A request for quote that only names a model number and a quantity usually comes back with a price and nothing else useful. By the time the basin arrives, the trap position is wrong, the wall frame cannot carry the load, or the tap hole does not match the faucet already specified. Below is the checklist we use when a buyer asks us to quote the Wall Hung Ceramic Basin 1051B, a curved minimalist wall-mounted basin in the 1051 sanitary suite. Send these items and you will get one comparable price with the accessories, packing and freight decisions already resolved.

Start with the project context, not the product

Ceramics are quoted as part of a package. Tell us the project type (villa, apartment block, boutique hotel, guesthouse), the number of bathrooms per room type, and the country of delivery. A boutique hotel in a city centre and a villa development with repeated identical bathroom layouts need different spares, different packing, and different carton sizes for the site lift or staircase. If your wall-hung WC, stand basin and one-piece toilet are also from the 1051 range — Wall Hung Toilet 1051W, Freestanding Pedestal Basin 1051S or Washdown One Piece Toilet 1051A — say so. Quoting the suite together keeps glaze batch, design language and shipping consolidated.

The technical items that must appear in your RFQ

Item to stateWhy it changes the quote
Quantity and split by bathroom typeDetermines carton count, mixed-container loading and whether spare units are worth including for future maintenance.
Waste outlet and trap type (P-trap wall drain or S-trap floor drain)Wall-hung basins sit over a wall outlet in most layouts; the wrong waste orientation means the basin cannot be mounted at the designed height.
Drain centre and rough-in dimensions from your plumbing drawingConfirms the basin can be fixed to the finished wall line with the trap behind it. Our product page lists 1051B at 400×380×450 mm, but rough-in still has to be checked against your drawings and the current technical data sheet.
Wall construction: stud frame with carrier, or solid masonryA wall-hung basin is secured by its back panel. Frame walls need a properly fixed carrier and noggins at the mounting height; masonry needs the correct anchor set. Both affect what accessories we pack.
Tap hole and faucet specification1051B has a single tap hole reserved for one lever faucet. Deck-mounted mixers with an integrated pop-up waste need the correct waste set and rod length.
Waste set: pop-up with rod, or free-flowRarely included by default. Naming it in the RFQ avoids a second shipment of small parts.
Colour and glaze finishStandard white glossy vitreous ceramic with a dense glaze is what we produce as standard; other finishes move the price and the lead time.
Custom or OEM requirementsPrivate labelling, carton printing and bespoke packaging are quoted separately from the unit price. See our Custom & OEM Service.
Destination port or site address, and IncotermsBasins are fragile freight. Door-to-door delivery to a villa site and CIF to a port need different packing grades and different insurance.
Required arrival window and phasingCeramics usually land late in a fit-out programme. Phased deliveries are possible but change container planning.

What our quotation returns

Once the above is clear, a single quotation covers the unit price by quantity band, the waste and mounting accessories included in each carton, packing specification and carton dimensions, container loading plan, freight option under your chosen Incoterms, and what is excluded. We also confirm which items ship with the basin and which have to be sourced locally — sealant, bottle traps, tapware and wall carriers are typically local purchases.

Checklist before you send

  • Model and finish named: Wall Hung Ceramic Basin 1051B, white glossy.
  • Quantity plus spares for the maintenance period.
  • Plumbing drawing with drain centre, outlet type and mounting height.
  • Wall build-up and carrier or anchor requirement.
  • Faucet type, tap hole confirmation and waste set choice.
  • Suite items quoted together (1051W, 1051S, 1051A) where relevant.
  • Destination, Incoterms, phasing and required arrival window.
  • Labelling, carton printing or other OEM requests written out.

Sizes and rough-in figures on product pages are indicative. Confirm them against the current technical data sheet for your order before any wall is closed up.

Send your drawings, quantities and destination to our team and we will return a consolidated quotation covering the basin, accessories, packing and freight. Browse the wider range in Bathroom Sanitary Fixtures, or start an enquiry through our Turnkey Solutions page if ceramics are one line in a larger fit-out package.