A swim spa specification sheet tells you what is fitted. It does not tell you whether the unit will arrive, lift onto a slab, connect to supply and drain, and stay running five years later. The checklist below follows one model from our range, the Outdoor Swim Spa WS-SP500, through the eight decisions that decide whether a purchase closes cleanly or stalls on site.

1. Confirm the shell footprint and access route, not just the model name

The catalogue lists the WS-SP500 at 5000 × 2500 × 1600 mm. Treat that as the working dimension for setting-out, then check three things against your own drawings: the clear opening on the delivery route, the size of the lifting crane or pallet jack that can reach the position, and the working clearance you want around the cabinet for the pump, filter and control system. A spa that fits the plan often fails on the access route.

Send us the site sketch with dimensions before we quote, and we will confirm whether the unit can be delivered and placed as drawn.

2. Read the fitted equipment line by line

The WS-SP500 specification on our site shows one control system, one swim training system, one filter pump, six jets, four LED lights and a total power figure of 9.35 kW. The water pump is not listed for this configuration. That single line matters: two units that look identical in photographs can differ by a whole circulation pump and by several kilowatts.

Compare the base model with Outdoor Swim Spa WS-SP500-MS, which shows a water pump, 29 jets and 11.55 kW at the same 5000 × 2500 × 1600 mm footprint. If your buyer is comparing prices, they must compare these lines, not the model number alone.

3. Decide which options are in the order and which are site-supplied

Catalogue-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs written confirmation against the exact configuration you are ordering.

ItemWho confirms itWhen
Heat pump and insulation packageSupplier, against the selected modelBefore quotation is issued
UV sterilization / sand filtrationSupplier, compatibility checkBefore production starts
Steps and access seatingBuyer's site levelsAt setting-out
Electrical supply, isolation and protectionBuyer's electrician, to local rulesBefore delivery date is fixed
Water feed, drain and overflow routeBuyer's plumberBefore the slab is poured

4. Check the electrical load against what the site can actually supply

The 9.35 kW figure for the WS-SP500 and 11.55 kW for the WS-SP500-MS are total power figures for the listed configuration, and adding a heat pump changes the load again. Hand those numbers to the project electrician early and ask them to confirm the circuit, cable size, protection device and isolation location. Electrical requirements for the selected configuration should be confirmed with us before production, so the supply is ready when the crate arrives rather than after.

5. Fix the foundation and drainage spec before the slab is poured

A swim spa needs a level, adequately bearing base, and the cabinet houses pumps, filters and controls that need access. Set out the base from the confirmed shell dimension plus service clearance, and plan the drain and overflow fall at the same time. Once concrete is down, corrections are expensive.

6. Agree the delivery and import terms in writing

We arrange freight forwarding by sea, air and rail, with commercial invoices, packing lists, certificates of origin and other customs paperwork, packaging and container loading plans, shipment tracking and door-to-door delivery. For an international order, fix the Incoterms, who pays duty and taxes, whether cargo insurance is included, and exactly where "delivered" ends: kerbside, site gate or the final position. Import terms, duties and transit time are confirmed case by case, and we do not present them as a fixed guarantee.

7. Put installation, inspection and handover into the programme

Our services cover on-site installation, inspection and snagging, warranty coverage, spare parts and replacement, and ongoing maintenance. Build those stages into the project programme with named responsibilities for each party, and record the as-built configuration at handover: model, options fitted, control settings and any site-supplied components. That record is what makes a later spare-part request quick instead of a phone call around three trades.

8. Match the spa to the rest of the outdoor specification

A swim spa rarely sits alone. It shares a terrace with a Modern Aluminum Outdoor Dining Set & Sun Lounger for poolside use, or a lounge grouping such as the Aluminum Cabana Daybed Collection. Where a project needs a different footprint, we also supply a Customizable Shape Outdoor Spa in square, round, oval and curved designs with an acrylic shell and structural reinforcement. Ordering the water feature, seating and shade at one specification stage keeps finishes, levels and lead times aligned.

Before you send the enquiry

  • Site sketch with access route, gate widths and lifting constraints
  • Preferred configuration from the WS-SP500 or WS-SP500-MS specification, plus the options you want priced
  • Electrical capacity available at the position
  • Target installation month and any programme constraints
  • Delivery address and who handles import clearance

SANTERSON has manufactured furniture and building materials for projects since 2008 and works as a one-stop furniture and building materials supplier, covering design consultation, custom/OEM production, logistics and after-sales support in a single specification. Send the five items above and we will return a configuration sheet with the fitted equipment, options and delivery scope stated line by line.