differently, and production slots follow the programme you give us.
  • Point of contact. The person who signs off drawings, so approvals do not stall mid-production.

What You Receive Back

A complete enquiry produces a specification sheet for the exact model and option set you requested, an itemised quotation, and the delivery basis we are quoting on. Anything left unstated at the enquiry stage tends to reappear later as a variation, which is why this checklist exists.

Note: Do not size electrical work, structural supports or cladding from catalogue figures alone. Wait for the confirmed specification sheet for your build, and have local contractors verify anything governed by site conditions or local regulations.

Next Step

Send us the model code WS-130CⅭ, your site drawings or photographs, the option list you want priced and your delivery destination, and we will return a specification sheet and itemised quotation for that configuration. Browse the wider Swimming Pools and Swim Spas range first if you are still weighing sizes.