Stone and marble read simply on a mood board and complicate quickly on site. A panel that looks right in a render can still fail at handover if the person who chose the finish never agreed with the people who supply, ship and fix it: where each piece starts and stops, how thick the build-up is, what sits behind it, and which drawing carries the final dimensions. The alignment points below are the ones that matter when specifying Santerson Stone & Marble Panels in a villa, hotel or residential fit-out — and what to settle before an order is released.

Start From One Scope Document Both Sides Sign

Rework rarely begins with the material. It begins with two teams working from different documents. A designer's finish schedule usually names a stone type and a general location; a supplier needs a room-by-room schedule stating wall area, panel layout, edge conditions and the interface with adjacent finishes — joinery, flooring, skirting, glazing, mirror, lighting and ironmongery.

Before any finish is fixed, ask for one consolidated scope document. It should list every wall on which stone or marble appears, the quantity per wall, and the trade responsible for the substrate behind it. Where a panel abuts our custom joinery or a wall panel system, draw that junction rather than leaving it to site interpretation.

Agree the Application Before the Finish

The same stone tone behaves differently on a dry hallway wall, a shower surround and a reception feature wall. Specify the application first, then shortlist finishes against it:

  • Dry interior feature walls. Priority goes to veining direction, slab matching across joints, and how the panel meets reveal lines and concealed lighting.
  • Bathrooms and wet zones. Priority goes to substrate preparation, falls, movement joints, and how stone meets basins, tapware set-out and shower niches. Our Santerson Stone & Marble Surfaces range of countertops and basins is made to measure, so the vanity cut-out and the wall schedule must be issued together.
  • Partitions and cladding inside a fitted scheme. Priority goes to the fixing method, and to whether panels can be demounted where services sit behind them. The Stone & Marble Panels item in our Custom Partitions & Paneling collection is configured per project for size, layout, material and finish.

Where a project wants the look of stone without the mass of a solid slab — a curved wall, an arched soffit, a retrofit over existing plasterboard — flexible mineral cladding is a separate specification decision, not a substitution. Our MCM Flexible Travertine Stone Veneer and flexible rock stone panel are thin, bendable sheets that wrap curved and shaped surfaces and can be rolled for shipping, which reduces wall load and freight volume. Their build-up differs from a made-to-measure marble panel, so any swap should go through an agreed variation.

Dimensions: Who Measures, and When

Made-to-measure stone only works when the measurement follows a finished substrate rather than an architectural plan. Settle three points in writing:

  • The datum. Which floor finish level and which wall face the dimensions come from, including adhesive or batten build-up.
  • The measurement stage. A site survey after first fix, then a confirmation check before production. Panels cut to a drawing that predates the plaster will not fit.
  • The setting-out drawing. Joint positions, vein direction, book-matched pairs and every cut-out for sockets or taps, shown on one version-numbered drawing both sides hold.

Our paneling and surfaces ranges are produced to project-specific dimensions, with material and finish selected per space. That flexibility pays only once the dimension set is frozen; a change issued after cutting has begun is the costliest revision in a stone package.

Samples, Approvals and the Paper Trail

A screen image of veining says almost nothing about how a slab reads at three metres under warm LED. Before production each side should hold a physical sample of the exact finish, an approved setting-out drawing, and — where the joint detail is critical — a signed-off mock-up.

Record the approval against a reference number on the purchase order: finish code, thickness, edge treatment, surface treatment, quantity per wall, and the tolerance allowed for site adjustment. Performance claims such as fire behaviour, water resistance or freeze-thaw performance should be confirmed from the documentation for the configuration you ordered rather than inferred from catalogue copy — especially where a submittal goes to a certifier or head contractor.

Logistics and Sequencing Belong in the Specification

Stone packages miss programme as often as they miss quality. Agree who arranges freight, packaging and container loading; which delivery window the site can actually receive; where panels are stored on arrival; and how fixing is sequenced against wet trades, joinery and flooring. Rigid slabs need a clear route to the room and enough hands to place them. Flexible cladding sheets arrive rolled and are cut on site with simple tools — a genuine difference in labour, access and waste.

We arrange freight by sea, air and rail with customs paperwork, packing lists and shipment tracking through to door-to-door delivery. Where a project coordinates stone alongside joinery, ceramics, lighting, flooring and outdoor furniture, sourcing the package from one manufacturer shortens the interface list; that is the purpose of our Turnkey Interior Project Solutions.

A Pre-Release Checklist for Stone Packages

  • One scope document covering every stone surface, with quantities per wall.
  • Application confirmed for each location: dry wall, wet zone, partition or curved cladding.
  • Site survey after substrate completion; setting-out drawing version-numbered and signed.
  • Physical sample approved, with finish code, thickness, edge and surface treatment on the order.
  • Cut-outs for tapware, sockets, niches and lighting checked against services drawings.
  • Delivery window, storage location and fixing sequence agreed with the site programme.
  • Performance documentation requested for the exact configuration, not the product family.

Bring Both Sides Into One Conversation

These questions settle quickly when the designer and the buyer are looking at the same drawing. Send us your room schedule and whatever setting-out you have so far: we work from your drawings and a site survey, confirm dimensions and finish for each space, produce the panels in our factory, and coordinate delivery through to on-site installation support. We will flag the junctions that need detailing — and tell you where a flexible cladding option serves the design better than a rigid slab.