A swim spa that doubles as a lap pool and a hydrotherapy station is one of the easier outdoor decisions to get wrong, because the shell dimensions are only part of the picture. Before we quote Outdoor Swim Spa WS-PC07ST-S for a villa terrace, a resort deck or a private residence, our project team asks buyers for a short set of measurements and inputs. This article lists exactly what we need, why each item changes the specification, and how the information comes back to you as a workable proposal.

Start With the Clear Opening, Not the Spa Shell

The catalogue entry for this model lists an overall shell of 7000 × 2400 × 1470 mm. Those are the unit's outer numbers, and they are not the same thing as the space you need on site. Send us the clear length, width and height of the intended position — measured between finished surfaces, including any parapet, planter, handrail or pergola post that sits inside the area. Then add the access route: gate width, turning radius at corners, stair or lift dimensions, and the headroom on the delivery path. A shell that fits the pad but cannot reach it is the most common avoidable problem on rooftop and courtyard installations.

Tell us how the unit will sit as well. Above-ground on a deck, semi-recessed into a platform, or fully recessed with an access hatch changes the required clearances around the equipment compartment and the service reach for the filter pump and control system. We need to know which of those three you are planning before we finalise the drawing.

Structural and Ground Conditions

A filled spa is a heavy point load, so the supporting structure has to be designed for it rather than checked afterwards. Please provide:

  • Slab or deck build-up — material, thickness and reinforcement where known, or the structural engineer's drawings if the spa sits on a suspended slab, balcony or roof deck.
  • Finished floor level around the spa, plus the intended water level relative to that surface.
  • Drainage arrangement — existing gullies, channel drains, overflow route and where discharged water is allowed to go.
  • Waterproofing method for the recess or platform, and who is responsible for applying it.
  • Wind exposure and any screening on an elevated terrace, which affects cover selection and handrail detailing.
If a structural engineer is already on your team, copy them into the enquiry. We design the spa platform detail around their load figures rather than asking them to accommodate ours after production has started.

Power, Water and Controls

The captured specification for this model shows a total connected power of 6.55 kW. That figure is the starting point for the electrical discussion, not the end of it. Send us the available supply at the property — phase, voltage and frequency — the distance from the distribution board to the spa, and the circuit protection your electrician intends to provide. Electrical requirements are confirmed for the selected configuration together with our engineering team, because options added later change the load.

For water, tell us the fill source, whether a softener or dosing system is planned, and how the unit will be drained for maintenance. The catalogue lists one filter pump, one control system and one swim training system for this model, with six jets and four LED lights. If your brief calls for something different — more seating position, a different jet layout, a longer swim channel — say so at this stage and we will point you to the variant that matches instead of forcing an unsuitable unit.

What Is Included and What Is Optional

The features shown for WS-PC07ST-S are water jets, LED lighting, ozone, a swim training system and an automatic cover option. Catalogue-listed options across this configurable outdoor swim and hydrotherapy range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so we confirm each item against the configuration you select before order entry.

Two of those choices deserve early decisions rather than late ones. Heat pump selection determines running cost and how quickly the water recovers between sessions, and it depends on the ambient conditions at your site. Insulation matters most for year-round use in cooler climates and affects both energy demand and the platform detail. Tell us the intended season of use and the local climate, and we will recommend a configuration rather than leaving it to chance.

ItemCatalogue value for WS-PC07ST-S
ModelWS-PC07ST-S
Catalogue dimensions7000 × 2400 × 1470 mm
Control system1 set
Swim training system1 set
Filter pump1 pc
Jet total6 pcs
LED lights4
Total power6.55 kW

The water pump is not listed for this model in the captured specification, so we confirm it as part of the configuration rather than assuming it. Please treat every figure above as a catalogue value to be verified against your selected build.

How the Spa Fits the Wider Outdoor Package

Very few swim spas are ordered on their own. On villa and resort projects they arrive alongside outdoor furniture for villas and resorts — loungers, dining sets, pergolas and screens — plus the paving, cladding and lighting that frame the deck. When we see that wider scope early, we coordinate the spa with the rest of the order so the materials, finishes and delivery windows line up instead of arriving in three unrelated shipments.

As a China-based manufacturer and one-stop furniture and building materials supplier, we handle that coordination through one project file: design consultation and space planning, material selection and product specification, manufacturing and quality control, project management and site coordination, then installation and handover. Browse the full swimming pools and swim spas range to see how this model sits alongside longer channels and larger jet counts if your brief needs a different balance.

Site Access, Freight and Installation

Because the shell arrives as a large unit, the delivery route is part of the specification. We need site photos of the access path, the street or lane leading to it, and any obstruction such as overhead cables, removable fencing or a narrow gate that has to be taken out and reinstated. That information lets our logistics team plan freight by sea, air or rail alongside the packaging and container loading, and lets your builder prepare the ground before the truck arrives.

Tell us who is doing what on site. We provide installation support and after-sales service, including inspection and snag lists, but concrete, waterproofing, electrical termination and deck finishing are usually local trades. A written split of responsibilities agreed before production prevents a finished deck from being reopened.

A Simple Brief Template

Copy this list into your enquiry and the specification conversation moves quickly:

  • Project type and location — villa, resort, private residence or development.
  • Clear site dimensions and access route, with photos and measurements.
  • Mounting intent: above-ground, semi-recessed or fully recessed.
  • Structural information and the engineer's load figures.
  • Supply details (phase, voltage, frequency) and distance to the distribution board.
  • Intended season of use and local climate, which drives heat pump and insulation choices.
  • Which catalogue options you want quoted: cover, UV sterilisation, sand filtration, steps, extra lighting.
  • Target handover date, so production and freight can be scheduled backwards from it.

Send the Numbers, Get a Specification Back

If you have those measurements and inputs ready, send them to us with your project drawings and we will return a specification for Outdoor Swim Spa WS-PC07ST-S matched to your site — including the options that genuinely suit your climate and usage, and a clear split of on-site responsibilities. Enquiries through our contact page receive a reply from the project team.