Integrated lighting only works when somebody has already decided where the cable runs, who terminates it and what happens if a driver fails after handover. That decision belongs in an installation plan agreed before the joinery is made, not in a last-minute exchange between the site electrician and the joinery supplier. This article sets out what that plan should contain for Santerson Integrated Lighting Systems, the lighting built into our made-to-measure modular shelving systems, so the drawing you approve is the wall you get on site.
Loose fittings are forgiving. A pendant can be connected almost anywhere there is a ceiling outlet, and if the position is wrong you move the outlet. Integrated lighting is not forgiving in the same way, because the light source is fixed inside a manufactured component: the strip sits in a machined channel, the driver sits in a designated pocket, and the cable route has to exist before the panel is closed. Once the carcass is assembled and the finish applied, moving a light means changing the furniture.
That is why we ask for an installation plan rather than a bare purchase order. The plan is where product information, site conditions and the responsibilities of each trade meet. Everything below should be settled before production starts on a made-to-measure run.
What the plan should cover
1. Room-by-room schedule of illuminated elements
Start with a list rather than a picture. For every illuminated element in the project, record the room or zone, the item it belongs to and what is actually being lit. A shelving run usually carries more than one lighting role: light on the shelf fronts for display, a wash down the back panel, and task light wherever someone will genuinely work.
| Field | What to record |
|---|---|
| Zone / room reference | Match the drawing number so the electrician, the site supervisor and our production team are reading the same reference. |
| Item and elevation | Which bay, which elevation, which shelf line. A room name alone is not enough once a wall system has several bays. |
| Lighting role | Display, ambient wash, task or accent. The role decides placement far more than the fitting type does. |
| Switch or control point | Where the user stands when they turn it on, and whether that switch already exists in the electrical drawing. |
| Trigger for change | If the layout changes later, note which decisions have to be revisited: cable routes, driver access, finish selection. |
2. Dimensions and levels agreed with the site drawing
Integrated lighting inherits every measurement error in the joinery. The plan should carry the same setting-out dimensions as the millwork drawing: finished floor level, ceiling level, the datum line the wall system is set out from, and the depth of any rebate or service chase behind it. Where a modular system meets a plasterboard wall, record who sets out that wall and to what tolerance.
Our modular systems are made to project-specific dimensions and finish options, so we work from your site dimensions rather than a standard catalogue size. That flexibility is the reason the plan matters: a dimension that moves after production has started affects the machined channel the light sits in, not just a bracket.
3. Electrical specification confirmed per configuration
This is the section most often left blank, and it is the one that causes the most expensive rework. The electrical specification for an integrated lighting scheme depends on the configuration: what the system is wired for follows from the layout you chose, the number of illuminated runs and how those runs are grouped.
For each illuminated element, the plan should record:
- Input and output voltage as confirmed for the selected configuration
- Driver or transformer type, wattage, and where it is mounted
- Whether dimming is required, and which control system it must work with
- Cable type and route from the site supply to the first connection point
- Which party supplies and installs each part of that run, normally split between our factory work and your local electrician
- The inspection and test regime your project or jurisdiction requires, confirmed with your electrical contractor
We confirm electrical specifications and compatibility for the chosen configuration before production; we do not assume a specification carries across from one project to the next. Your local electrician remains responsible for final connection and compliance on site.
4. Driver location and service access
Every driver needs ventilation and a route to it. Put a driver in a sealed box behind a fixed panel and you have designed a fitting nobody can maintain. In the plan, mark each driver position on the elevation, note whether it sits inside the unit or in an adjacent service zone, and confirm that a person can reach it by hand once the unit is installed.
Where access is genuinely constrained, such as a full-height system fixed up to a soffit, say so in the plan and record the alternative: a removable access panel, relocation of the driver into the ceiling void, or a design change. Settling that on paper costs nothing; settling it after installation means losing a wall.
5. Sequencing against other trades
Integrated lighting sits at the junction of three trades: electrical first fix, joinery installation, and finishes. The plan should state, in order, who does what and when:
- Electrical first fix — cable routes and connection points created to the setting-out drawing
- First fix inspection — verified before walls are closed or panels are fixed
- Delivery and storage of the joinery components on site, protected from moisture and impact
- Unit installation, with lighting channels kept clear of adhesive, paint and filler
- Connection, commissioning and functional test of every illuminated element
- Snag list and correction, then handover with the as-built lighting record attached
Where a project already has an installer engaged, their programme governs these dates. Where it does not, our Furniture Installation and After-sales Support service covers on-site installation, inspection and snagging as part of the package.
6. Delivery and receipt conditions
An installation plan that ignores logistics has a hole in it. Record the delivery window, the receiving party, the access route from the vehicle to the floor — lift dimensions, stair widths, corridor turns — and the inspection you will carry out on receipt. Panels and pre-fitted lighting channels are the components most often damaged over that last stretch of site, and damage discovered after installation becomes a project problem rather than a delivery claim.
For international projects we arrange freight by sea, air or rail with customs paperwork and door-to-door delivery under our Furniture Logistics and Door-to-door Delivery service. Import terms, duties and delivery scope are confirmed project by project in writing, not assumed.
7. Handover record and after-sales route
Close the plan with what the client receives at handover: an as-built lighting schedule showing each element, its driver location and its control point, together with the specification sheet for the configuration actually installed rather than the one originally quoted. That document is what turns a later fault call into a short conversation instead of a site visit to discover what was built.
Warranty terms, response times and exclusions are set out per project rather than stated as a blanket promise here; we confirm them for your scope before order confirmation, along with spare parts availability for the specific fittings used.
Where integrated lighting sits in our ranges
If your scheme runs lighting through more than one product family, plan them together so drivers and control points are not duplicated across trades:
- Santerson Integrated Lighting Systems — lighting integrated into made-to-measure modular shelving for residential wall systems
- Santerson Integrated Cabinet Lighting — cabinet lighting for bathroom joinery, specified to the individual design
- Santerson Modular System with Lighting (Living System) — living-room modular systems with lighting built into the configuration
- Santerson Integrated LED Media Units — media walls and TV units with integrated LED lighting
- Santerson Backlit Feature Walls — backlit feature wall panels, where the light source is behind the finish rather than in a channel
Each of these is configurable in layout, dimensions, material and finish, and each has its own electrical detail to confirm for the configuration you select. Treat them as separate line items in the plan even when they sit on the same wall.
Before you approve the plan: a short checklist
If the plan answers these questions, it is ready to work from:
- Is every illuminated element listed against a room reference and an elevation?
- Do the setting-out dimensions match the current site drawing, including datum and floor levels?
- Is the electrical specification confirmed for this configuration, with the supply-and-install split named?
- Can every driver be reached by hand after installation?
- Are the trade dates sequenced, with first fix inspected before closure?
- Is the receiving party and access route for delivery recorded?
- Will an as-built lighting schedule be handed over at completion?
Send us your drawings and we will mark the lighting channels, driver positions and connection points against them before production begins. As a one-stop furniture and building materials supplier, SANTERSON handles design coordination, made-to-measure production, delivery and installation support under one scope, so the lighting plan has a single party accountable for it from drawing to handover. Our team will return a lighting schedule you can issue directly to your electrician.