When a project team decides to use MCM flexible travertine stone veneer instead of quarried travertine, the enquiry usually starts with a photo of a feature wall and one question: how much do I need? That is the wrong first question. The information that actually determines the specification, the panel layout, the substrate build-up and the freight plan is a set of measurements and project inputs you can collect on site in an afternoon. This guide lists exactly what to send us so that our team can return a workable cladding proposal rather than a generic quotation.
Why flexible stone veneer changes the information you need
Rigid stone slabs are specified from a sample and a total square-metre figure. A bendable soft stone sheet behaves differently: it is thin, light and can be wrapped around curved walls, arches, columns and other special-shaped surfaces that rigid panels cannot cover. Because the material follows the substrate, the quality of the finished wall depends as much on what is behind the cladding as on the surface texture itself. That means we need to know about the substrate, the curvature and the exposure conditions before we can recommend a colour, a cutting layout or an installation method.
Our flexible travertine sheet reproduces the natural hole texture of original travertine stone, and it is used for interior wall decoration, exterior facade cladding, hotel, restaurant, villa, shopping mall and office renovation, including curved-surface work. Its practical advantages — light weight, flexibility on curved walls, weather resistance with anti-freezing and anti-crack properties for outdoor use, and on-site cutting without heavy equipment — are the same advantages that make accurate project data worth collecting.
Input 1: The surface geometry, not just the area
Send us dimensions per wall or per elevation, not one total figure for the whole building. For each run we want length and height, plus a note of anything that interrupts the surface: openings, reveals, sockets, skirtings, cornices, expansion joints and changes of plane.
| Surface type | What to measure and record |
|---|---|
| Flat interior wall | Length × height per elevation; number and size of openings; whether corners are square or feature mitred. |
| Curved wall, arch or column | The radius of the curve, the direction of the bend (concave or convex), the width and the developed height. A simple sketch with the radius marked is enough to start. |
| External facade | Elevation dimensions, floor level, exposure to sun and rain, and the detail at the top edge where water can enter behind the cladding. |
| Renovation over an existing finish | The existing surface material, how flat it is, and whether it will be removed or overlaid. |
| Partial feature areas | Headlines such as a reception backdrop, bar front, fireplace surround or niche — measure the finished box dimensions of each. |
For curved work, the radius matters because it decides whether the sheet can be applied in one piece and how it is handled on site. A gentle curve on a reception desk front is a very different job from wrapping a tight column, and both are common requests for this material.
Input 2: The substrate you will fix to
Flexible stone veneer is bonded to a solid, flat base. Tell us what that base will be — cement render, gypsum board, cement board, brick or block — and whether it is already built or still being designed. On interior work the panel can be fixed directly to a cement base or to gypsum board with tile adhesive, which is worth planning early: specifying the cladding before the wall lining is closed up avoids re-making the substrate to a tolerance it does not need.
Also confirm the flatness you will hand over. Because the sheet is thin, a wavy or patched substrate shows through the finished face. Where a wall is being renovated, send photographs of the existing condition; we would rather see a poor surface now than after the sheets have arrived.
Input 3: Interior or exterior exposure
The same material serves both, but the specification differs. For external facades we need to know the climate and the orientation of the wall, because this product is chosen for outdoor use on the strength of its weather resistance and its anti-freezing and anti-crack behaviour. For interiors we need to know the room type — hotel guestroom, lobby, restaurant, spa, shopping mall or office — since wear, cleaning regime and colour choice follow from that.
Input 4: Colour, texture and sample selection
Travertine reads very differently across a warm cream, a grey and a walnut-toned face, and photographs cannot be trusted for colour matching on a project. We keep multiple colours in stock and supply free samples, so the fastest route is to tell us the reference you are working from — an existing stone floor or countertop, a finish on another wall, or a designer's mood board — and we will send the closest matching samples.
Where a project needs more than one product family in the same palette, it is worth specifying them together. The MCM flexible rammed earth panel gives an earthy, matte rammed-earth face for villas, homestays and restaurants, while the flexible rock stone wall panel restores a rough natural-rock texture. Both are thin and flexible and both can be rolled for transport, so they travel in the same container and are fixed by the same trade.
Input 5: Quantities, cutting waste and phasing
Give us quantities by elevation rather than one grand total, and state whether the work is a single phase or several. On-site cutting is simple with this material — sheets are cut to size on site without heavy equipment — but curved and special-shaped surfaces generate more offcut than flat runs, so layout drawings matter. We use your per-elevation measurements to work out a panel layout and a realistic allowance before quoting.
Input 6: Programme, destination and coordination
Finally, tell us when the wall needs to be finished, where the goods are going, and who is installing. Flexible stone cladding is usually part of a fit-out sequence that also includes flooring, joinery, lighting and wall finishes; when those packages come from one supplier, sequencing and site coordination get simpler. Turnkey villa furnishing and interior fit-out is how we normally handle this: consultation, design and planning, production, logistics, installation and after-sales as one coordinated scope, with door-to-door delivery arranged by our team.
A short form to send with your enquiry
- Project name, location and the type of building (hotel, villa, restaurant, retail, office).
- Per-elevation dimensions, plus radius and direction for every curve.
- Interior or exterior, and the exposure conditions of each wall.
- Substrate material and how flat it will be when handed over.
- Colour reference, and whether samples are needed before you decide.
- Quantities per elevation, installation phase dates and the destination port or site address.
- Photographs of the existing wall for renovation work, and any detail drawings you already have.
Send those seven items and we can come back with a colour recommendation, a panel layout, an installation note for your contractor and a quotation that reflects the real job. If you are still weighing flexible stone against rigid cladding, start with samples: hold them against the wall in site lighting and bend one around a former on site.
Tell us your elevations, curves and exposure, and we will specify the right colour and quantity of MCM flexible travertine stone veneer for your wall — samples available before you commit.
Send your measurements