Wall panelling changes how a room reads faster than almost any other finish, and it is also one of the easiest items to get wrong in an enquiry. A request that simply says "decorative wall panels for the living room" leaves the factory guessing about heights, substrate, edge details and how many cuts the site will need. The more precisely you describe the wall, the closer the first quotation lands to the final invoice.
This guide sets out what we need from homeowners, interior designers and contractors when we quote our Decorative Wall Panel for Interior Home Decoration, a panel in our Wall Panels and Wall Cladding range developed for interior wall renovation in residential and commercial spaces. The same inputs apply to feature walls, bedroom background walls, hallways and surfaces that run into built-in joinery.
Start with the wall, not the panel
Send a simple sketch of each wall you want covered, drawn roughly to scale. Mark three numbers on it: the finished floor-to-ceiling height, the clear width between corners, door reveals or fixed joinery, and the position of every switch, socket, thermostat or air-conditioning register that must be cut through or worked around.
Then say what happens at the top and bottom edges. A panel running to a plasterboard ceiling needs a different trim detail from one stopping short of a cornice, and a wall meeting a tiled floor behaves differently again. Flag these conditions as well:
- Walls that are out of plumb or bowed, with the largest deviation if you have measured it.
- Square reveals, alcoves, radiators, and skirting that will be removed or retained.
- Inside and outside corners, including curved or arched returns.
- Heated wall surfaces, or walls with pipework running behind them.
If you have drawings, send the relevant elevations as a PDF with dimensions visible. A photograph of each wall, taken straight on rather than at an angle, tells us about existing condition in a way no sketch can.
Decide the coverage pattern before you count panels
Full-wall coverage and a partial feature panel are different problems. A full wall is ordered by area, with cutting waste calculated against your layout. A headboard-height background panel or a television wall is usually dimensioned as a framed rectangle, where the border detail does most of the visual work.
Tell us which you want, and where the panel edge should fall relative to fixed items: the top of a sofa back, the shoulder height of a bed, the underside of a floating shelf. Those relationships decide whether we recommend a vertical run, a horizontal band or a grid, and they are far cheaper to settle at quotation stage than on site.
Where panelling has to be integrated with built-in storage, niches or room dividers rather than applied over an existing wall, our Wall Panel Systems are specified from the drawings instead of being fitted on top of the substrate.
Choose the surface and the feel you want
Our interior decorative panels are made in a range of textures and colours, from flat minimalist faces to deeply profiled finishes that catch light differently across the day. Two observations settle most of this choice:
- How the room is lit. North-facing rooms and narrow hallways flatten relief, while a wall receiving direct afternoon sun throws every profile into shadow.
- What sits against it. A panel competes visually with flooring, drapery and joinery in the same sightline, so match the coarseness of texture to its neighbours rather than judging the sample on a bench.
Where a brief calls for relief rather than a flat face, our Luxury Decorative 3D Wall Panel is made to custom size, colour and pattern, and is cut and handled with standard site tools. Where the design wants something closer to stone or timber without the weight of either, our Modern Decorative Wall Panel for Interior Decoration simulates stone, wood and fabric effects and is customised on dimensions, colours and surface pattern.
Send a finish reference whenever you have one: a mood board, a photograph of a detail you like, a scanned fabric swatch, or a RAL or Pantone number for a painted surface. A named reference removes most of the colour back-and-forth.
Specify the conditions the panel will live in
Interior does not mean uniform. A hallway, a bedroom and a bathroom behind a shower screen place different demands on a wall surface, so state the room type for every location rather than assuming one answer covers the property.
In humid rooms and surfaces that get wiped down often, moisture resistance and a stain-resistant, cleanable face matter more than they do in a study. In rental or family homes, impact resistance at chair-rail height is worth raising early. Where a project needs a mineral, non-combustible sheet that can wrap an arch or a curved return, our Flexible Wood Grain Cement Wall Panel rolls up for transport, is cut, drilled and bent on site, and arrives with a raw surface you can paint to your own colour.
If the same design language continues past the front door or onto a facade, say so at the start. Exterior cladding is built to a different specification from interior panelling; our Aluminum Honeycomb Panel for Building Exterior & Interior Wall Cladding covers that scope with stone-veneer, coated and perforated face options.
The project details that shape the quotation
Alongside the drawings, include these practical items in your enquiry:
- Quantity. Total square metres per wall, or a panel count with each sheet's dimensions - plus whether you want spares ordered with the batch.
- Delivery address and access. Port of entry, ground-floor or upper-level drop, lift size, and any vehicle restriction at the site.
- Fixing method. Adhesive, mechanical fixings or a batten system, since each sets a different flatness tolerance on the wall behind.
- Who installs. Whether your own trades or our team fits the panels changes the format and edge details we recommend.
Because these panels are made to custom specification, the same wall can be quoted several ways depending on sheet format, finish, and how much cutting is done in the factory rather than on site. We would rather show you those options than lock in a single number from an incomplete brief.
How the information moves through the project
Once we have your dimensions and finish references, the sequence is straightforward: we confirm the layout and panel format, issue a quotation with a cutting schedule, produce to the agreed specification, then arrange shipment. Our Furniture Logistics and Door-to-door Delivery service covers freight forwarding, packaging and container loading, customs paperwork and tracking to the address you nominate. Where a project also needs joinery, flooring, lighting or furnishings coordinated against the same wall design, our Turnkey Interior Project Solutions group those scopes into one procurement package.
Installation and after-sales support are available as a named service, and panel-specific fixing guidance travels with the order. Tell us at quotation stage whose crew will fit the panels, so format and edge details are designed around that decision rather than adjusted later.
A short checklist for your enquiry
Before you send a request, confirm it includes: room-by-room elevations with heights and clear widths; the position of every service penetration; the intended top and bottom edge detail; the finish reference or colour code; the room type and exposure to moisture; total area or panel count with spares; the delivery address with access notes; and the installation route. With those inputs we can return a layout, a cutting schedule and a firm quotation instead of a list of questions.
Send your drawings with the details above and we will come back with a layout, panel options and a quotation built on your measurements, not a generic catalogue price.