A swim spa that looks right in the showroom can still go wrong on site. The usual causes are not cosmetic — they are a slab that arrives late, an electrical feed that cannot carry the load, or a quoted price that quietly excludes the heat pump. This checklist is built around one model from our range, the Outdoor Swim Spa WS-PC01, so you can see exactly which line items to confirm before a purchase order is raised. The same structure works for any model in the configurable outdoor swim and hydrotherapy range.
1. Confirm the shell size against the clear opening, not the printed footprint
Catalogue dimensions describe the unit itself. What matters on site is the clear space you can give it: a poured plinth or pad built to the exact catalogue outline leaves no room for access panels, drainage falls, or an insulation wrap added later. For WS-PC01 the catalogue dimension is 3000x1050mm; the related Outdoor Swim Spa WS-PC01A shares the same 3000mm length but a different depth, which is usually the deciding factor when a terrace or plant room boundary is fixed.
- Ask for the dimension drawing, not just the marketing measurement, and check whether the stated figure includes steps, handrails or an overhanging coping.
- Decide early between a fully recessed installation, a semi-recessed one, or a unit sitting on a pad. Recessing changes excavation, waterproofing and access requirements, and it is far cheaper to decide before the slab is poured.
- Check delivery access — gate width, turning radius, overhead branches, and whether a crane or forklift is needed at the drop-off point.
2. Read the specification sheet as equipment, not marketing copy
Two units of the same length can behave very differently in use because pump count and jet count drive both performance and running load. The table below reproduces what the catalogue lists for these two models so you can compare like with like.
| Catalogue item | WS-PC01 | WS-PC01A |
|---|---|---|
| Catalogue dimensions | 3000x1050mm | 3000x930mm |
| Control system | 1 set | 1 set |
| Water pump | 2 pcs | 2 pcs |
| Filter pump | 1 pc | 1 pc |
| Jet total | 53 pcs | 28 pcs |
| LED lighting | 1 pc | 1 pc, plus 9 small LED lights |
| Total power (catalogue) | 6.65kW | 3.25kW |
| Features shown in catalogue | Water jets, LED lighting, Ozone | Water jets, LED lighting, Ozone |
These figures come from the catalogue for the standard configuration. Treat them as a starting point and confirm what is included in your quotation, because options change both the equipment list and the power figure.
3. Fix the electrical scope before you order
This is where budgets slip most often. The catalogue total power for WS-PC01 is 6.65kW, and that number does not automatically include every option you may want. A heat pump in particular changes the load calculation, as does any additional pump.
- Confirm supply type for your site — single-phase or three-phase, frequency, and available circuit capacity at the distribution board.
- Ask for the required breaker rating and cable size for the confirmed configuration, then hand that to your local electrician rather than letting them guess from a brochure figure.
- Confirm protective-device requirements and how the unit is to be earthed at site level. Earthing and RCD practice is set by the installation standard in force locally — that is your local contractor's scope, not something a catalogue can settle for you.
- Agree who supplies what: the supplier provides the unit and its control system; the electrician provides the dedicated feed, isolation and protection. Put the boundary in writing so neither party assumes it.
4. Decide which options are in the price and which are extras
Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so a line that exists on one model may not be offered on another.
- Heat pump: decide whether year-round use is intended. A spa used in winter without heating sits idle; heating changes both the purchase price and the running load.
- Insulation: worth pricing at the same time as the shell for cold-climate or exposed installations, because retro-fitting around a finished plinth is awkward.
- Filtration: compare the standard filter pump against an optional sand filtration setup and ask what cartridge or media servicing looks like in practice.
- Steps and access: confirm whether steps are included, bolted, or a separate line item, and check their footprint against your deck layout.
5. Match the unit to how it will actually be used
Jet count is not a vanity number. WS-PC01 lists 53 jets against 28 for WS-PC01A, which is a meaningful difference in massage coverage and in how much water movement the shell can support. For a villa owner who wants resistance swimming plus hydrotherapy seating, pump arrangement matters more than jet count alone; for a hotel or resort treatment room, durability of finishes and ease of daily servicing usually outrank feature lists.
If the spa is one element of a wider outdoor fit-out — outdoor furniture for villas and resorts, pergolas, loungers and poolside storage — order it as part of that package. Coordinated lead times and one consolidated shipment are simpler than chasing separate suppliers.
6. Plan the site works in the right order
- Groundworks first: pad or plinth design, drainage falls, and any recess waterproofing signed off before the unit ships.
- Services second: electrical feed, and water supply and drain points if the installation calls for them.
- Set and level third: levelling and grouting on a cured, verified base, with access panels left clear for pumps and controls.
- Commission last: fill, run each pump and circuit, check the control system, and record readings at handover so later warranty claims have a baseline.
7. Delivery, packaging and after-sales terms
A swim spa arrives as heavy, breakable cargo, so logistics questions belong in the quotation stage. Confirm Incoterms, who handles customs clearance, container loading method, and whether crate dimensions fit your site access. Our logistics and door-to-door delivery service covers freight coordination and paperwork; the import duties, permits and local connections on your side stay with you and your contractor, so agree that split before shipping.
Then read the after-sales terms closely: what is covered, for how long, which parts are treated as consumables (seals, cartridges, jet inserts), and how a fault is raised when the installer and the manufacturer are different companies. Our installation and after-sales support page describes what we handle; ask for the written terms for your specific configuration rather than assuming range-wide coverage.
8. If it is part of a project, buy it as part of the package
For villa and hospitality projects, a swim spa specified in isolation tends to arrive out of sequence with flooring, wall finishes and joinery that have to meet it. Specifying it inside a turnkey interior project solution means one party coordinates the spa against cabinetry, outdoor furniture, lighting and bathroom fixtures, with a single production schedule and consolidated shipment.
Where a standard shell needs to change — a different length or depth for a tight terrace, or a bespoke surround — ask about our custom furniture and OEM service, which covers design and prototyping, material and finish selection, and flexible order quantities. For fully shaped hydrotherapy basins rather than rectangular shells, see the Customizable Shape Outdoor Spa, which supports square, round, oval and curved layouts in an acrylic shell with structural reinforcement.
Nine questions to send with your enquiry
- Which equipment is included in the quoted price for this configuration, and which options are priced separately?
- What is the total connected load with my chosen options fitted, and what supply and protection does that require?
- Can you provide the dimension drawing showing clear access requirements?
- Is the unit suitable for recessed installation, and what waterproofing detail do you recommend?
- What filtration is standard, and how often are cartridges or media replaced?
- Which steps, handrails or coping details are available for this model?
- What packaging dimensions and weights should my site access accommodate?
- What warranty applies to shell, pumps, controls and LEDs, and what is excluded?
- Who commissions the unit on site, and what training or documentation comes with handover?