A double roof hardtop aluminum gazebo with privacy curtains is one of the easier outdoor structures to specify and one of the easiest to mis-order. The shelter itself looks simple on a drawing, yet the package behind it carries seating, tables, curtains, flooring, lighting and sometimes an adjacent swing or daybed. When those items are counted separately by different suppliers, projects end up with a pavilion that has no table under it, curtains in the wrong drop length, or dining chairs that do not fit the clear floor area. This guide sets out how to work out quantities and coordinate the related products around this gazebo type for resort, villa and club projects.

Start From Use, Not From a Unit Count

Before any number goes on a purchase list, decide what each pavilion is meant to do. The same structure serves very different roles in an outdoor restaurant, a villa courtyard and a hotel leisure lawn, and the role drives the quantity of everything else.

  • Outdoor dining pavilion. Quantity is set by covers per seating round. Count the chairs and table size first, then confirm the gazebo footprint actually clears the chair backs plus circulation behind them.
  • Private lounge or cabana point. Quantity is set by plot count on the landscape plan. Each unit needs its own curtain set and its own low table; seating here is usually a sofa or daybed rather than a dining group.
  • Poolside or beach-club anchor. Quantity follows guest flow, and pairing with aluminum cabana daybeds with canopy and curtains is common. Keep the curtain colour and frame finish consistent between the two product families so the zone reads as one design.
  • Garden leisure cluster. Where a harder-top polycarbonate hardtop outdoor swing bench sits near the pavilion, order both from one production batch so finishes match under sunlight.

How to Count the Gazebos Themselves

Three site conditions usually decide the unit count, and each has a practical way of checking it before you commit to an order.

1. Clear floor area versus seating layout

Draw the intended furniture group to scale inside the pavilion footprint. A dining round needs room for the chair to be pulled back with a person seated, and a service aisle if staff will carry trays through. If the drawing fails at this stage, the answer is more units spread across the site rather than one oversized custom span.

2. Slab or pad count

Each gazebo normally sits on its own prepared base. The number of bases your civil contractor pours should equal the number of structures plus any approved spares. Counting structures after the slabs are poured is where extra units become expensive.

3. Spares and phased phases

For hospitality sites, order a small buffer of complete units when pavilions sit in guest-facing positions with high wear, and when a later phase will repeat the same layout. Ordering the second phase against the same specification keeps frame finish and curtain fabric consistent; re-ordering months later against a revised catalogue is where mismatch appears.

Quantity Breakdown: What One Pavilion Actually Carries

Write each line item as "per pavilion" and then multiply by the unit count. The table below reflects how this product family is typically packaged, including the attached privacy curtains mentioned in the product description.

ItemCounting basisCommon ordering mistake
Gazebo structure, roof and frame1 set per pavilion positionOrdering a span that the seating layout does not fit
Privacy curtain setOrdered with the structure, sized to that structure's height and perimeterCurtains ordered later as an accessory in a generic drop length
Dining or lounge seatingChairs per table, plus one spare chair per ten for hospitalityMixing chair styles across pavilions in the same zone
Table1 per pavilion, sized from clear floor areaTabletop too large once curtains are drawn closed
Outdoor rug or flooring finishInterior dimension of the pavilion footprintFlooring measured before the structure size is fixed
LightingPer pavilion, coordinated with the site lighting planSurface-mounted fittings added after the frame is produced
Cushions and soft goodsSeat count plus 10–15% spares for guest-facing sitesNo spares, so faded units stand out immediately
Fixings and base interfacePer pavilion, matched to the prepared base typeBase detail decided after the structure arrives on site

Coordinating the Products Around the Gazebo

Coordination means three things line up: dimension, finish and delivery sequence. Handle them as one package rather than as separate purchase orders.

  • Dimension. Fix the pavilion size first, then size the table, seating and flooring to it. Where dimensions change, the curtain set changes with it, because curtains are made to that structure's height and perimeter.
  • Finish. Frame finish on the gazebo should be read against the frame finish of adjacent outdoor items — dining frames, swing benches, daybeds and aluminum outdoor swing benches with teak armrest. A powder-coat sample on the actual frame profile is worth requesting, because the same colour name reads differently on a wide post than on a slim chair leg.
  • Curtain and textile palette. Curtain colour should be agreed against both the frame finish and the cushion fabric of the seating underneath. For projects that also use louver-roof structures with side screens, keep the textile family consistent so open and enclosed zones look related.
  • Sequence. Structures arrive before seating on most sites, but the base must exist before the structure can be set. Confirm in writing which party prepares the base, who sets the structure and who installs curtains, so nothing waits on site.

Where a project needs dimensions, frame finish or curtain colour adjusted to the design, this is a specification change rather than a substitution. Raise it at quotation stage, when the change can be built into production; raising it after production starts usually means re-making curtains and waiting on a new frame run.

Working With One Supplier for the Whole Outdoor Zone

SANTERSON manufactures outdoor furniture alongside building materials and interior fixtures, so pavilions, dining groups, swings, daybeds and the surrounding finishes can be produced against one project specification. That single-source approach removes the two problems that most often surface at handover: finish mismatch between suppliers, and deliveries that arrive in an unusable order. The company's stated workflow runs from design consultation and material selection through production, door-to-door logistics and on-site installation support, which lets a buyer place one package and track it as one package.

For custom dimensions, bespoke finishes or private-label orders, the custom and OEM service covers design and prototyping through to production. For delivery planning, see logistics and door-to-door delivery, and for setting the structures on site, installation and after-sales support.

A Pre-Order Checklist

  • Pavilion positions marked on the landscape plan, each with a prepared base confirmed.
  • Seating layout drawn to scale inside every pavilion footprint, curtains drawn closed included.
  • Unit count agreed, including any buffer units and repeat-phase units.
  • Curtain sets listed against each structure size, not as one generic accessory line.
  • Frame finish sample approved on the actual profile, matched to neighbouring outdoor items.
  • Cushion and curtain textiles approved together for the same zone.
  • Flooring or rug sizes taken from the final structure dimensions.
  • Delivery sequence agreed, with base preparation, structure setting and curtain hanging assigned to named parties.
  • Spares for soft goods listed in the same order as the main package.

Common Questions

Should all pavilions on one site be the same size? Not necessarily. Match the footprint to the seating group each position carries, and keep frame finish consistent across sizes so the site still reads as one design.

Why not order curtains separately later? Curtain drop length and perimeter follow the structure they hang on. Ordering them with the structure in the same production run avoids a second match-up exercise and a second shipment.

What is the single most useful drawing to request before ordering? A scaled plan showing each pavilion with its furniture group inside it, curtains drawn closed. Almost every quantity error in this product family becomes visible on that one drawing.